The consortium PORR Bau GmbH/Rhomberg Sersa Bahntechnik GmbH from Vienna secured the EUR 76.26 million contract, excluding VAT, for supply and installation of track support slabs (GTP) for the fixed track (FF) in the Semmering base tunnel, within the framework of the new Gloggnitz – Mürzzuschlag route. Contact OEBB-Infrastruktur AG, att.ne Peter Csoengei, Vienna, tel +43 664 9603380, email peter.csoengei@oebb.at. Visit https://ted.europa.eu/en/notice/-/detail/203096-2025. Ref. Provia n. 106056. 14/25.