Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

France

France, Pau - Saragossa - fr/52

Railway

The ministry of development has awarded to AEPO a €862,000 engineering contract for the design studies for the reopening of the international tunnel on the Saragossa-Pau railway and upgrading of Canfranc station. SNCF, the French state rail company, and RFF, the rail network operator, have trebbled their estimate to renovate the 85 km section in France. €300 million would have to be invested to reopen the line. In Spain, the budget is estimated at €360.6 million. Read E-News Weekly # 30. Visit www.aepo.es 07/03.



Permalink

Negotiated invitation to tender, deadline 24.05.2018, for geotechnical surveys on the Pau - Canfranc railway line, 25 km of which 6 km will be in tunnels, from Bedous station to the Somport tunnel adit (Lots 1 and 2, tranche 2) to assess the condition of existing infrastructures (walls, tunnels and bridges) and plan the renovation works. Contact SNCF Reseau, Bordeaux, tel +33 547471949, fax +33 427011235, email marc.arlabosse@reseau.sncf.fr.

For bid documents http://www.sncf.com/fr/fournisseurs/avis-de-marche  where offers must be sent. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=196309-2018 .Ref.n. 50937. 19/18.



Permalink

Geotec Sud-Ouest from Lescar secured the EUR875,000 contract for geotechnical surveys on the Pau - Canfranc railway line, 6 km will be in tunnels, from Bedous station to the Somport tunnel adit (Lots 1 and 2, tranche 2) to assess the condition of existing infrastructures (walls, tunnels and bridges) and plan the renovation works. Contact SNCF Reseau, Bordeaux, tel +33 547471949, fax +33 427011235, email marc.arlabosse@reseau.sncf.fr. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=084269-2019.

Ref.n. 50937. 08/19.



Permalink


Open invitation to tender, deadline 07/01/2021, for the study for the re-opening of the railway Somport tunnel, 7875 m long with 4012 m in France and 3863 in Spain, on the Pau - Canfranc railway line. For tender documents click here and for further information on tender click here. Value of the contract is EUR1.10 million, excluding VAT. Duration of the contract 33  months. Contact Subdireccion General de Planificacion Ferroviaria, Madrid, email ferrocarrilessgpp@fomento.es. Ref.n. 2020F2230410. 49/20.

 




Permalink


Tecnica y Proyectos SA  from San Sebastian secured the EUR814,000 contract, excluding VAT,  for the study for the re-opening of the railway Somport tunnel, 7875 m long with 4012 m in France and 3863 in Spain, on the Pau - Canfranc railway line. Contact Subdireccion General de Planificacion Ferroviaria, Madrid, email ferrocarrilessgpp@fomento.es. For further information click here - Ref.n. 2020F2230410. 16/21.

 




Permalink