Spain

Spain, Asturias - es/62

Highway

Open invitation to tender, deadline 26th October, 2001, for engineering design of Ballota-Cadavedo section of A8 motorway including one tunnel. Contact Ministry of Works, Madrid, fax +34 91 5978537. Visit www.boe.es 41/01.A EUR838,260 contract has been awarded to Fulcrum and Incosa to manage construction and control works of the Ballota-Cadavedo section on the Cantabrian highway A-8 in Asturias. This 5.6 km section includes a 200 m-long twin cut-and-cover tunnel in El Ribon. Subscribe to E-News Weekly 5/2004, 48/2003 and 39/2003. Visit www.fulcrum.es and www.incosa.net 28/04.Open call for tenders, deadline 28th December, 2005 for construction of section Grado west-Doriga on highway A-63 Oviedo-La Espina. This 4.2 km section includes the El Fresno tunnel, a twin bored tunnel. The left roadway tunnel is 949 m long (904 m mined and 45 m in cut-and-cover) and the right roadway tunnel is 923 m long (878 m mined and 45 m in cut-and-cover). Both are characterised by an approx. 0.6% gradient. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=231896-2005, OJ S 235, or contact the Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 50-51/05.Open call for tenders, deadline 30th June, 2006 for work control and inspection during construction of section Grado west-Doriga on highway A-63 Oviedo-La Espina. This 4.2 km section includes the El Fresno tunnel, consisting of a left roadway tunnel (949 m) and right roadway tunnel (923 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=098653-2005, OJ S 92, or contact the Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 22/06.Acciona received a EUR63.3 million contract to construct section Grado west-Doriga on highway A-63 Oviedo-La Espina. This 4.2 km section includes the El Fresno tunnel (920 m and 950 m) and a 1.7 km branch. Visit www.acciona.es 23/06.Open call for tenders, deadline 4th September, 2006 for construction of section Las Duenas-Muros del Nalon on the Cantabrian motorway A-8. The north carriageway spans 8,050 metres while the south carriageway has a length of 8,070 metres. The section includes three twin-tube tunnels, totalling over 1.200 metres. On the first seven kilometres, each roadway carries two 3.5 m-wide lanes and shoulders (2.5 m and 1 m). They are separated by a septum of four metres. The last kilometres carries three lanes. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=114304-2006, OJ S 107, or contact SEITT, Madrid, fax +34 915916630. E-mail jmdorrego@seitt.es 24/06.Open call for tenders, deadline 4th September, 2006 for on-site supervision during construction of section Las Duenas-Muros del Nalon on the Cantabrian motorway A-8. The section includes three twin-tube tunnels, totalling over 1,200 metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=128203-2006, OJ S 120, or contact Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 29/06.FCC received a EUR95.3 million contract for construction of section Las Duenas-Muros del Nalon on the Cantabrian motorway A-8. The north carriageway spans 8,050 metres while the south carriageway has a length of 8,070 metres. The section includes three twin-tube tunnels, totalling over 1.200 metres. Visit www.fcc.es 48/06.Iberinsa secured a EUR1.5 million contract for site supervision during construction of the Las Duenas-Muros del Nalon section on the Cantabrian motorway A-8. Three twin-tube tunnels, totalling over 1,200 metres, will be built. Visit www.iberinsa.es 01-02/07.Open call for tenders, deadline 6th November, 2007 for construction of the Unquera-Pendueles section on the Cantabrian motorway A-8. This 11.8 km section includes the Santiuste tunnel, to be built in rock using NATM, with lengths of 520 metres (seaside tube) and 820 metres (hillside tube), and the 410 m El Peral cut-and-cover tunnel between road N-634 and the FEVE railway. In compliance with the Royal Decree 635/2006, the two tunnels will be equipped with emergency exits; drainage of toxic liquids; CCTV; automatic and manual system for smoke extraction; normal, safety and emergency lighting; ventilation; emergency generators; uninterrupted energy supply system; CO sensors; opacimeters; fire detection cables; automatic incident detection; signage of exits and emergency equipment; horizontal and vertical signage; variable message panels; closing barriers and traffic lights at the portals; loudspeakers; SOS stations; hydrants; and flowmeters. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234622-2007, OJ S 193, or contact Ministry of development, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@fomento.es 42/07.FCC and Alvargonzí¡lez received a EUR106.8 million contract to build the Unquera-Pendueles section on the Cantabrian motorway A-8. This 11.8 km section includes the Santiuste tunnel (520 m / 820 m), and the 410 m El Peral cut-and-cover tunnel. Click es/62 for more. Visit www.fcc.es 12/08.Euroconsult bagged a EUR1.6 million contract to supervise the construction of the 11.8 km Unquera-Pendueles section on the Cantabrian motorway A-8, including the Santiuste tunnel (520 m / 820 m), and the 410 m El Peral cut-and-cover tunnel. Visit www.euroconsult.es 36/08.



Permalink


SICE-Collosa Joint Venture from Valladolid bagged the EUR 8.47 million contract, excluding VAT, for the adaptation to RD 635/2006  of  El Carmen (100 m), Llovido (450 m), Tenanzos (500 m), Ordovícico del Fabar (1500 m), Arena de Morí (265 m) and Duesos (149 m) tunnels on the Cantabrian motorway A-8. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax +34 915978547, email dgc.licitaciones@fomento.es. For further information on the tender click here Ref.n. 254193361100. 48/20. 



Permalink


Open invitation to tender, deadline 08/02/2022, for the control and supervision during upgrading of the tunnels Angel Uriel (300 m) and El Padrun (1782 m) on the A-66. For tender documents, click here. Value of the contract will be EUR397,198.20, excluding VAT. Duration of the contract is 29 months. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax  +34 915978547, email dgc.licitaciones@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=674956-2021. Ref.n. 230213362300. 01/22.

 


Spain-Madrid: Consultative engineering and construction services

2021/S 255-674956

Contract notice

Services

Legal Basis:

Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses

Official name: Dirección General de Carreteras
National registration number: S2817015G
Postal address: Paseo de la Castellana 67 - Despacho B750
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28071
Country: Spain
Contact person: Dirección General de Carreteras
E-mail: dgc.licitaciones@fomento.es
Telephone: +34 915978341
Fax: +34 915978547
Internet address(es):
Main address: http://www.fomento.es
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=bbqeQ9uN6YE%3D

I.5)Main activity

General public services

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

PYO 501/22 Control y vigilancia de adecuación de túneles Ángel Uriel y Padrún Provincia de Asturias. Plan de recuperación transformación y resiliencia financiado por Unión Europea Next Generation EU

Reference number: 230213362300

II.1.2)Main CPV code

71310000 Consultative engineering and construction services

II.1.3)Type of contract

Services

II.1.5)Estimated total value

Value excluding VAT: 397 198.20 EUR

II.1.6)Information about lots

This contract is divided into lots: no

II.2)Description

II.2.3)Place of performance

NUTS code: ES12 Principado de Asturias

II.2.6)Estimated value

Value excluding VAT: 397 198.20 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 29

This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 08/02/2022

Local time: 19:00

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages in which tenders or requests to participate may be submitted:

Spanish

Section VI: Complementary information

VI.5)Date of dispatch of this notice:

27/12/2021




Permalink


Open invitation to tender, deadline 23/09/2022, for the adaptation project for the AP-66 motorway tunnels by Royal Decree 635/2006. For  tender documents, please click here. Value of the contract is EUR 81.12 million, excluding VAT. Duration of the contract will be 41 months. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax +34 915978547,  email dgc.licitaciones@fomento.es.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=451732-2022. Ref.n. 254223364200. 37/22 

 

Spain-Madrid: Construction, foundation and surface works for highways, roads


2022/S 159-451732

Contract notice

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Dirección General de Carreteras
National registration number: S2817015G
Postal address: Paseo de la Castellana 67 - Despacho B750
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28071
Country: Spain
Contact person: Dirección General de Carreteras
E-mail: dgc.licitaciones@fomento.es
Telephone: +34 915978341
Fax: +34 915978547
Internet address(es):
Main address: http://www.fomento.es
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=bbqeQ9uN6YE%3D
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


52-O-6420; 54.674/22 Proyecto de adecuación de los túneles de la Autopista AP-66 al Real Decreto 635/2006. Plan de Recuperación, Transformación y Resiliencia financiado por la Unión Europea NEXT GENERATION EU.


Reference number: 254223364200
II.1.2)Main CPV code
45233000 Construction, foundation and surface works for highways, roads
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 81 120 074.99 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES120 Asturias
II.2.6)Estimated value
Value excluding VAT: 81 120 074.99 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 41
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 23/09/2022
Local time: 15:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Spanish

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
16/08/2022



Permalink

Spain, Huesca - es/61

Motorway

Open invitation to tender, deadline 10th October, 2001, for engineering design for Aragon motorway link between N-330 and N-121, including tunnels. Contact Ministry of Works, fax +34 91 597 8536 or visit www.boe.es 41/01. Open call for bids, deadline 18th September, 2002 for construction of a Pyrenean trunk road between Sabií±í¡nigo and Fiscal in Aragon. Includes two tunnels (2,598 m and 164 m). Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=117424-2002, OJ S 148, or contact Ministry of development, Madrid, fax +34 915978537. E-mail cpublic@mfom.es 33/02. The ministry of development has awarded to a JV formed by Constructora Pirenaica and Vialex Roldí¡n Constructora Aragonesa a €59.7 million contract to build section Sabií±í¡nigo-Fiscal on the Pyrenean trunk road N-260. This new road will link the Alto Gí¡llego and Sobrarbe counties, shortening travel time by 20 minutes and the distance by 29 km. The 23.2 km road will cross the Pedralba hill with a 2,598 m tunnel. There will be refuges every 370 metres and a rescue tunnel under the carriageway accessible by vehicles. There will also be a 163 m tunnel, three bridges and five viaducts. Time frame for construction: three years and two months. Visit www.copisa.com 06/03.Open call for bids, deadline 7th October, 2003 for work supervision during construction of the Sabií±í¡nigo-Fiscal section, including two tunnels (2,598 m and 164 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=130081-2003, OJ S 143, or contact Ministry of development, Madrid, fax +34 915978537 or 8470. E-mail plicas-carreteras@mfom.es 33/03.Prointec secured a EUR1.9 million contract for construction management and work control of the Sabií±anigo-Fiscal section on road N-260 in Catalonia, including two tunnels of 2,598 m and 164 m. Visit www.prointec.es 11/04.Open invitation to tender, deadline 26.02.2009, for dualling of 3,856 m of N330 including construction of second tube for 2,885 m-long Caldearenas tunnel together with crosspassages, to form part of A23 motorway in Huesca province. Contract value EUR100 million, duration 40 months. Specs and docs from Centro de Publicaciones del Ministerio de Fomento, Madrid, e-mail cpublic@fomento.es, fax +34 915978470. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=337793-2008. 02/09.



Permalink

Copisa Constructora Pirenaica e Vialex Roldan Constructora Aragonesa secured the EUR18.4 million contract for the complementary work, including tunnel equipment, for the Sabinanigo-Fiscal section of the Pyrenean trunk road N-620 from Sabinanigo to France Border (Port Bou). Contact Fomento, Madrid, tel +34 915978-341, fax -547, e-mail calgaba@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=329475-2011. 43/11.



Permalink

FCC Construccion SA secured the EUR13.1 million contract for the connection of the start of the Arguis-Alto de Monrepos section on autovia Mudejar A23 with the Tunnel Control Centre, and for the equipment upgrading of the 1.5 km-long Alto Aragon n.1 tunnel. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax +34 915978547, e-mail jgcid@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399917-2013. Ref. n. 12-HU-5711. 49/13.



Permalink

Spain, Basque Region - es/60

Motorway

A1 motorway between Vitoria-Gasteiz and Eibar requires 11 m-diameter twin-tube NATM tunnels using bolts, mesh, steel arches and sprayed concrete. Lezarri 1.22 km and Gallastegi 2.34 km are in sandstone, flysch and limestone, and 12.5 m-diameter Eitza 720 m-long in black siltstone, grey calcareous sandstone, volcanic and basalt rock. Design by Prointec, construction by jv of Moyua/Murias/Galdiano/Altuna y Uria for completion October, 2002. Visit www.prointec.es October 2000. Open invitation to tender, deadline 14th June, 2001, for design/build contract for the Arlaban-Eskoriataza motorway in the Basque country, including several tunnels for DTC, fax +34 943 429417. Visit www.boe.es 23/01. Open invitation to tender, deadline 9th July, 2001, for engineering supervision of Basque motorway section Arlaban-Eskoriataza including two NATM tunnels length 3.3 km and 360 m for DTC, San Sebastian, fax +34 943 429417. Visit www.mma.es 25/01. Preannouncement of requirement for technical assistance for construction of Arrasate Norte to Bergara Sur section of Vitoira to Vitoria-Gasteiz to Eibar motorway with 1.16 km-long tunnel for DTC, fax +34 94 343 9417. Visit www.boe.es 40/01. Open tendering, deadline 10th December, 2001, for subsection south of the Arrasate Norte-Bergara Sur section of the Vitoria Gasteiz-Eibar highway including the Ikastaundi tunnel, 2 x 1,150 m-long, 112 sq m. Drill/blast in shales and limolites. Support using anchoring bolts, wiremesh, and shotcrete as well as TH-29 steel supports on 25% of the length. Cost of Ptas440 million financed by the Guipuzkoa Province government. Design by Fulcrum. Work to start mid-February, 2002. Time frame of 30 months. Visit http://ted.eur-op.eu.int, document S 217-148991 or contact Diputacií³n Foral de Guipuzkoa, San Sebastian, fax +34 94 3429417. 48/01. A jv of Construcciones Moyua, Construcciones Murias, Construcciones Altuna y Uria, and Construcciones Galdiano has been chosen to build subsection south of the Arrasate north-Bergara south section of Vitoria Gasteiz-Eibar motorway. Includes the 2 x 1,150 m Ikastaundi tunnel. Contract value €40.6 million. Visit www.muriasgrupo.com and www.galdiano.com 25/02. Open call for bids, deadline 14th July, 2003 for equipment of three double tunnels on the Arrasate-Bergara north section of the Vitoria-Gasteiz - Eibar highway: San Marcial (1,490 m + 1,515 m), Aristi (2 x 370 m) and Ikastaundi (1,590 m + 1,607 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=090145-2003, OJ S 101, or contact Diputacií³n Foral de Guipuzkoa, Donostia-San Sebastií¡n, fax +34 943429417. E-mail lareitio@garraioa.gipuzkoa.net 23/03. Open invitation to tender, deadline 28th November, 2003 for technical assistance to the design of section Eskoriatza north-Arrasate north on highway A-1. Three twin-tube tunnels will be built: Apotxaga (340 m / 370 m), Iruzieta (220 m / 233 m) and Gurutzetxiki (681 m / 699 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=182207-2003, OJ S 202, or contact Agencia guipuzcoana de infraestructuras, Donostia-San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net. Also visit www.gipuzkoa.net/concursos 44/03.Open invitation to tender, deadline 28th November, 2003 for technical assistance as part of the follow-up, checking and reporting prior to the work supervision of section Eskoriatza north-Arrasate north on highway A-1. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=182208-2003, OJ S 202, or contact Agencia guipuzcoana de infraestructuras, Donostia-San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net. Also visit www.gipuzkoa.net/concursos 44/03. Open call for bids, deadline 6th April, 2004 for construction of the Arlaban-Eskoriatza north section of highway Vitoria-Gasteiz - Eibar. This section includes the Arlaban twin-tube tunnel, 3.3 km in length. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=032277-2004, OJ S 37, or contact Bidegi, Donostia-San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 12/04. The six JVs bidding for the construction of the Arlaban-Eskoriatza section of motorway A-1 that will link Eibar to Vitoria are: ACS Dragados / Excavaciones Vda. de Sainz / Urssa; Necso / Excavaciones Orsa; FCC / Gedi / Construcciones Sukia / Asfaltos Naturales de Campezo / Obras Subterraneas; Construcciones y Promociones Balzola / Corsan-Corviam / Nortunel; Ferrovial Agroman / Construcciones Sobrino; and Construcciones Moyua / Altuna y Uria / Construcciones Galdiano / Construcciones Amenabar. This 10 km section will be the costliest road infrastructure in Gipuzkoa province with EUR205 million. It includes the 3,377 m Arlaban tunnel, the 400 m Zarimutz tunnel and five viaducts. To avoid any delay, the Gipuzkoa province will fine the builders. The contract stipulates that every day behind schedule, the builders will pay a EUR200,000 fine, which is EUR6 million a month. Construction will start in July for completion at end-2007. 20/04.Open call for bids, deadline 18th June, 2004 for construction management of the Arlaban-Eskoriatza north section of motorway Vitoria-Gasteiz - Eibar. This section includes the 3,377 m Arlaban tunnel and the 400 Zarimutz tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=078214-2004, OJ S 98, or contact Bidegi, Donostia-San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 22/04.Ferrovial Agroman and Construcciones Sobrino will build the Arlaban-Eskoriatza section on the Eibar-Vitoria highway, for EUR191 million. Time frame: 34 months. This 10.48 km section includes the 2 x 3,377 m Arlaban tunnel, which will be the longest tunnel of the Basque region, and the 2 x 400 m Zarimutz tunnel. Visit www.ferrovial.es 38/04.Open call for bids, deadline 12th November, 2004 for quality management testing during construction of section Arlaban-Eskoriatza north on the Eibar-Vitoria highway. This 10.5 km section includes the 2 x 3,377 m Arlaban tunnel and the 2 x 400 m Zarimutz tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=159985-2004, OJ S 188, or contact Bidegi, San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 41/04.Open call for bids, deadline 10th May, 2007 for installation work of the safety equipment in the 2 x 3.4 km Isuzkitza (former Arlaban) tunnel and the 2 x 400 m Zarimutz tunnel on the Arlaban-Eskoriatza North section on the Eibar-Vitoria motorway. Click here. Read E-News Weekly 16/2007 & 11/2007. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=82820-2007, OJ S 68, or contact Bidegi, San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 16/07.Open call for bids, deadline 10th May, 2007 for installation work of the safety equipment in the three tunnels on the Eskoriatza North-Arrasate North section on the Eibar-Vitoria motorway. These tunnels are Apotxaga (340 m / 370 m), Iruzieta (220 m / 233 m) and Gurutzetxiki (681 m / 699 m). Read E-News Weekly 34/2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=82821-2007, OJ S 68, or contact Bidegi, San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 16/07.Elektra, Indra Sistemas and Ikusi Angel Iglesias received a EUR18.8 million contract for installation work of the safety equipment in the 2 x 3.4 km Isuzkitza (former Arlaban) tunnel and the 2 x 400 m Zarimutz tunnel on the Arlaban-Eskoriatza North section on the Eibar-Vitoria motorway. Visit www.elektra-sa.es, www.indra.es and www.ikusi.es 25/07.Acisa, Emte and Construcciones Amenabar bagged a EUR6.5 million contract for installation work of the safety equipment in the three tunnels on the Eskoriatza North-Arrasate North section on the Eibar-Vitoria motorway. These tunnels are Apotxaga (340 m / 370 m), Iruzieta (220 m / 233 m) and Gurutzetxiki (681 m / 699 m). Visit www.acisa.es and www.grupemte.com 25/07.



Permalink

Spain, Navarre - es/59

Highway

Open tendering for technical assistance for the Arce-Oroz Betelu stretch of the Itoiz-Garralda variant of road NA-2040, including an 840 m tunnel to cross Mount Carrovide using drill/blast, roadheader or hydraulic hammer. Visit www.cfnavarra.es/obraspublicas 41/01. Preinformation notice for the construction of the Itoiz-Garralda highway including a 740 m tunnel. Tender value €12.6 million. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini, OJ S 105, document 82829-2002 or contact Gobierno de Navarra, Pamplona, fax +34 948423433. 24/02. Open call for bids, deadline 4th November, 2002 for construction of the road NA-2040 bypass in Itoiz-Garralda, section Arce - Oroz-Betelu, including a 740 m tunnel. Tender value €10.2 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=152178-2002, OJ S 193, or contact Navarre government, Pamplona, fax +34 948423433 or 948427549. Also visit www.cfnavarra.es/obraspublicas More in E-News Weekly # 35. 41/02.Award to ACS of a €8.4 million contract to build a 3.1 km road bypass in Itoiz-Garralda, section Arce-Oroz Betelu. The job requires a 740 m-long tunnel. Visit www.grupoacs.com 05/03.



Permalink

Spain, - es/58

Malaga - Light Rail

Malaga - es/58Light RailOpen invitation to tender, deadline 17th September, 2001, for preliminary engineering of Malaga metro for GIASA, fax +34 95 5007477. Visit www.giasa.com 36/01. Open invitation to tender, deadline 15th October, 2001, for engineering design of Las Pedrizas section including tunnels. Contact Ministry of Works, fax +34 91 597 8536. Visit www.boe.es 39/01. Nine bids presented for the preliminary design of the five light rail lines in Malaga: Urbaconsult, Cener; UBS, Estudio Pereda, Geocontrol; Ghesa, TRN, Cemosa; Inocsa, BB & Consult; Ineco, Narval, Metropolitana Milanese; Consultrans, Aepo; Omicron, Idom, Semaly; Typsa; and Prointec. Total length of light rail network will be 28 km, of which 23% in tunnels. Cost around Pta64 billion, of which Pta50 billion for infrastructure. Commissioning scheduled for 2005. 41/01. Design of light rail network awarded to jv of VS Ingenierí­a, Geocontrol, and Estudios Pereda-4 for Euro1.1 million. Time frame of one year. Assignment consists in corfirming the proposed five lines: Paseo de los Tilos-Teatinos, Carretera de Cí¡diz-Teatinos, Centro-Ciudad Jardí­n, Centro-Suí¡rez, and El Palo-Muelle Heredia, and determining the route alignments. Visit www.giasa.com 46/01. Several contenders are to compete for the privately-financed project, 23% of which will run underground. To date, the two known teams are: FCC, Automí³viles Portillo and CETSA; ACS and Alsina Graells. Project valued at €400 million. 13/02. The preliminary studies for the city's light rail lines have been presented. The 22 km network will run 50% below the surface. Four lines: Line 1 Teatinos-Malagueta, Line 2 Carretera de Cí¡diz-Malagueta, Line 3 Malagueta-El Palo and Line 4 Avenida de Andalucí­a-Ciudad Jardí­n. Six alignment options for Line 1, two for Lines 2 and 3 and three for Line 4. The €250 million first phase (Lines 1 and 2) totals 10 km (half in tunnel). Construction start expected in 2004 for completion scheduled in 2007-2008. Second phase (Line 3) is estimated at €98-115 million and phase 3 should cost €106-119 million. Phase The project is now entering in the public inquiry phase. Overall cost of €530 million. 25/02.Core drilling contract awarded to Cemosa for €21,454. Work has commenced in 28 different locations throughout the city to determine the route alignment of the first two lines which will link Teatinos and La Malagueta and La Malagueta and the Martí­n Carpena Sport Complex. 48/02.Open call for tenders, deadline 14th April, 2004 for design, construction, acquisition of the rolling stock and operation under concession during 35 years of Lines 1 and 2 of Malaga's light rail. Budget: €374.2 million plus €19.2 million for putting underground Line 1 in Teatinos. Infrastructure cost: €280.5 million. Line 1 goes from La Malagueta to Teatinos (7.2 km) and has 12 stops. Line 2 goes from La Malagueta to Martí­n Carpena (6.3 km) and has 10 stops. 75% of the lines will run underground, at an average depth of 7 to 13 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194047-2003, OJ S 216, or contact Junta de Andalucí­a, fax +34 955058047 or 7465. E-mail consejeria.copt@juntadeandalucia.es. Read E-News Weekly 3/2003. 47/03.Open call for bids, deadline 9th March, 2004 for technical assistance during inspection of the buildings near the alignment of Lines 1 and 2 of Malaga's light rail. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=012781-2004, OJ S 15, or contact Ferrocarriles Andaluces, Seville, fax +34 55007573. E-mail maryam.ferreras@ferrocarrilesandaluces.com. Click es/58. 06/04.Open call for bids, deadline 12th March, 2004 for design of Line 3 of the city's light rail. This 6,970 m line between La Malagueta and El Palo will run totally underground. Tender budget: EUR2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=017229-2004, OJ S 20, or contact Ferrocarriles Andaluces, Seville, fax +34 955007573. E-mail maryam.ferreras@ferrocarrilesandaluces.com 07/04.The four JVs to build and operate the two light rail lines are: Ferrovial, Necso, Inabensa and Sener (two offers of EUR456.8 and EUR390 million); Dragados and CAF (three offers of EUR503, EUR519.6 and EUR523 million); Sacyr in JV with GEA-21, Udisa and Pamasa with two offers of EUR398.7 and EUR363.6 million; and Metromar, a consortium including FCC, Comsa, Azvi, Construcciones Sando, Vera and Cajamar, who submitted two offers (EUR403 million and EUR360.7 million).Commissioning dates range from October 2007 for the Dragados-led consortium and February 2009 for the consortium headed by FCC.The two lines span 13 km, whereof 80% will run below ground, and include 22 stops, a joint head station in La Malagueta and end stations in Teatinos for Line 1 and in Jose Maria Martin Carpena Sport Complex on Line 2. 20/04. The design of Line 3 of Malaga's light rail has been awarded by the Andalusian government to a JV of Typsa and Jose Segui for EUR1.6 million and a time frame of 12 months. The line will start at La Malagueta, which is also the start point for Lines 1 and 2, to reach El Palo, running below ground in 5.47 km of tunnel with stations in Sancha, Sorolla, Banos del Carmen, Pedregalejo, Mercado and El Palo. The design study will determine the exact alignment and its technical characteristics as well as the tunnelling method, either cut-and-cover or TBM, and what TBM type will be used if eventually the project is TBM-driven. The study will also specify the connecting areas and analyse the possible interactions of tunnelling on surrounding buildings. The JV will also elaborate a geotechnical study. Visit www.typsa.es 24/04. Andalusia's government has awarded to consortium Metromar formed by FCC, Comsa, Construcciones Sando, Azvi, Construcciones Vera and bank Cajamar have secured the construction and operation for 30 years of Lines 1 and 2 of the Malaga light rail, for EUR403.7 million. The two lines span 13.6 km forming a Y-shaped network, with a joint leg in the city centre totalling 2 km from La Malagueta to Guadalmedina. Twenty-two stations will be built in total, at depths varying from 15.7 m at Carlos Haya and Cruz de Humilladero to at grade. Construction will commence in November 2005 to complete in February 2009. Prior to work start, remaining tasks include project design and review, contract signing, land acquisition and establishment of the operating company. Financing by the government of Andalusia (75%) and the city of Malaga (25%).The 7.2 km Line 1 will run entirely underground from La Malagueta to Manuel Dominguez Avenue, where it exits at grade. There will be underground stations in La Malagueta, Plaza de la Marina, Guadalmedina, Solidaridad, Cruz de Humilladero, Juan XXIII, Carlos Haya, and La Barriguilla. Then, the line serves three surface stations in Ciudad de la Justicia, Universidad and Hospital Clinico before reaching underground the final destination in Teatinos. A 8.8 m-diameter TBM will excavate the leg shared by both lines from La Malagueta to Guadalmedina and the Guadalmedina-La Barriguilla branch.The 6.4 km route followed by Line 2 also travels below ground except between Cadiz Road and the line head in Martin Carpena. Underground stations will be built at Renfe railway station, Heroes de Sostoa, Huelin, Delicias, Guindos, and Puerta Blanca in addition to those shared with Line 1. The Line 2 branch will be built with the cut-and-cover method. Visit www.metrodemalaga.info and www.fcc.es 30/04.Open call for bids, deadline 28th September, 2004 for supervision and work control during construction of Malaga's light rail lines 1 and 2. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=133826-2004, OJ S 154, or contact Ente Publico de Gestion de Ferrocarriles Andaluces, Seville, fax +34 955007573. E-mail maryam.ferreras@ferrocarrilesandaluces.com 36/04.Cemosa secured a EUR420,000 contract for technical assistance during inspection of the buildings near the alignment of Lines 1 and 2 of Malaga's light rail. Visit www.cemosa.es 23/05.



Permalink

Spain, Catalonia - es/57

Highway

Second 5.23 km-long x 95 sq m parallel tube in design for Central Pyrenees N230 highway from Toulouse to Lerida. 13.75 m-wide x 8.2 m-high, for three-lane traffic, with pedestrian connections to existing tunnel every 400 m. Drill/blast in Paleozoic rocks, granite, slate, quartzite and sandstone, with rockbolts, mesh and shotcrete support. Value $130 million. Tenders expected 2001 for completion 2005. Visit www.idom.es 04/01. Open invitation to tender, deadline 14th September, 2001, for construction of 5 km-long road tunnel for Ministerio de Fomento, Madrid. Visit www.boe.es 36/01. Invitations to tender expected for three-year construction of $120 million, 9.5 km-long motorway section including four twin-tube tunnels of lengths 163 m, 394 m, 258 m, and 1.2 km. Visit www.boe.es 38/01. Tenders invited for consulting and assistance for the dualling of the 5.2 km Viella tunnel in Lérida. Value of €4 million. Deadline 1st February, 2002. Visit http://ted.eur-op.eu.int, document S 246-169590. 01/02. Award to a jv of OHL, Comsa, and Copcisa of the dualling of the Vielha tunnel in Lleida for €128 million. Bored length totals 5,059 metres, 106.25 sq m cross section. Also a 165 cut-and-cover portion, 5 m-high x 13.41 m-wide. Drill/blast method. Support with shotcrete, mesh, rockbolts and steel arches. The project also includes 120 m-long cross passages to the existing tube every 400 metres, a service tunnel, refuges, safety niches, restructuring the accesses, installing equipment within the tunnel, ventilation facilities at each portal, as well as a management and operation building at the north portal. Time frame of 39 months with start in September, 2002 and completion in March, 2005. Doubling the tunnel is urgent since safety in the existing tube, also known as Alfonso XIII, scored 'very bad' in a survey published in April, 2000 by the international tourism alliance and the international motoring federation. Visit www.ohl.es 05/02.Sener have been awarded a €3.6 million contract for work supervision of the 5 km Vielha tunnel. Visit www.sener.es. 31/02.Open call for tenders, deadline 14th September, 2007 for draft design for conversion to motorway of the Vielha tunnel-French border section of road N-230 in Aran Valley. The west alternative includes seven tunnels totalling nine kilometres, the longest of which would be five kilometres in length. More details in E-News Weekly 51/2003 & 5/2002. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142852-2007, OJ S 116, or contact Ministry of Development, Madrid, fax +34 915978536 or 915978470. E-mail randujar@fomento.es or cpublic@fomento.es 29/07.Indra pocketed a EUR4.6 million contract to supply and install safety and control systems in the Juan Carlos I tunnel in Viella in Lerida province. The new tunnel, located on the Vilaller-Viella section of trunk road N-230, will be equipped with the most modern safety and control systems, including signage, video monitoring, video detection, telephone and videoconference, IP communication network, fire detection, radio communication, SOS stations and ventilation and lighting control. Indra will also supply the systems for the control centre, both for the new and old tunnels. With three lanes, one of which will be reversible, the new tunnel will solve safety problems in the existing tunnel, which is bidirectional and carries two very narrow lanes. The two parallel tunnels will be cross-connected by 12 escape galleries. Click here and here. Visit www.indra.es 36/07.Open invitation to tender, deadline 03.03.2009, for 16 month contract to equip new 5,230 m-long Vielha Juan Carlos I tunnel on N-230 highway in Lleida province, value EUR16,352,192. Specs and docs from Ministerio de Fomento, Madrid, e-mail cpublic@fomento.es, fax +34 915978470. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=000803-2009. 02/09.



Permalink

Spain, Madrid-Valladolid - es/56

High Speed Railway

  Open invitation to tender, deadline 10th September, 2001, for design of Fuencarral-Canto Blanco section of Madrid-Miraflores route including 1.5 km cut and cover tunnel. First of five similar contracts. Visit www.gif.es 34/01. Open invitation to tender, deadline 12th September, 2001, for geotechnical evaluation of Madrid-Valladolid line tunnels, including one 9 km-long, three totalling 1 km, and a 1.5 km-long cut and cover. Contact www.gif.es 37/01. Open invitation to tender, deadline 24th October, 2001, for consultancy services for Madrid-Avila high speed railway, including tunnels. Contact Ministry of Construction, fax +34 91 5631574 or visit www.gif.es 42/01. Design and work supervision contract of the Fuencarral-Canto Blanco section including a 1.5 km cut-and-cover tunnel to a jv of Paymacotas, Esteyco and Icyf for €2.9 million. Visit www.gif.es 47/01. Consulting and assistance for geotechnical studies on the Colmenar Viejo-Soto del Real section awarded to a jv of Ingeotec and Mayasa for €501,000. Includes the San Pedro tunnel, a 9 km twin tube. Visit www.gif.es 48/01. Open call for bids, deadline 16th January, 2003 for construction of the 7 km Canto Blanco-Tres Cantos section, including 3 cut-and-cover tunnels totalling 1 km. Tender value €45.4 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=190325-2002, OJ S 239, or contact GIF, Madrid, fax +34 913198535. 51/02. Invitation to tender imminent further to government approval of the construction of the Colmenar Viejo-Soto del Real section, north of Madrid. This requires the San Pedro twin tunnel, approximately 9,5 km in length. Tender value: €310.3 million, of which €150.7 million for the east tunnel and €159.6 million for the west tunnel. Time frame for construction: 42 months. 18/03.Open call for bids, deadline 20th June, 2003 for construction of the west tunnel, 9.5 km in length, on section Colmenar Viejo-Soto del Real. The project includes civil works and equipment for the west tunnel and civil works for the south portal common to the two tracks. Tender value: €159.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=077509-2003, OJ S 87, or contact GIF, Madrid, fax +34 913198535. 20/03.Open call for bids, deadline 20th June, 2003 for construction of the east tunnel, 9.5 km in length, on section Colmenar Viejo-Soto del Real. The project includes civil works and equipment for the east tunnel, the connecting galleries to the west tunnel and civil works for the north portal common to the two tracks. Tender value: €150.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=078412-2003, OJ S 88, or contact GIF, Madrid, fax +34 913198535. 20/03.OHL has secured a €137.6 million contract to build the west tube of the San Pedro tunnels between Colmenar Viejo and Soto del Real, north of Madrid. A TBM will be used to drive this 9.5 km 8.75 m-diameter tunnel. The contract also includes tunnel equipment (safety, lighting, communication and control) and building of the south portal. Completion at fall 2006. Visit www.ohl.es 39/03.Construction of the east tube, of the same length, has been commissioned to a JV of midsize contractors including Construcciones Sí¡nchez Domí­nguez, Construcciones Paraí±o SA (Copasa), Aldesa Construcciones and Tableros y Puentes SA (Tapusa) for €130 million. The contract also includes tunnel equipment (safety, lighting, communication and control), building of the cross passages to the west tube and the north portal. 39/03.Open call for bids, deadline 8th January, 2004 for technical and environmental management during construction of several sections of the Madrid-Valladolid high speed line, among which Fuencarral-Canto Blanco, Canto Blanco-Tres Cantos and Colmenar Viejo-Soto del Real. Fuencarral-Canto Blanco includes a 1.5 km cut-and-cover tunnel, Canto Blanco-Tres Cantos requires 1 km of cut-and-cover tunnels and Colmenar Viejo-Soto del Real includes the San Pedro tunnel (2 x 9.5 km). Tender value: €9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=208815-2003, OJ S 234, or contact GIF, Madrid, fax +34 913198535. 50/03.Open call for bids, deadline 12th March, 2004 for design and assistance to work control for the urban integration of the high speed line in Valladolid. The line will run underground, requiring a south-north tunnel starting near a viaduct at Daniel del Olmo Street to link up with the Renedo Road, north of the city, and a new underground station in Campo Grande. Tender budget: EUR2.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024945-2004, OJ S 28, or contact GIF, Madrid, fax +34 913198535. 09/04.Ineco won a EUR5.4 million contract for technical and environmental management during construction of several sections of the Madrid-Valladolid high speed line, among which the Fuencarral-Canto Blanco, Canto Blanco-Tres Cantos and Colmenar Viejo-Soto del Real sections. Fuencarral-Canto Blanco includes a 1.5 km cut-and-cover tunnel, Canto Blanco-Tres Cantos requires 1 km of cut-and-cover tunnels and Colmenar Viejo-Soto del Real includes the 2 x 9.5 km San Pedro tunnel. Visit www.ineco.es 10/04.Ineco has secured a EUR1.6 million contract for the design and assistance to work control for the urban integration of the high speed line in Valladolid. The line will run underground, requiring a south-north tunnel starting near a viaduct at Daniel del Olmo Street to link up with the Renedo Road, north of the city, and a new underground station in Campo Grande. Visit www.ineco.es 31-32/04.Open call for tenders, deadline 28th August, 2007 for work to equip the 9.4 km-long Colmejar Viejo-Soto del Real section, including all outfit (ventilation, fire extinguishing, civil protection and safety, and electrical equipment) in the 2 x 8,759 m-long San Pedro tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=161959-2007, OJ S 132, or contact ADIF, Madrid, fax +34 917005751. 29/07.Open call for tenders, deadline 3rd September, 2007 for construction of the 5.44 km section Duero River-Pinar de Antequera tunnel, including a 2 x 1,057 m-long cut-and-cover tunnel, one for IUC gauge trains and one for Spanish gauge trains. Read E-News Weekly 12/2007, 16/2006 & 5/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=182519-2007, OJ S 147, or contact ADIF, Madrid, fax +34 917005751. 32/07.Open call for tenders, deadline 25th October, 2007 for construction of the east bypass railway for freight trains in Valladolid on the Madrid-Valladolid high speed line. This is a 17.5 km Spanish gauge line, starting at chainage 242.9 on the Madrid-Hendaya line and finishing at chainage 258.4 on the same line. It is mainly a surface line, except two kilometres between chainages 3.9 and 5.9 in Pinar del Jalí³n, San Cristí³bal industrial park and Cerro de San Cristí³bal. The cut-and-cover method will be used. Read E-News Weekly 5/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=221177-2007, OJ S 181, or contact Ministry of Development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 40/07.Open call for tenders, deadline 5th November, 2007 for site supervision and work inspection during construction of the east bypass railway for freight trains in Valladolid on the Madrid-Valladolid high speed line. The 17.5 km line includes a 2 km cut-and-cover tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=228141-2007, OJ S 187, or contact Ministry of Development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 41/07.ADIF awarded the construction and equipment of the 5.44 km section between the Duero River and the Pinar de Antequera tunnel, including a 2 x 1,057 m-long cut-and-cover tunnel, one for IUC gauge trains and one for Spanish gauge trains, to Corsí¡n-Corviam, Begar and Zarzuela. The contract is worth EUR76.2 million. Visit www.corsan-corviam.es, www.begar.es and www.zarzuelasa.com 41/07.OHL (50%), Aldesa Construcciones (14%), Construcciones Sando (14%), Copasa (14%) and Tapusa (8%) landed a EUR60 million contract to equip the 9.4 km-long Colmejar Viejo-Soto del Real section, including all outfit (ventilation, fire extinguishing, civil protection and safety, and electrical equipment) in the 2 x 8,759 m-long San Pedro tunnels. Visit www.ohl.es, www.aldesaconstrucciones.es, www.sando.net, www.copasa.es and www.tapusa.es 45/07.Idom Internacional bagged a EUR2.4 million contract for site supervision and work inspection during construction of the east bypass railway for freight trains in Valladolid on the Madrid-Valladolid high speed line. The 17.5 km line includes a 2 km cut-and-cover tunnel. Visit www.idom.es 52/07-01/08.The Ministry of development has awarded the construction of the east bypass railway for freight trains in Valladolid to FCC and its affiliate Convensa. The contract is worth EUR108.2 million. The project forms part of the Madrid-Segovia-Valladolid high speed line, which opened on 22nd December, 2007. Construction will take 27 months until early 2011. Basically, the bypass is 17.5 km long and its path runs in majority parallel to Valladolid's outer ring road. It travels at grade for most of the length, except two kilometres in Pinar del Jalon, San Cristobal industrial park and Cerro de San Cristobal, running mainly in a cut-and-cover tunnel. Visit www.fcc.es 03/08.Open call for tenders, deadline 23rd April, 2008 for design of the 4,680 m cross city high speed tunnel and the new Campo Grande underground station in Valladolid. The Madrid-Valladolid high speed line entered in service in December 2007 but the bullet trains enter Valladolid at grade using the conventional tracks. Click here. Read E-News Weekly 5/2006, 49/2005, 38/2003 & 49/2002. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=79012-2008, OJ S 58, or contact ADIF, Madrid, fax +34 917005751. 14/08.Intecsa-Inarsa scooped a EUR4.2 million contract to design the 4,680 m cross-city high speed tunnel and the new Campo Grande underground station in Valladolid. Visit www.intecsa-inarsa.es 24/08.Intecsa-Inarsa has been awarded a EUR4.2 million design contract for the 4,680 m cross city high speed tunnel and the new Campo Grande underground station in Valladolid. The Madrid-Valladolid high speed line entered in service in December 2007 but trains still use the conventional surface tracks within the city. Visit www.intecsa-inarsa.es 27/08.



Permalink

Open invitation to tender, deadline 25.04.2012, for the maintenance and repair of the civil protection and safety equipment in tunnels of the Madrid-Valladolid high-speed line.

Time limit for accessing documents 24.04.2012. Contract value EUR3,214,992 excluding VAT, duration one year. Contact Luis Mariano Ortiz at Adif in Madrid, tel +34 913007487, fax +34 913006104, e-mail lmortiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=079331-2012. 15/12.



Permalink

The JV Indra-Alstom of Alcobendas secured the EUR3,785,882 contract, excluding VAT, for the maintenance and repair of the civil protection and safety equipment in tunnels of the Madrid-Valladolid high-speed line. Contact Mercedes Lopez de la Fuente at Adif in Madrid, tel +34 913007260, fax +34 913006623, e-mail mlfuente@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=378316-2013. 46/13.



Permalink


The JV Tuneles Guadarrama from Alcobendas (Madrid) secured the EUR 4.23 million contract, excluding VAT, for the maintenance and repair of the civil protection and safety equipment in tunnels of  the Madrid-Valladolid-Venta de Banos-Burgos-Leon High Speed Railway. For further information contact Mercedes Lopez de la Fuente at Adif in Madrid, tel +34 913007260, fax +34 913006623, e-mail mlfuente@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=396732-20135. Ref.n. 4.15/20506.0022. 47/15.




Permalink

Open invitation to tender, deadline 01.03.2019, for the maintenance and repair of the civil protection and safety equipment in tunnels of the Madrid-Valladolid-Leon and Venta de Banos-Burgos high-speed line. Contract value EUR12.3 million, excluding VAT, duration 48 months from award.

Contact Angel Una Ruciero at Adif in Madrid, tel +34 913007588, fax +34 913006623, email AURUCIERO@ADIF.ES. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=034001-2019.

Ref.n. 4.18/21506.0032. 04/19.




Permalink


Asociacion de Accion Ferroviaria (Cetren) from Madrid have secured the contracts for 9 lots for CE validation  of interoperability of the infrastructure and/or energy subsystems on the new high speed railway sections: 

  • Lot1: Olmedo-Zamora-Pedralba, value of the contract EUR355,000, excluding VAT; 
  • Lot 2: Valladolid-Leon/Venta de Banos-Burgos, value of the contract EUR495,000, excluding VAT; 
  • Lot 3: Antequera-Granada, value of the contract EUR188,000, excluding VAT; 
  • Lot 4: La Robla-Pola de Lena, value of the contract EUR249,000, excluding VAT;
  • Lot 5: Castellbisbal-Tarragona (Vilaseca)-Vandellos-Castellon-Valencia, value of the contract EUR664,000, excluding VAT;
  • Lot 6: Monforte del Cid-Murcia-Alicante (Cambiador Encina)-Jativa-Valencia, value of the contract EUR305,000, excluding VAT;
  • Lot 7: Plasencia-Badajoz, , value of the contract EUR170,000, excluding VAT; 
  • Lot 8: Vigo-Santiago-la Coruna-Orense-Santiago, value of the contract EUR567, 000, excluding VAT; 
  • Lot 9: Tunnel AV Atocha-Chamartin, , value of the contract EUR43,459, excluding VAT. 

Contact  Adif Alta Velocidad, attn Francisco Macias Bonilla, Madrid, tel +34 661347788,  email fmacias@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120827-2022. Ref.n. 3600000039. 11/22.




Permalink

Spain, Asturias-Castilla & Léon - es/55

High Speed Railway

  Open invitation to tender, deadline 3rd August, 2001, for engineering design of railway line including tunnels for Asturias Government, Ministry of Infrastructure, fax +34 985 105884. Visit www.boe.es 29/01. Open tendering, deadline 16th January, 2002, for consultancy and design of the Variante de Pajares option between La Robla and Pola de Lena on the Valladolid-Gijí³n rail link. Budget of €6.1 million. A 980 m-deep core drill was due to be completed in December, 2001 by a jv of Geoconsult and Compaí±i­a General de Sondeos under Mounts Valgrande and El Huerna for a long twin tunnel, possibly up to 2 x 25 km, required to cross the Cantabrian mountain chain. Visit http://ted.eur-op.eu.int, documents S 230-158539 or fax +34 917004755, Madrid, Gestor de Infraestructuras Ferroviarias. Also visit www.gif.es 02/02. Award to a jv of Ineco and Geoconsult of the design of the Variante de Pajares with a possible 25 km twin tunnel. Contract value of €5.2 million. Visit www.gif.es 13/02. Call for tenders imminent in OJEC for project and construction of the Pajares tunnels for €1.08 billion with time frame of five years. The Spanish OJ has already invited tenders twelve days only after approval by the government. The Pajares bypass consists of two twin tunnels of 24.6 km each to connect Asturias with the centre of Spain through Leí³n. Construction of the tunnel will be divided into four contracts. Number one from Pola de Gordí³n to Folledo will cost €403 million; number 2 (Folledo-Viadangos) will cost €306 million; number 3 (Viadangos-Telledo-Tunnel east) €192.5 million and number 4 (Viadangos-Telledo-Tunnel west) €183.5 million. Visit www.boe.es and www.gif.es/lineav1.html 11/03. Open call for bids, deadline 30th April, 2003 for the design, construction and execution of requirements for the Pajares twin tunnels (2 x 24.6 km) on the high speed link between Léon and Asturias. Maximum budget for design: €500,000. Reference budget for construction: €1,085 million. Lot 1 is section Pola de Gordí³n-Folledo consisting of an access tunnel, joint cavern, two single-track tunnels, cross connections between both tubes and associated installations. This section is 11 km-long. Maximum budget for design: €110,000. Reference budget for construction: €403 million. Lot 2 is section Folledo-Viadangos, which includes two twin tunnels excavated by conventional means, start shafts, a joint cavern, cross connections between both tunnels and associated installations. The length is approximately 4 km. Maximum budget for design: €140,000. Reference budget for construction: €306 million. Lot 3 has an approximate length of 10 km and encompasses the tunnel on section Viadangos-Telledo, east tube and its associated installations. Maximum budget for design: €140,000. Reference budget for construction: €192.5 million. Lot 4 is the west tube parallel to the previous one and the cross connections between both. Maximum budget for design: €110,000. Reference budget for construction: €183.5 million. Time frame of 4 months for design, 5 years for construction and 18 months for the assembly of TBMs as of the contract awarding date. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=042344-2003, OJ S 49, or contact GIF, Madrid, fax +34 913198535. Visit www.gif.es/lineav1.html 12/03. The Ministry of development has approved the project for the Léon Asturias high speed line, section La Robla-south portal of the Pajares tunnels near Pola de Gordí³n. This 9.44 km section includes six tunnels totalling 4,089 m and three viaducts. Construction budget: €118.6 million. It has been proposed to divide the section into three subsections with an aproximate time frame for completion of two years. Design studies by Ineco and Geoconsult. Visit www.gif.es, www.geoconsult.es and www.ineco.es 18/03. Seven candidates have bidded for Lot 1 of the Pajares tunnels, section Pola de Gordí³n-Folledo. Lot 1 is for the construction of two single-track tunnels of 10.5 km each and associated underground structures, with an estimated cost of €403 million. The bidders are OHL and, in JV, Corsí¡n-Corviam, Coprosa and Comsa; Ploder and Vinci; Dragados, ACS and Obras Subterrí¡neas; Aldesa, Tableros y Puentes, Construcciones Paraí±o and Construcciones Sando; FCC and Necso; and Ferrovial with Sacyr. Tenders lapsed on 30th April, 2003 and it is planned to open the financial bids on 16th May. Tenders lapsed on 7th May, 2003 for the submission of bids for Lot 2, section Folledo-Viadangos (4 km). This section is valued at €306 million and includes two twin tunnels and other underground works. The bidders are the same as for Lot 1.Bids for the two remaining contracts are due in May 2003. Bids for Lot 3, section Viadangos-Telledo, east tunnel, are due 14th May while for Lot 4, section Viadangos-Telledo, west tunnel, they must be submitted 21st May. Visit www.gif.es 20/03. Contract 1 of the Pajares tunnels, section Pola de Gordí³n-Folledo, has been awarded to a JV of FCC and Necso for €531.7 million. Contract 1 includes the construction of two 10.5 km tunnels. The JV will build the Folledo access adit (1,950 m), to be mined by conventional means and a 60 m cut-and-cover tunnel at the portal, both to be completed during the first 14 months of the project, concurrently with a 230 m open cut to access to the portals on the Leí³n side. Once this is completed, four months will be needed to mine the Folledo cavern using conventional means. This cavern is necessary for geological reasons at the junction between the access adit and the future tunnels. The TBMs will be assembled in the cavern to drive 8 km of tunnels uphill until the portals located on the Leí³n side. Time frame: 32 months. At the same time, from the cavern, 2 x 2.5 km of tunnel will be excavated by conventional means heading downhill. Finally, 40 m-long cut-and-cover tunnels will be built at the Leí³n portals. The project also encompasses the building of the cross passages between the twin tunnels. Contract 1 also has a 18-month time frame for the assembly of the TBMs. Visit www.fcc.es and www.necso.es 22/03.Contract 2, section Folledo-Viadangos, has been awarded to a JV of Dragados, ACS and Obras Subterrí¡neas for €417.8 million. The JV will build the inmediate access to the Viadangos shafts and the cavern necessary for the junction with the tunnels, using conventional means. This will take the first two years of the project. Afterwards, 4 km of the Pajares tunnels will be bored using conventional means (San Emiliano geological formation), some 1,600 m downwhill and 2,400 m uphill. The cross passages between the two bores are also included. Time frame: 5 years. Visit www.dragados.es, www.grupoacs.com and www.obrassubterraneas.es 22/03.Both for contracts 1 and 2, the time frame for design is 4 months and 60 months for construction. 22/03.For contract 3, section Viadangos-Telledo (tunnel east), the eight bidders are Aldesa Construcciones / Tableros y Puentes / Construcciones Paraí±o / Construcciones Sí¡nchez Domí­­nguez Sando; Corsí¡n-Corviam / Coprosa / Comsa; FCC / Necso; Copcisa / Ferní¡ndez Constructor / Azvi / Constructora Hispí¡nica; OHL; Ploder / Vinci; Ferrovial-Agromí¡n / Sacyr / Cavosa; and Dragados / ACS / Obras Subterrí¡neas. 22/03.The seven candidates who have bidded for contract 4, section Viadangos-Telledo (tunnel west) are: Aldesa Construcciones / Tableros y Puentes / Construcciones Paraí±o / Construcciones Sí¡nchez Domí­­nguez Sando; Corsí¡n-Corviam / Coprosa / Comsa; FCC / Necso; Copcisa / Ferní¡ndez Constructor / Azvi / Constructora Hispí¡nica; OHL; Ferrovial-Agromí¡n / Sacyr / Cavosa; and Dragados / ACS / Obras Subterraneas. 22/03.Contract 3 for the design and construction of the Pajares tunnels has been awarded to a JV of Ferrovial-Agromí¡n, Sacyr and Cavosa for €239.19 million. Time frames are four months for design, 18 months for assembly of the TBM and 60 months for construction. Contract 3 runs from Viadangos to Telledo and includes the east tunnel and its equipment. The section starts and most of its alignment runs in Leí³n province to end in Asturias. The first stretch of this tunnel will be driven by conventional means and then with the TBM driving upwards to connect with Contract 2.Contract 4 has been commissioned to Copcisa, Ferní¡ndez Constructor, AZVI and Constructora Hispí¡nica for €220.42 million. Times frames are four months for design, 18 months for assembly of the TBM and 58 months for construction. Contract 4 also starts in Viadangos and ends in Telledo. It comprises of the west tunnel starting on the Asturian side. It also includes the construction of cross galleries between the two bores.The two single-track Pajares tunnels, 25 km in length, will feature a minimum cross section of 52 square metres. Cross passages will be drilled every 400 metres and a place for connection between the two main tunnels, located about half-way, will be excavated to allow trains to swap tracks if needed and for maintenance and emergency.According to planning, work will be completed in 2009. Then, track laying, electrification, signalling, safety and communication equipment work will commence. This will take one year to complete so that the tunnels will be commissioned in 2010. Visit www.gif.es 26/03.Open call for bids, deadline 4th February, 2004 for work supervision during construction of the Pajares tunnels. Tender budget: 7.1 million euros. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=004362-2004, OJ S 5, or contact GIF, Madrid, fax +34 913198535. 03/04.Invitation to tender to be published imminently, further to government approval, for the remaining sections of the Pajares bypass on the Leon-Asturias high speed line. Budget: EUR478.7 million. They are sections La Robla-Pajares tunnels, in Leon province, and Pajares tunnels-Pola de Lena, in Asturias. The latter has been divided in two subsections, Pajares tunnels-Sotiello and Sotiello-Pola de Lena. The total length is 24.7 km.Section La Robla-Pajares tunnels, 9.4 km in length, runs through the municipalities of Cuadros, La Robla and Pola de Gordon, all situated in Leon province. Budget for construction estimated at EUR118.7 million, time frame of 24 months. Budget for design: EUR750,000 with time frame of six months from award date. Includes six tunnels totalling 4,089 m.Subsection Pajares tunnels-Sotiello, 6 km in length, runs through the municipality of Lena in Asturias. Budget for construction estimated at EUR174 million, time frame of 32 months. Budget for design: EUR450,000 with time frame of six months from award date. Includes two double single-track tunnels, lengths 3,825 m approximately and 2,100 m.Subsection Sotiello-Pola de Lena, length 9.3 km, runs also in the municipaly of Lena. Budget for construction: EUR186 million, time frame of 36 months. Budget for design: EUR750,000 with time frame of six months from award date. Includes one double single-track tunnel, length 3,500 m, and two dual-track tunnels, lengths 2,418 m and 1,674 m respectively. 08/04.Open call for bids, deadline 12th April, 2004 for design and construction of the 6 km subsection running from the Pajares tunnels to Sotiello. Budget for design: EUR450,000. Time frame: six months. Budget for construction: EUR174 million. Time frame: 32 months. Includes two double single-track tunnels, lengths 3,825 m approximately and 2,100 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=034011-2004, OJ S 39, or contact GIF, Madrid, fax +34 913198535. 10/04.Open call for bids, deadline 12th April, 2004 for design and construction of the 9.3 km subsection running from Sotiello to Pola de Lena. Budget for design: EUR750,000. Time frame: six months. Budget for construction: EUR186 million. Time frame: 36 months. Includes one double single-track tunnel, length 3,500 m, and two dual-track tunnels, lengths 2,418 m and 1,674 m respectively. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=034070-2004, OJ S 39, or contact GIF, Madrid, fax +34 913198535. 10/04.Open call for bids, deadline 12th April, 2004 for design and construction of the 9.4 km subsection running from La Robla to the Pajares tunnels. Budget for design: EUR750,000. Time frame: six months. Budget for construction: EUR118.7 million. Time frame: 24 months. Includes six tunnels totalling 4,089 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=034079-2004, OJ S 39, or contact GIF, Madrid, fax +34 913198535. 10/04.Open call for bids, deadline 26th March, 2004 for project construction management and work control of subsection La Robla-Pajares tunnels. Tender budget: EUR3.7 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=034342-2004, OJ S 39, or contact GIF, Madrid, fax +34 913198535. 10/04.Open call for bids, deadline 26th March, 2004 for project construction management and work control of section Pajares tunnels-Pola de Lena. Subsection Pajares tunnels-Sotiello includes two double single-track tunnels, lengths 3,825 m and 2,100 m. Subsection Sotiello-Pola de Lena includes one double single-track tunnel, length 3,500 m, and two dual-track tunnels, lengths 2,418 m and 1,674 m respectively. Tender budget: EUR8.1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=034344-2004, OJ S 39, or contact GIF, Madrid, fax +34 913198535. 11/04.Ineco and Geoconsult secured a EUR4.5 million contract for construction management and work conrol of the Pajares tunnels. Visit www.ineco.es and www.geoconsult.es 15/04.Open call for bids, deadline 19th August, 2004 for design of two subsections, 4.32 km and 4.85 km, running from Sotiello to Campomanes and from Campomanes to Pola de Lena. Budgets: EUR980,000 and EUR850,000. Time frames: ten months and nine months respectively. The Sotiello-Pola de Lena section includes one double single-track tunnel, length 3,500 m, and two dual-track tunnels, lengths 2,418 m and 1,674 m respectively. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107736-2004 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107737-2004, OJ S 127, or contact GIF, Madrid, fax +34 913198535. This is a rebid further to the decision of the Ministry of public works to cancel a previous design and build tender and to invite tenders separately for design and construction. 29/04.Open call for bids, deadline 18th August, 2004 for construction management and work control of sections La Robla-Pajares tunnels and Pajares tunnels-Pola de Lena. Tender budget: EUR600,000 and time frame: 12 months. Subsection Pajares tunnels-Sotiello includes two double single-track tunnels, lengths 3,825 m and 2,100 m. Subsection Sotiello-Pola de Lena includes one double single-track tunnel, length 3,500 m, and two dual-track tunnels, lengths 2,418 m and 1,674 m respectively. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107752-2004, OJ S 127, or contact GIF, Madrid, fax +34 913198535. This is a rebid. 29/04.Open call for bids, deadline 19th August, 2004 for design of the subsection running from La Robla to the Pajares tunnels. Budget: EUR1.25 million and time frame: nine months. This section includes six tunnels totalling 4,089 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107730-2004, OJ S 127, or contact GIF, Madrid, fax +34 913198535. This is a rebid further to the decision of the Ministry of public works to cancel a previous design and build tender and to invite tenders separately for design and construction. 29/04.Open call for bids, deadline 19th August, 2004 for design of the 6.1 km Pajares tunnels-Sotiello section. Tender budget: EUR950,000 and time frame: nine months. Section Pajares tunnels-Sotiello includes two double single-track tunnels, lengths 3,825 m and 2,100 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107731-2004, OJ S 127, or contact GIF, Madrid, fax +34 913198535. This is a rebid further to the decision of the Ministry of public works to cancel a previous design and build tender and to invite tenders separately for design and construction. 29/04.The design of section La Robla-south portals of the Pajares tunnels, 9.4 km in length, has been awarded to Geoconsult Espaí±a and Idom for EUR900,000. This section includes six tunnels for a total length of 4,089 m. Visit www.geoconsult.es and www.idom.es 45/04.Ayesa will design for EUR684,000 the section from the north portals of the Pajares tunnels to Sotiello (6.1 km), which includes two tunnels (3,825 and 2,094 m). Visit www.ayesa.es 45/04.Getinsa and Geocontrol will design the Sotiello-Campomanes section (4.3 km), which includes two tunnels (1,004 and 753 m), for EUR715,700. Visit www.getinsa.es and www.geocontrol.es 45/04.TRN Ingenierí­­a y Planificacií³n de Infraestructuras and GTT Ingenierí­­a y Tratamientos del Agua secured a EUR603,500 contract to design the Campomanes-Pola de Lena section (4.9 km), which includes two tunnels (2,418 and 1,674 m). 45/04.Ineco secured a EUR380,200 contract for the construction management and work control of sections La Robla-Pajares tunnels and Pajares tunnels-Pola de Lena. Section from La Robla to the south portals includes six tunnels for a total length of 4,089 m. Section from the north portals to Pola de Lena includes six tunnels (3,825 m / 2,094 m / 1,004 m / 753 m / 2,418 m and 1,674 m). Visit www.ineco.es 48/04.Open call for tenders, deadline 14th February, 2006 for construction of section La Robla-Pajares tunnel (9.4 km), in Leon province, on the Leon-Asturias high speed link. The EUR120.6 million scheme includes six twin-track 85-90 sq m tunnels: Castro (493 m), Alba (1,132 m), Peredilla (711 m), Buen Suceso I (736 m), Buen Suceso II (251 m) and Nocedo de Gordon (701 m), to be built by conventional methods. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=03564-2006, OJ S 3, or contact ADIF, Madrid, fax +34 917005771. 03/06.Open call for tenders, deadline 17th March, 2006 for work supervision of section La Robla-Pajares tunnel in Leon province. The 9,440 m section includes six tunnels (4,024 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=033396-2006, OJ S 30, or contact ADIF, Madrid, fax +34 917005771. 08/06.ADIF, the authority responsible for managing the construction of high speed lines, has awarded to a JV between OHL and Obras Subterraneas a EUR89.5 million 24-month contract. This 9.4 km-long section has been designed for double tracks. Along its route, the following 85-90 sq m twin-track tunnels will be built using conventional methods: Castro (493 m), Alba (1,132 m), Peredilla (711 m), Buen Suceso I (736 m), Buen Suceso II (251 m) and Nocedo de Gordon (701 m). Read E-News Weekly 5/2006. Visit www.adif.es, www.ohl.es and www.obrassubterraneas.es 15/06.Open call for bids, deadline 17th May, 2006 for construction of section Sotiello-Campomanes (4.3 km) on the Pajares railway bypass, including the Sotiello and Teso twin-tube tunnels. Their length is 2 x 990 m and 2 x 786 m for a cross section of 62 sq m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079306-2006, OJ S 75, or contact ADIF, Madrid, fax +34 917005751. 19/06.Open call for bids, deadline 26th June, 2006 for construction of section Pajares tunnels-Sotiello in Asturias. It is a 6.1 km-long dual-track section starting from the north entrance of the Pajares tunnels. The section includes the Los Pontones and Jomezana tunnels, of 3,780 m and 2,050 m respectively. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=099907-2006, OJ S 93, or contact ADIF, Madrid, fax +33 917005751. 21/06.Open call for tenders, deadline 26th June, 2006 for construction of section Campomanes-Pola de Lena on the Pajares railway bypass. This 4.9 km dual-track section includes two tunnels: Vega de Ciego (2,465 m) and Pico de Siero (1,646 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=099910-2005, OJ S 93, or contact ADIF, Madrid, fax +34 917005751. 22/06.Prointec secured a EUR2.4 million contract to supervise the construction of section La Robla-Pajares tunnel in Leon province. The 9,440 m section includes six tunnels, totalling 4,024 metres. Click es/55. Visit www.prointec.es 24/06.ADIF, the high speed rail administration, has awarded to Acciona Infraestructuras the construction contract for section Sotiello-Campomanes (4.32 km) on the Pajares railway bypass, which is part of the high speed link from Leon to Asturias. The contract, worth EUR79.8 million with a time frame of 28 months, has been designed for UIC gauge for a twin-track high speed line. The first 2.6 kilometres run along two single tracks while the remaining 1.72 kilometres travel on a double track. Noticeable structures include the Sotiello and Teso twin-tube tunnels, respectively 2 x 990 m and 2 x 786 m in length for a cross section of 62 sq m, to be bored using conventional methods. Visit www.acciona-infraestructuras.es 27/06.A JV of Acciona Infraestructuras (50%) and FCC (50%) will construct section Pajares tunnels-Sotiello in Asturias. This 6.1 km dual-track section starts from the north entrance of the Pajares tunnels and includes the Los Pontones and Jomezana tunnels, of 3,780 m and 2,050 m respectively. The contract is worth EUR160.3 million. Visit www.acciona.es and www.fcc.es 36/06.A JV of Comsa (50%) and Corsan-Corviam (50%) has been awarded a EUR70.8 million contract to build the twin-track section Campomanes-Pola de Lena (4.9 km) on the Pajares railway bypass, which includes two tunnels: Vega de Ciego (2,465 m) and Pico de Siero (1,646 m). Visit www.comsa.com and www.isoluxcorsan.com 36/06.Open call for tenders, deadline 13th November, 2006 for construction supervision for the Sotiello-Campomanes and Campomanes-Pola de Lena sections, 4.3 km and 4.9 km respectively, on the Pajares railway bypass. The first section includes the Sotiello and Teso twin-tube tunnels, 2 x 990 m and 2 x 786 m respectively. The second section includes the Vega de Ciego and Pico de Siero tunnels, 2,465 m and 1,646 m long respectively. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=199100-2006, OJ S 187, or contact ADIF, Madrid, fax +34 917005751. 41/06.Open cal lfor tenders, deadline 24th November, 2006 for work supervision of section Pajares tunnels-Sotiello on the new Leon-Asturias high speed line. This 6.1 km dual-track section starts from the north entrance of the Pajares tunnels and includes the Los Pontones and Jomezana tunnels, of 3,780 m and 2,050 m respectively. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=209608-2006, OJ S 197, or contact ADIF, Madrid, fax +34 917005751. 43/06.SGS Tecnos and Inocsa secured a EUR2.8 million contract for work supervision of section Pajares tunnels-Sotiello on the new Leon-Asturias high speed line. This 6.1 km dual-track section starts from the north entrance of the Pajares tunnels and includes the Los Pontones and Jomezana tunnels, of 3,780 m and 2,050 m respectively. Visit www.es.sgs.com and www.inocsa.esPayma Cotas and Apia XXI bagged a EUR4 million contract for site supervision for the Sotiello-Campomanes and Campomanes-Pola de Lena sections, 4.3 km and 4.9 km respectively, on the Pajares railway bypass. The first section includes the Sotiello and Teso twin-tube tunnels, 2 x 990 m and 2 x 786 m respectively. The second section includes the Vega de Ciego and Pico de Siero tunnels, 2,465 m and 1,646 m long respectively. Visit www.paymatocas.com and www.apiaxxi.es 07/07.Periodic notice, deadline unspecified, being a call for bids aiming at reducing time limits for the receipt of tenders, for design of the overhead installations (switches, tunnel lighting, energy supply) for the Pajares railway bypass between La Robla and Pola de Lena. This includes the 2 x 24.6 Pajares tunnel and 12 tunnels on the north and south accesses to this base tunnel. Read E-News Weekly 10/2007 & 5/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=30386-2008, OJ S 23, or contact ADIF, Madrid, tel. +34 915067281. E-mail gvillegas@adif.es 07/08.Open invitation to tender, deadline 18th November, 2008 for designs of the necessary civil works in addition to those already built at the Pajares railway bypass: ultimate waterproofing of the Pajares tunnels, complementary civil works in the Pajares twin-tube tunnel (platforms, ducting, hazardous liquid drainage system, water inflow drainage system, fit-out of cross-passages, safe areas and emergency exits), outside works (water treatment system for the drainage waters from the tunnel, technical and management facilities and all civil works needed to complement the final equipment of the tunnel). The contract also includes a safety study of the tunnels to analyse the works already completed and propose measures to be adopted in these complementary civil works. Click here, here, here and here. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=259042-2008, OJ S 195, or contact ADIF, Madrid, fax +34 917005751. 42/08.



Permalink

JV Obrascon Huarte Lain SA and Obras Subterraneas SA secured the EUR6.82 million contract for complementary works on La Robla-Pola de Lena (Pajares bypass) section La Robla-Pajares tunnels, lot 2 on the new Leon-Asturias high speed line. Contact Adif, c/Titan, Madrid, tel +34 917744837, fax +34 917745814, e-mail irodriguezdepablos@adif.es, pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056455-2010. 11/10.



Permalink

JV Pajares 3, composed by Ferrovial Agroman SA (50%), Sacyr, S.A.U. (35%) and Cavosa obras y proyectos SA (15%), secured the EUR34.99 million contract for complementary works at Lot 3 Pajares tunnels on the new Leon-Asturias high speed line. Contact Adif, c/ Tití¡n, Madrid, tel +34 917744837, fax +34 917745814, e-mail irpablos@adif.es, pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=064223-2010. 12/10.JV Tunel Pajares IV (Constructora Hispanica SA (25%), Copcisa SA (25%), Azvi SA (25%) and Fernandez Constructor SA (25%)) secured the EUR33.6 million contract for complementary works at Lot 4 Pajares tunnels on the new Leon-Asturias high speed line. Contact Adif, c/ Tití¡n, Madrid, tel +34 917744837, fax +34 917745814, e-mail irpablos@adif.es, pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=067269-2010. 12/10.



Permalink

Open invitation to tender, deadline 25.11.2010, for additional internal civil construction in Pajares tunnels Lot South, Madrid-Asturias La Robla-Pola de Lena (Pajares variant). Contract value EUR78,412,822 excluding VAT, duration 14 months. Time limit for accessing documents 18.11.2010. More information from ADIF in Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es or pmardaiz@adif.es to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303532-2010. 41/10.



Permalink

Open invitation to tender, deadline 25.11.2010, for additional internal civil construction in Pajares tunnels Lot North, Madrid-Asturias La Robla-Pola de Lena (Pajares variant). Contract value EUR140,145,741 excluding VAT, duration 15 months. Time limit for accessing documents 18.11.2010. More information from ADIF in Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es or pmardaiz@adif.es to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303533-2010. 41/10.



Permalink

Contract for additional internal civil construction in Pajares tunnels Lot South, Madrid-Asturias La Robla-Pola de Lena (Pajares variant), value EUR70,759,730 excluding VAT, awarded to UTE Constructora San Jose (60 percent) and Peninsular de Contratas (40 percent). Contract duration 14 months. More information from ADIF in Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=082794-2011. 11/11.



Permalink

Contract for additional internal civil construction in Pajares tunnels Lot North, Madrid-Asturias La Robla-Pola de Lena (Pajares variant), value EUR126,131,167 excluding VAT, awarded to UTE FCC Construccion SA (50 percent) and Acciona Infraestructuras (50 percent). Contract duration 14 months. More information from ADIF in Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=122242-2011. 16/11.



Permalink

JV Pajares 3 comprising Ferrovial Agroman SA, Sacyr, S.A.U. and Cavosa obras y proyectos SA, secured the EUR9.17 million contract, VAT not included, for complementary works n.2 and construction of the platform at Lot 3 Pajares tunnels on the new Leon-Asturias high speed line. Contact Adif, c/ Titan, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=171223-2011. 23/11.



Permalink

Open invitation to tender, deadline 17.02.2014, for track construction works on the section Tuneles de Pajares-Pola de Lena (Pajares bypass), new Madrid-Asturias high speed line. Duration of contract 15 months from award, value EUR28,266,207, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 10.02.2014. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=80-2014. Ref.n. 3.13/20505.0031 (ON 013/13). 02/14.



Permalink

Open invitation to tender, deadline 17.02.2014, for track construction works on the section La Robla- Tuneles de Pajares (Pajares bypass), new Madrid-Asturias high-speed line. Duration of contract 12 months from award, value EUR27,157,771, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 10.02.2014. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=81-2014. Ref.n. 3.13/20505.0029 (ON 012/13). 02/14.



Permalink

Open invitation to tender, deadline 03.02.2014, for lining of Folledo tunnel (Pajares tunnels) on the new Madrid-Asturias high-speed line, section La Robla-Pola de Lena. Duration of contract nine months from award, value EUR9,736,307, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 27.01.2014. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=418437-2013. Ref.n. 3.13/06402.0091 (ON 009/13). 02/14.



Permalink

The JV Electrificacion Pajares (Astom Transporte, SA and Isolux Ingenieria, SA) at Madrid secured the EUR10,496,595 contract, excluding VAT, for the catenary construction and maintenance works.of the section La Robla-Pola de Lena (Pajares bypass) on the new Madrid-Asturias high speed line. Contact Mrs Rosa Samper Membrillo, Adif, Madrid, tel +34 913007589, fax +34 913006623, e-mail rsamper@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=439492-2013. Ref.n. 4.13/20505.0030. 02/14.



Permalink

Open invitation to tender, deadline 30.06.2014, for construction and maintenance of civil protection and safety equipment of the tunnels on the section La Robla -Pola de Lena (Pajares bypass), new Madrid-Asturias high-speed line.  Duration of contract 38 months from award, value EUR83,396,252.92, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 23.06.2014. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-mail pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165617-2014. Ref.n. 4.14/06800.0123 (OM 002/14). 21/14.



Permalink

Dragados SA secured the EUR7.67 million contract, excluding VAT, for track construction works on the section Tuneles de Pajares-Pola de Lena (Pajares bypass), new Madrid-Asturias high-speed line. Contact Adif, Madrid, tel +34 917744804, fax +34 917745814, e-mail pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=318518-2014. Ref.n. 3.13/20505.0031. 39/14.



Permalink

The JV FCC Construccion (50 percent)/Acciona Infraestructuras (50 percent) secured the EUR7.81 million contract, excluding VAT, for track construction works on the section La Robla-Tuneles de Pajares (Pajares bypass), new Madrid-Asturias high-speed line. Contact Adif, Madrid, tel +34 917744804, fax +34 917745814, e-mail pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=289834-2014. Ref.n. 3.13/20505.0029. 39/14.



Permalink

The JV Alstom Transporte (42.75 percent)/Instalaciones Carlos Busto (5 percent)/Indra Sistemas (35.15 percent)/Indra Sistemas de Seguridad (17.10 percent) secured the EUR29.8 million contract, excluding VAT, for construction and maintenance of civil protection and safety equipment of the tunnels on the section La Robla-Pola de Lena (Pajares bypass), new Madrid-Asturias high-speed line. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-mail pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=396652-2014. Ref.n. 4.14/06800.0123 (OM 002/14). 01/15.



Permalink

The JV Alstom Transporte (42.75 percent)/Instalaciones Carlos Busto (5 percent)/Indra Sistemas (35.15 percent)/Indra Sistemas de Seguridad (17.10 percent) secured the EUR29.8 million contract, excluding VAT, for construction and maintenance of civil protection and safety equipment of the tunnels on the section La Robla-Pola de Lena (Pajares bypass), new Madrid-Asturias high-speed line. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-mail pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=396652-2014. Ref.n. 4.14/06800.0123 (OM 002/14). 01/15.



Permalink


The joint venture of Impermeabilizacion Tunel and Pajares Norte from Alcobendas secured the contract n.246.561, the value of EUR2.25 million, excluding VAT, for the procedure for  the acquisition of existing temporary power supply, ventilation, lighting and communications installations of the Pajares Tunnel (Lot North).  For more information contact: Tragsa SA from Madrid, tel +34 913963667, fax +34 913969172, email contratacion@tragsa.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=066759-2017. Ref.n. TSA000062328. 09/17.




Permalink

Open invitation to tender, deadline 16.11.2017, for consultancy and technical assistance during lining work for the Folledo tunnel (2 km long) on the La Robla-Pola de Lena (Pajares bypass), section. This tunnel is on the new Madrid-Asturias high speed line. Duration of the contract will be 14 months from the award, renewable for 7 months maximum. Value contract  EUR1.04 million, excluding VAT. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=396903-2017. Ref.n. 3.17/20830.0234 (CON 015/17). 41/17.



Permalink

The JV Constructora San Jose SA (60 %)/Ferpi Transportes y Obras SA at Pontevedra secured the EUR6.55 million contract, excluding VAT, for lining work for the Folledo tunnel (2 km long) on the La Robla-Pola de Lena (Pajares bypass) section. This tunnel is on the new Madrid-Asturias high speed line. Value of thr contract is EUR6.55 million, excluding VAT. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=089039-2018.

Ref.n. 3.17/20830.0042 (ON 003/17). 11/18.



Permalink

Prior information notice without call for competition for the provision of protection and safety equipment in the Pajares tunnels. The contract value is EUR1.86 million, excluding VAT. Duration of the contract is 14 months from award. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188941-2018.

25/18.



Permalink


Prior information notice without call for competition for the ACO (Asistencia para el Control de las Obras) for the installation of protection and safety equipment in the Pajares tunnels. The contract value is EUR1.86 million, excluding VAT. Duration of the contract is 14 months from award.

Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188941-2018.

25/18.




Permalink


Prior information notice without call for competition for installation of protection and safety equipment in tunnels of the Pajares bypass. Value of the contract is EUR 74.28 million, excluding VAT. Duration of the contract 14 months from award. Contact Adif-Alta Velocidad, Madrid, tel  +34 915066671, email subirecciongestionadministrativa@adif.es.

Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185753-2018.

27/18.




Permalink

Prior information notice without call for competition for the technical assistance for the supervision of acoustic protection works on Pajares bypass. Scheduled date of publication of the call for tenders: 01/03/2019. Contract value 55.000 Euro, VAT excludedContact Adif, Madrid, email gestionadministrativaAV@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=078749-2019.

08/19.



Permalink

Periodic indicative notice without call for competition for installation of protection and safety equipment in tunnels of the Pajares bypass. Value of the contract is EUR57 million, excluding VAT. Duration of the contract will be 18 months from the award. Contact Adif-Alta Velocidad, Madrid, email gestionadministrativaAV@adif.es.. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=106402-2019.

11/19.




Permalink

Periodic indicative notice without call for competition for assistance for the control of works  during installation of protection and safety equipment in tunnels as part of the Pajares bypass. Value of the contract is EUR2.85 million, excluding VAT. Duration of the contract will be 12 months.

Contact Adif-Alta Velocidad, Madrid, email gestionadministrativaAV@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096544-2019.

Ref.n. 19FEI37396.  11/19.



Permalink

Open invitation to tender, deadline 10/09/2019, for technical assistance for control and monitoring of electric traction substation works and associated auto - transformation centres, power remote control and double 20kv line on the La Robla - Pola de Lena section (Pajares bypass). Value of the contract is EUR447,869.65, excluding VAT. Duration of the contract will be 10 months. Contact Adif-Alta Velocidad, attn Rosa Samper, Madrid, tel +34 913007589, fax +34 917674490, email RSAMPER@ADIF.ES. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358453-2019.

Ref.n. 3.19/20830.0192.  32/19.



Permalink

The JV Comsa Instalaciones y Sistemas Industriales / Sacyr Neopul secured the EUR12.81 million contract, including VAT, for the overhead contact line and associated systems on the La Robla-Campomanes section (Pajares bypass). The estimated execution time is 15 months. Contact ADIF Alta Velocidad, attn Rosa  Samper, Madrid, tel +34 913007589, email rsamper@adif.es.  Visit http://www.adifaltavelocidad.es and http://prensa.adifaltavelocidad.es. Ref.n. 3.19/20830.0237. 28/20.




Permalink

The JV Alstom Transporte, Indra Sistemas and Constructora San Jose secured the EUR64.38 million contract, including VAT, for protection and security equipment in the tunnels of the La Robla-Pola de Lena section, Pajares Bypass. The estimated execution time is 18 months. Contact ADIF Alta Velocidad, attn Tomas Rodriguez, Madrid, tel +34 917744838, email contrataciondcc@adif.es. Visit http://www.adifaltavelocidad.es and http://prensa.adifaltavelocidad.es. Ref.n. 3.19/20830.0324. 28/20.





Permalink


The JV Saite SA and Geocontrol SA from Leioa secured the EUR948,550.07 contract, excluding VAT, for consulting and technical assistance to the construction management of Adif - High Speed for protection and safety equipment in the tunnels of the La Robla-Pola de Lena section, Pajares Bypass. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. For further on the tender click here. Ref.n. 3.19/20830.0192. Ref.n. 3.20/20830.0049 – CON 004/20. 02/21.

 




Permalink


The Joint Venture Alstom Transporte SA (35 %) – Indra Sistemas SA (35 %) – Constructora San Jose SA (30 %) from Madrid secured the EUR 53.20 million contract, excluding VAT, for protection and safety equipment in the tunnels of the La Robla-Pola de Lena section, Pajares Bypass. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. For further on the tender click here. Ref.n. 3.19/20830.0324 – ON 034/19. 02/21. 

 




Permalink


Periodic indicative notice for adaptation of access, evacuation and protection and security installations in the tunnels of the Pajares bypass on the León-Asturias high-speed line. Click here for tender documents and here where tenders or requests to participate must be submitted electronically. Estimated date of publication of contract notice: 30/06/2021. Value of the contract is EUR14 million, excluding VAT. Duration of the contract will be 13 months. Contact ADIF Alta Velocidad,  Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es.  For further on TED tender, please click here. 14/21. 

 




Permalink


Periodic indicative notice for technical assistance to works management for adapting access, evacuation, protection and security facilities in the tunnels of the Pajares bypass. Click here for procurement and here for tenders or requests to participate. Estimated date of publication of contract notice: 30/06/21. Value of the contract is EUR 700,000, excluding VAT. Duration of the contract 17 months. Contact Adif-Alta Velocidad, Madrid, tel +34 917744804, fax  +34 917674490, email contrataciondcc@adif.es. For further information on TED tender, please click here. 17/21.  




Permalink


Periodic indicative notice for the adaption works of access, evacuation, protection and security facilities in the tunnels of the Pajares bypass. Click here for procurement and here for tenders or requests to participate. Estimated date of publication of contract notice: 30/06/21. Value of the contract is EUR14 million, excluding VAT. Duration of the contract 14 months. Contact Adif-Alta Velocidad, Madrid, tel +34 917744804, fax  +34 917674490, email contrataciondcc@adif.es. For further information on TED tender, please click here. 17/21.  




Permalink


The Consortium composed of Indra (35%), Alstom (35%) and Constructora San Jose (30%) has awarded Zitron  with the supply and commissioning of the tunnel ventilation system for the 25 km High-Speed Rail twin-tube tunnels of Pajares.  

The project includes a longitudinal system, comprising the installation of 212 jet fans, distributed throughout the tunnels. These units are designed and certified to work at 400ºC during at least two hours and are completely made of 316L quality stainless steel to withstand the harsh environmental conditions of the tunnel. In addition, special attention has been paid to their reinforced design, as they must be able to withstand pressures of up to 10,000 Pa produced by the piston effect of high-speed trains. Visit https://zitron.com. 20/21. 

 




Permalink


Open invitation to tender, deadline 07/06/2021, for the adaptation of access, evacuation, protection and security installations in the tunnels of the Pajares bypass on the León-Asturias high-speed line. Click here for tender documents and here where tenders or requests to participate must be submitted electronically. Value of the contract is EUR13.5 million, excluding VAT. Duration of the contract will be 14 months. Contact ADIF Alta Velocidad,  Madrid, email contrataciondcc@adif.es.  For further on TED tender, please click here. Ref.n. 3.21/20830.0035 – ON 007/21. 21/21.  

 




Permalink


Cavosa Obras y Proyectos SA from Madrid secured the EUR 11.24 million contract, excluding VAT, for the adaptation of access, evacuation, protection and security installations in the tunnels of the Pajares bypass on the León-Asturias high-speed line. Contact ADIF Alta Velocidad,  Madrid, email contrataciondcc@adif.es.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=545595-2021. Ref.n. 3.21/20830.0035 – ON 007/21. 43/21. 



Permalink


Segura Control SA from Madrid secured the EUR 605,841.60 contract, excluding VAT, for the surveillance and access control service in the Pajares tunnels and their annexed facilities (Madrid-Asturias high-speed line). Contact Empresa de Transformación Agraria S.A.,S.M.E., M.P., (TRAGSA), Madrid, tel +34 913963667, fax +34 913969172, email contratacion@tragsa.es.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=041948-2022. Ref.n. TSA000071457. 04/22. 



Permalink


Typsa (Tecnica Y Proyectos, SA) from San Sebastian de los Reyes secured the EUR563,508.79 contract, excluding VAT, for technical assistance to works management for adapting access, evacuation, protection and security facilities in the tunnels of the Pajares bypass. Contact Adif-Alta Velocidad, Madrid, tel +34 917744804, fax  +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091378-2022. Ref.n. 3.21/20830.0052 - CON 002/21. 07/22.   



Permalink


Asociacion de Accion Ferroviaria (Cetren) from Madrid have secured the contracts for 9 lots for CE validation  of interoperability of the infrastructure and/or energy subsystems on the new high speed railway sections: 

  • Lot1: Olmedo-Zamora-Pedralba, value of the contract EUR355,000, excluding VAT; 
  • Lot 2: Valladolid-Leon/Venta de Banos-Burgos, value of the contract EUR495,000, excluding VAT; 
  • Lot 3: Antequera-Granada, value of the contract EUR188,000, excluding VAT; 
  • Lot 4: La Robla-Pola de Lena, value of the contract EUR249,000, excluding VAT;
  • Lot 5: Castellbisbal-Tarragona (Vilaseca)-Vandellos-Castellon-Valencia, value of the contract EUR664,000, excluding VAT;
  • Lot 6: Monforte del Cid-Murcia-Alicante (Cambiador Encina)-Jativa-Valencia, value of the contract EUR305,000, excluding VAT;
  • Lot 7: Plasencia-Badajoz, , value of the contract EUR170,000, excluding VAT; 
  • Lot 8: Vigo-Santiago-la Coruna-Orense-Santiago, value of the contract EUR567, 000, excluding VAT; 
  • Lot 9: Tunnel AV Atocha-Chamartin, , value of the contract EUR43,459, excluding VAT. 

Contact  Adif Alta Velocidad, attn Francisco Macias Bonilla, Madrid, tel +34 661347788,  email fmacias@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120827-2022. Ref.n. 3600000039. 11/22.




Permalink


Modification of the contract secured to the Joint Venture Alstom Transporte SA (35 %) – Indra Sistemas SA (35 %) - Constructora San Jose SA (30 %) from Madrid for protection and security installations in the tunnels of the La Robla-Pola de Lena section, Pajares Bypass. Contact Adif - Alta Velocidad, attn Jose Vicente Rodriguez, Madrid, tel +34 917744891, fax +34 917674490, email jvrodriguez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=360496-2022. Ref.n. 3.19/20830.0324 – ON 034/19. 28/22.  



Permalink


Open invitation to tender, deadline 11/12/2023, for the maintenance  of civil protection and security facilities in the tunnels of the La Robla - Pola de Lena high-speed line (Pajares Bypass). Click here for tender documents and here where tenders must be sent. Value of the contract is EUR 4,490,551.32, excluding VAT. Duration of contract 24 months. Contact Adif, Madrid, tel +34 91 300 6638, email compras.contratacion@adif.es. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=660530-2023. Ref.n. 2.23/21520.0128.  45/23. 

 




Permalink

The JV Tuneles Robla-Pola de Lena from Madrid secured the EUR2.75 million contract, excluding VAT, for the maintenance  of civil protection and security facilities in the tunnels of the La Robla - Pola de Lena high-speed line (Pajares Bypass). Contact Adif, Madrid, tel +34 91 300 6638, email rosa.cabrerizo@adif.es. Visit  https://ted.europa.eu/en/notice/-/detail/282685-2024 . Ref.n. 2.23/21520.0128.  20/24. 



Permalink

Spain, Malaga - es/54

Water Distribution

Open invitation to tender, deadline 10th September, 2001, for engineering design and EIS of Aliviadero water tunnel as part of Limonero dam project for ACS, Malaga, fax +34 95 2206817. Visit www.boe.es 35/01. Two design supervision tenders, deadline 11th December, 2001. First for 5.5 km tunnel to link Guadalmedina to La Vií±uela Dam for which seventeen bids have been submitted for the design and nineteen for the EIS. Visit http://ted.eur-op.int, document S 206-141359. Second for 11 km discharge tunnel between Limonero Dam and Rock of El Cuervo, for which eleven bids have been received for the design and sixteen for the EIS. Visit http://ted.eur-op.int, document S 206-141360. Contact Acusur, Malaga, fax +34 952206817. Visit www.acusur.es 45/01. Ayesa-Narval jv appointed for the design of the 5.5 km tunnel between Guadalmedina and La Vií±uela Dam for Euro1 million. EIS contract awarded to Interlab. Iberinsa commissioned for the design of the 11 km discharge tunnel to link Limonero Dam to El Cuervo for Euro1.8 million. EIS contract awarded to Eptisa. Design time frame to last 8 months for both projects. Visit www.acusur.es 46/01.Cancellation of the two design supervision tenderings for the 5.5 km tunnel to link Guadalmedina to La Vií±uela Dam, and the 11 km discharge tunnel between Limonero Dam and Rock of El Cuervo. Visit http://ted.eur-op.eu.int, documents S 206-141359 and 141360. 48/01.



Permalink

Spain, Puertollano - es/53

Motorway

Preannouncement of invitation to tender for consultancy contract to establish route of A42 motorway from Levante to Extremadura with 1.4 km-long tunnel. Visit www.boe.es 24/01. Open invitation to tender, deadline 19th October, 2001, for engineering design of the N-420 Variante de Poblacion, Puertollano section with 1 km-long x 90 sq m tunnel. Contact Ministry of Works, fax +34 91 597 8537, or visit www.boe.es 42/01.Award to Ofiteco of a €790,800 engineering contract for the Puertollano variant on N-420 in Ciudad Real province. There is a 1 km tunnel. Visit www.ofiteco.es 25/02.



Permalink