Spain,
Andalusia
- es/113
Highway
Invitation to tender imminent, further to government approval, for construction of the second carriageway on highway A-4, direction Seville-Madrid, through Despeñaperros, section Venta de Cárdenas-Santa Elena, in Jaen and Ciudad Real provinces. Length is 8.8 km and time frame of 42 months. Tender budget: EUR110.94 million. The alignment runs through the Despeñaperros National Park and requires the construction of six tunnels: Las Lomas (215 m), La Aliseda (370 m), Las Tinajuelas (980 m), this one being a twin bore, La Cantera (390 m), Despeñaperros (1.850 m) and El Corzo (372 m). All tunnels to accommodate two 2.5 m-wide lanes plus two pavements, 2.5 m and one metre, except Despeñaperros and El Corzo which will accommodate three 3.5 m-wide lanes plus two one metre pavements. The budget for tunnelling accounts for 70% of the tender budget. 08/04.Open call for bids, deadline 4th May, 2004 for construction of a 8.5 km section of highway A-4, direction Cadiz-Madrid, between Santa Elena and Venta de Cardenas in Despenaperros. Includes five single-tube tunnels (215 m, 370 m, 390 m, 1,850 m and 372 m) and one twin-tube tunnel (980 m). Tender budget for tunnels: EUR42.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=041890-2004, OJ S 49, or contact Ministry of public works, Madrid, fax +34 915978537 or 8470. E-mail plicas-carreteras@mfom.es 12/04.Open call for bids, deadline 6th July, 2004 for work control and construction management of section Venta de Cardenas-Santa Elena in Despenaperros in Jaen province. Four single-tube tunnels must be built (215 m, 370 m, 390 m, 1.850 m and 372 m) and one 980 m twin bored tunnel. Tender budget: EUR2.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079867-2004, OJ S 100, or contact Ministry of public works, Madrid, fax +34 915978537 or 8470. E-mail cpublic@mfom.es 23/04.FCC has scooped a EUR79.1 million contract to build the new Despenaperros carriageway on the Venta de Cardenas-Santa Elena section of the south highway A-4. Building of this 8.9 km section will take 40.5 months. Along the route, there are tunnels in Las Lomas (215 m), La Aliseda (370 m), Tinajuelas (980 m), which will be a twin bored tunnel including the main tunnel and its parallel safety tunnel, La Cantera (390 m), Despenaperros (1,850 m), also a twin bore with a parallel safety tunnel, and El Corzo (372 m). Despenaperros and El Corzo will be three-lane tunnels. The six tunnels total 4,618 m. The tunnels account for approximately 70% of the total cost of the project. Visit www.fcc.es 42/04.Aepo secured a EUR1.9 million contract for work control and supervision during construction of the new Despenaperros carriageway on the Venta de Cardenas-Santa Elena section (8.9 km) of the south highway A-4. Includes six tunnels totalling 4,618 m. Visit www.aepo.es 02/05.Open invitation to tender, deadline 13th May, 2008 for construction of the southbound carriageway on the southern motorway A-4, section Venta de Cárdenas-Santa Elena. This 9 km section includes the 166 m La Cantera tunnel and the 1,823 m Despeñaperros tunnel, which is a three-lane tunnel. The tunnels will be constructed in slates, sandstone and quartzites. The drill and blast method in a top heading / bench sequence will be adopted as per NATM along with a mechanical excavator in weaker areas where canopies of steel pipes will be installed. The primary support will consist of fibre-reinforced shotcrete, bolts and/or steel arches. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=63521-2008, OJ S 46, or contact Ministry of development, Madrid, fax +34 915978547 or 915978470. E-mail jmmendoza@fomento.es or cpublic@fomento.es 11/08.The Ministry of development awarded FCC a EUR97 million contract for the construction of the southbound carriageway on the southern motorway A-4, section Venta de Cárdenas-Santa Elena. This 9 km section includes the 166 m La Cantera tunnel and the 1,823 m Despeñaperros tunnel, which is a three-lane tunnel. Click es/113 for more details. Visit www.fcc.es 31/08.
Spain,
Castilla & León
- es/110
High Speed Railway
Open call for bids, deadline 20th January, 2004 for design of the Zamora-Lubián section, subsection Cernadilla-Pedralba de la PraderÃÂa. This subsection includes two tunnels in Otero (1.062 m) and Puebla (1.084 m). Tender budget: €2.1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=216432-2003, OJ S 243, or contact Ministerio de Fomento, Madrid, fax +34 91 5979342 or 8470. E-mail vrpascual@mfom.es or cpublic@mfom.es 02/04.Open call for bids, deadline 19th February, 2004 for design of the Pedralba de la Praderia-Lubian subsection. Includes tunnels in Pedralba (1,659 m), Requejo (2,600 m), Padornelo (5,971 m) and Aciberos (200 m). Tender budget: EUR2.7 million. Time frame: 14 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=011767-2004, OJ S 14, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470. E-mail vrpascual@mfom.es or cpublic@mfom.es 06/04.Typsa has secured a EUR1.8 million contract to design the Cernadilla-Pedralba de la Praderia section on the Zamora-Lubian line, which includes the Otero and Puebla tunnels, 1,062 m and 1,084 m. www.typsa.es 15/04.Getinsa and Geocontrol have secured a EUR1.8 million contract to design the Pedralba de la Praderia-Lubian subsection on the Zamora-Lubian section of the Madrid-Galicia high speed line. This subsection includes four tunnels: Pedralba (1,659 m), Requejo (2,600 m), Padornelo (5,971 m) and Aciberos (200 m). Visit www.getinsa.es and www.geocontrol.es 26/04.Open call for tenders, deadline 11th June, 2007 for geological and geotechnical studies for the Venta de Baños junction in Palencia province. The section is 24.9 km long and includes two tunnels of 2,175 metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=99347-2007, OJ S 81, or contact ADIF, Madrid, fax +34 917004700. 18/07.Open invitation to tender, deadline 5th February, 2008 for design of the 27 km Venta de Baños section, including two tunnels of 1.1 km each. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=1052-2008, OJ S 1, or contact ADIF, Madrid, fax +34 917005751. 04/08.AEPO secured a EUR2.3 million contract to design the 27 km Venta de Baños section on the Valladolid-Burgos-Venta de Baños-Palencia line. There are two tunnels, each 1.1 km in length. Visit www.aepo.es 20/08.
Pre-information notice for construction of the Pedralba de la Praderia-Padornelo tunnel subsection on the Zamora-Lubian section of the Madrid-Galicia high-speed line. Tender budget: EUR132.8 million. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215018-2009 or contact Seitt S.A. (Sociedad Estatal de Infraestructuras del Transporte Terrestre), Madrid, attn José Manuel Dorrego Iglesias, tel +34 9159166-29, fax -30, e-mail jmdorrego@seitt.es. For more on this project visit es/110 and www.fomento.es/NR/rdonlyres/A65E2FE8-5CC9-4E0B-A60E-1FE9DC239CEF/51841/09071801.pdf. 38/09.
Open invitation to tender, deadline 28.04.2010, for construction services, Padornelo tunnel-Cerdedelo section, AV Madrid-Galicia line. Contract value EUR1.35 million. Contact Adif, c/ Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es or pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=069437-2010. 12/10.Open invitation to tender, deadline 28.04.2010, for safety and health co-ordination, section Lubian-Orense, AV Madrid-Galicia line. Contract value EUR2.2 million. Contact Adif, c/Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es or pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=071252-2010. 11/10.
Open invitation to tender, deadline 22.08.2011, for construction of 3.2 km-long Lubian-Canda tunnel railway section, including Hedroso (913 m) and Lubian (1,710 m) tunnels. Contract value EUR99.4 million not including VAT, duration 32 months. Time limit for access to documents 16.08.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=210773-2011, GU S 127. 28/11.
Open invitation to tender, deadline 21.09.2011, for the construction of Requejo-Padornelo tunnel section on the Madrid-Galicia high speed line, including the 2,404.5 m-long Requejo tunnel. Contract value EUR72.5 million excluding VAT, duration 33 months. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=252471-2011 and http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/21EF6FA512BB7545C12578D100314910?Opendocument. 35/11.
Open invitation to tender, deadline 26.10.2011, for assistance services during the construction of Requejo-Padornelo tunnel section on the Madrid-Galicia high speed line, including the 2,404.5 m-long Requejo tunnel. Contract value EUR3 million excluding VAT, duration 37 months. Time limit for receipt of requests for documents or for accessing documents 19.10.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=286077-2011. 42/11.Open invitation to tender, deadline 26.10.2011, for assistance services during construction of 3.2 km-long Lubian-Canda tunnel railway section, including Hedroso (913 m) and Lubian (1,710 m) tunnels. Contract value EUR3 million excluding VAT, duration 36 months. Time limit for access to documents 19.10.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=286074-2011. 42/11.
The Jv Aldesa Construcciones/Coalvi/Proacon secured the EUR94 million contract for construction of 3.2 km-long Lubian-Canda tunnel railway section, including Hedroso (913 m) and Lubian (1,710 m) tunnels. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Click here and visit www.adif.es .46/11.
Open invitation to tender, deadline 28.12.2011, for the construction of the platform of the Padornelo tunnel-Lubian section on the Madrid-Galicia high speed railway, North-North East corridor. Contract value EUR113.2 million excluding VAT. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail: mjmoro@adif.es, fax +34 917745814. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=355258-2011. 46/11.
Open invitation to tender, deadline 28.12.2011, for assistance services during construction of the new 7.5 km tunnel di Padornelo-Lubian (Zamora) section on the high-speed line Madrid-Galicia, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense, including the new right tube of 6.4 km tunnel and the bypasses with the existing tube. Time limit for receipt of requests for documents or for accessing documents: 21.12.2011. Contract value EUR3.8 million excluding VAT, duration 46 months. Contact Adif, c/o Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=356782-2011. 47/11.
The JV Aldesa Construcciones (60%), Coalvi (20%) and Proacon (20%) secured the EUR79.7 million contract, VAT not included, for construction of 3.2 km-long Lubian-Canda tunnel railway section, including Hedroso (913 m) and Lubian (1,710 m) tunnels. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=391827-2011. 02/12.
JV Ferrovial Agroman/Compania de Obras Castillejos secured the EUR108.8 million contract, VAT included, for railway construction on the Padornelo tunnel-Lubian section on the Madrid-Galicia high speed railway, north-north east corridor. Contact Adif C/Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit
http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/E1A6497348B58C41C12579B1002C9411?Opendocument and www.ferrovial.com. 10/12.
The JV Tecnica y Proyectos e Intecsa-Inarsa secured the EUR3,263,484 contract for assistance services during construction of the new 7.5 km-long tunnel di Padornelo-Lubian (Zamora) section on the high-speed line Madrid-Galicia, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense, including the new right tube of an existing 6.4 km-long tunnel and connecting crosspassages. Contact Adif, c/o Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/CB272AB7D500824AC12579B5002D4F6B?Opendocument, www.typsa.es and www.intecsa-inarsa.es. 10/12.
Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 7.3 km-long tunnel de la Canda section, on Madrid-Galicia high-speed railway, North-North West corridor. Contract value EUR105.14 million, VAT not included, duration 35 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142756-2012. 19/12.
Open invitation to tender, deadline 21.06.2012, for construction of the platform of the right track 7.4 km-long tunnel de la Canda section on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR110.9 million, VAT not included, duration 35 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142757-2012. 19/12.
The JV Ferrovial Agroman (70 percent)/Castillejos Compania de Obras (30 percent), has been awarded the EUR92.27 million contract, VAT not included, for construction of the platform of the Padornelo tunnel-Lubian section on the Madrid-Galicia high speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es, fax +34 917745814. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=130526-2012. 19/12.
The JV Puentes y Calzadas Infraestructuras (90 percent)/Geotunel (10 percent) has been awarded the EUR58.2 million contract, VAT not included, for construction of the platform of the Requejo-Tunel de Padornelo section on the Madrid-Galicia high speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es, fax +34 917745814. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=093914-2012. 19/12.
The JV SA de Obras y Servicios Copasa (40 percent)-Copisa Constructora Pirenaica SA (40 percent)-Sercoysa Proyectos y Obras, SA (10 percent)-Covsa (10 percent) secured the EUR74.99 million contract, VAT not included, for construction of the platform of the left track 7.3 km-long tunnel de la Canda section, on Madrid-Galicia high-speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288096-2012. 38/12.
Open invitation to tender, deadline 18.01.2016, for the design of civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. The section includes the tunnels Espino (7.9 km and 7.8 km), O Canizo (5.4 km and 5.4 km), A Canda (7.3 km and 7.3 km) as well as the Padornelo-Lubian (7.3 km and 7.3 km). The contract value is EUR 457,201.03, VAT not included, duration of the contract is 12 months. The time limit for accessing documents is until the 11.01.2016. Contact Adif C/Hiedra, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422603-2015. Ref.n. 3.15/20830.0195 - P 010/15. 49/15.
Open invitation to tender, deadline 21.03.2017, for quality control tests on materials used at the Cernadilla – Pedralba - Tunel de Padornelo section, on the Madrid-Galicia high-speed line. This section includes two tunnels in Otero (1145 m) and Puebla (1499 m), Pedralba (1700 m) de la Praderia e Requejo (2405 m). The value of the contract EUR502,343.47 excluding VAT. The duration of the contract is 15 months. Contact Adif Alta Velocidad, Madrid, tel +34 917744804, fax +34 917745814, email mjmoro@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=038081-2017. Ref.n. 3.16/20830.0248 (AV 028/16). 05/17.
Prior information notice without call for competition for
the project to provide protection and safety equipment in the tunnels of the
Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. Value of
the contract is EUR32.23million, excluding VAT. Duration of the contract 15
months from award.
Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185758-2018.
27/18.
Elecnor SA from Madrid secured the EUR27.31 million contract, excluding VAT,
for the design and maintenance of civil
protection and safety equipment in the tunnels of the Pedralba-Vilarino
section, on the Madrid-Galicia high-speed railway. Contact Adif - Alta
Velocidad, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=111179-2019.
Ref.n. 4.18/20830.0283 – OM 001/18. 11/19.
Asociacion de Accion Ferroviaria (Cetren) from Madrid have secured the contracts for 9 lots for CE validation of interoperability of the infrastructure and/or energy subsystems on the new high speed railway sections:
- Lot1: Olmedo-Zamora-Pedralba, value of the contract EUR355,000, excluding VAT;
- Lot 2: Valladolid-Leon/Venta de Banos-Burgos, value of the contract EUR495,000, excluding VAT;
- Lot 3: Antequera-Granada, value of the contract EUR188,000, excluding VAT;
- Lot 4: La Robla-Pola de Lena, value of the contract EUR249,000, excluding VAT;
- Lot 5: Castellbisbal-Tarragona (Vilaseca)-Vandellos-Castellon-Valencia, value of the contract EUR664,000, excluding VAT;
- Lot 6: Monforte del Cid-Murcia-Alicante (Cambiador Encina)-Jativa-Valencia, value of the contract EUR305,000, excluding VAT;
- Lot 7: Plasencia-Badajoz, , value of the contract EUR170,000, excluding VAT;
- Lot 8: Vigo-Santiago-la Coruna-Orense-Santiago, value of the contract EUR567, 000, excluding VAT;
- Lot 9: Tunnel AV Atocha-Chamartin, , value of the contract EUR43,459, excluding VAT.
Contact Adif Alta Velocidad, attn Francisco Macias Bonilla, Madrid, tel +34 661347788, email fmacias@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120827-2022. Ref.n. 3600000039. 11/22.