HTB Baugesellschaft mbH from Nueziders secured the EUR 4.92 million contract, excluding VAT, for securing existing utility lines, constructing the cut-and-cover structure for the main city road tunnel at Feldkirch, preliminary excavation for the main tunnel, rerouting of Duxgasse with utility relocations, and constructing the portal structure with architectural design. Contact Land Vorarlberg, Feldkirch, email land@vorarlberg.at, tel +43 55745110, fax +43 5574511920095. Visit https://ted.europa.eu/en/notice/-/detail/760277-2025. Ref.n. VIIb-291A-1/2015. 47/25.