Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Lombardy - it/214

Road

IGM Engineering Impianti Srl + DBA Progetti SpA (Genova) secured the EUR353,632 contract, excluding VAT, for design of tunnels equipment for Tremezzina bypass, SS 340 section Colonno-Griante. The new road is 10 km-long with 7.5 km in tunnels: Comacina (2.11 km), Perlana 1 (580 m), Perlana 2 (2 km), Bonzanigo (105 m) and Tremezzina (2.7 km). Contact Provincia di Como, Como, tel +39 031230462, fax +39 031230827, e-mail infogarecontratti@provincia.como.it. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=374637-2013 GU GU S 215. 45/13.



Permalink

Restricted invitation to tender, deadline 03/03/2020, for the executive design and construction of Tremezzina bypass on SS 340. The new 10km road includes 4 single tube tunnels for a 8.3km totally, three viaducts and two interchanges (Colonno at the South and Griante at the North). Value contract EUR469.08 million, excluding VAT. Duration contract 2788 days.

For tender documents https://acquisti.stradeanas.it where tenders must be sent. Contact Anas SpA, Rome, email ppalti.lavori@postacert.stradeanas.it.

For further tender information please click here. Ref.n. MI 193-19. 52/19.



Permalink


Consorzio Stabile Sis from Turin secured the EUR469.08 million contract, excluding VAT,  for the executive design and construction of Tremezzina bypass on the SS 340. The new 10km road includes 4 single tube tunnels for 8.3km in total , three viaducts and two interchanges (Colonno at the South and Griante at the North). Contact Anas SpA, Rome, email appalti.lavori@postacert.stradeanas.it.  For further tender information please click here. Ref.n. MI 193-19. 44/20.




Permalink


SIS Società Consortile per Azioni from Turin secured the EUR388.10 million contract, excluding VAT, for the executive design and construction of Tremezzina bypass on SS 340. The new 10km road includes 4 single tube tunnels (8.3km), three viaducts and two interchanges (Colonno at the South and Griante at the North). Contact Anas SpA, Rome, email appalti.lavori@postacert.stradeanas.it . For further tender information please click here. Ref.n. MI 193-19. 07/21. 

 




Permalink

Italy, South Tyrol - it/213

Road

Closing Date: 03.02.2014 (Tender Closed)

Open invitation to tender, deadline 03.02.2014, for construction of the Pinzolo bypass on SS239, which is 4,573 m-long with 2,750 m in cut/cover tunnels to be build on the left side of Sarca river. Value of contract EUR63.93 million. Contact Provincia Autonoma di Trento, att.n Paola Zorzi, Trento, tel +39 0461496444, fax +39 0461496422, e-mail serv.appalti.lav.pubb@pec.provincia.tn.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=363438-2013 and http://www.appalti.provincia.tn.it/binary.php/pat_pi_bandi_new/bandi/BANDO_INTEGRALE_DI_GARA.1383217713.pdf. 45/13.



Permalink

Italy, South Tyrol - it/212

Road

Closing Date: 18.02.2014 (Tender Closed)

Restricted procedure to tender, deadline 18.02.2014, for design and construction of the road link between Loppio and Alto Garda on the SS 240, and for management of the road section between Rovereto Sud paytoll on A2 and Km106,848 on SS 45 bis Gardesana Occidentale (at the border with Brescia province), length 27.7 km, 40 percent of which is in tunnel. Contact Provincia Autonoma Trento, Bid Office, att.n Rita Pancher, Trento, tel +39 0461496444, fax +39 0461496422, e-mail serv.appalti.lav.pubb@pec.provincia.tn.it. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=356270-2013, GU S 206. 43/13.



Permalink

Postponed from 18.02.2014 to 18.03.2014 the deadline of the restricted procedure to tender for design and construction of the road link between Loppio and Alto Garda on the SS 240, and for management of the road section between Rovereto Sud paytoll on A2 and km106,848 on SS 45 bis Gardesana Occidentale (at the border with Brescia province), length 27.7 km, 40 percent of which is in tunnel. Contact Provincia Autonoma Trento, Bid Office, att.n Rita Pancher, Trento, tel +39 0461496444, fax +39 0461496422, e-mail serv.appalti.lav.pubb@pec.provincia.tn.it. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=054577-2014. 09/14.



Permalink

The joint venture between Consorzio stabile s.a.c. Costruzioni Scarl from Torrecuso (BN) and Martinelli & Benoni Srl from Ronzo Chienis (TN) secured the EUR75.86 million contract, excluding VAT, for the road link between San Giovanni Pass - Cretaccio resort. This includes - the UF2 Tunnel, sequential contract A1, main contract (work S-815), the Functional Unit UF2 tunnel which is composed of  the Nago tunnel, the Crossroad at San Giovanni Pass and connection with the SS 240 towards Maza. Contact Provincia Autonoma di Trento, Trento, attn Dott.ssa Paola Viola, tel +39 461496444, fax +39 461496422, email serv.appalti@pec.provincia.tn.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=232324-2018 .Ref.n. 71681944D1.  22/18.



Permalink

Italy, Campania - it/211

Railway

Closing Date: 30.10.2013 (Tender Closed)

Rfi qualification system, deadline 30.10.2013, for safety improvement of the Massico railway tunnel (km155+855 - km 161+235) on the Rome-Naples line, with design and construction of technological equipment. Value of contract EUR4.15 million, excluding VAT. Contact Rfi Spa, Rome. Visit http://www.gare.rfi.it/cms/v/index.jsp?vgnextoid=7f561e65436a1410VgnVCM1000008916f90aRCRD. Ref. n. DAC.NA.0003. 42/13.



Permalink

Italy, Basilicata - it/210

Road

Closing Date: 30.10.2013 (Tender Closed)

Open invitation to tender, deadline 30.10.2013, for design and construction of Lot 6, part 1 and 2 of new SS95 Brienza bypass. Value of contract EUR130 million, 50 of which about OG4 category. The new 4 km road will include two tunnels (S. Giulano and Casola) for 1.5 km. Duration of contract 120 days for project and 1,100 days for construction. Time limit for info about bid: 24.10.2013. Contact Anas Spa,Bids and Contract Office, Rome, tel +39 06 490326, fax+39 06 44462009, e-mail r.marcelli@stradeanas.it, g.alimonti@stradeanas.it, Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/60248. Ref. n. PZ 02/13. 42/13.



Permalink

Postponed from 30.10.2013 to 05.11.2013 the deadline of the accelerated restricted procedure to tender for design and construction of Lot 6, part 1 and 2 of new SS95 Brienza bypass. Value of contract EUR130 million,  EUR50 million of which concerns OG4 category. The new 4 km road will include two tunnels (S. Giulano and Casola) for 1.5 km. Duration of contract 120 days for project and 1,100 days for construction. Time limit for info about bid: 29.10.2013. Contact Anas Spa,Bids and Contract Office, Rome, tel +39 06 490326, fax+39 06 44462009, e-mail r.marcelli@stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/60945, http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=357838-2013, http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=352505-2013 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=347127-2013. Ref. n. PZ 02/13. 43/13.



Permalink

Intercantieri Vittadello SpA (Designers A.T.P. Italconsult SpA - Proger SpA) of Limena (Pd) secured the EUR64,304,604 contract (50 percent of which about OG4 category) for design and construction of Lot 6, part 1 and 2 of new SS95 Brienza bypass. The new 4 km-long road will include two tunnels (S. Giulano and Casola) for 1.5 km. Duration of contract 120 days for design and 1,100 days for construction. Contact Anas Spa, Bids and Contract Office, Rome, tel +39 06 490326, fax+39 06 44462009, e-mail s.coltellacci@stradeanas.it. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=243603-2014. Ref. n. PZ 02/13. 31/14.



Permalink

Italy, South Tyrol - it/209

Sewer

Closing Date: 12.12.2013 (Tender Closed)

Open invitation to tender, deadline 12.12.2013, for rehabilitation of concrete structures in the vault of the 9,873 m Adige-Garda tunnel, used for the control and disposal of floodwaters of the river Adige. Value of contract EUR9.02 million. Further information, specs and docs from Laura Lucianer, Trento Province, Trento, tel +39 0461496444, fax +39 0461496422, e-mail serv.appalti.lav.pubb@pec.provincia.tn.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=335608-2013. 41/13.



Permalink

Pac SpA of Bolzano secured the EUR6.22 million contract, excluding VAT, for rehabilitation of concrete structures in the vault of the 9,873 m Adige-Garda tunnel, used for the control and disposal of floodwaters of the river Adige. Contact Trento Province, attn Sandra Sguario, Trento, tel +39 0461496444, fax +39 0461496422, e-mail serv.appalti.lav.pubb@pec.provincia.tn.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=110156-2015. 14/15.



Permalink

Italy, Ligure-Lombardy-Piedmont - it/208

High Speed Railway

On 19.09.2013 Impregilo signed an agreement with Tecnimont SpA, a subsidiary of Maire Tecnimont SpA, to acquire a further 10 percent stake in the COCIV Consortium, the general contractor for the construction of the Terzo Valico Ferroviario dei Giovi project (Milan-Genoa high-capacity, high-speed railway line), for a price of around EUR25 million.

As a result, the Salini Group now holds a total stake of 64 percent in the COCIV Consortium, whose contracted works for the construction of the Terzo Valico project amount to around EUR4.6 billion. The new high-speed/high-capacity line will be 53 km-long, of which 39 km is in tunnels, and is connected to the existing line through four interconnections at Voltri, Genova Parco Campasso, Novi Ligure and Tortona, in total 14 km-long.

Starting at the Genoa hub, the new line will be developed along the Genoa-Milan route as far as Tortona, and along the Alessandria-Turin route as far as Novi Ligure, and will then connect with the existing lines connecting with Milan and Turin. Visit www.salini-impregilo.com. 39/13.



Permalink

Open invitation to tender, deadline 11.06.2015, for construction of km 7+914,00 - km 12+683,53 section, Lot Cravasco of Terzo Valico Ferroviario dei Giovi project, the Milan-Genoa high-capacity, high-speed railway line. Value of contract EUR245.36 million, excluding VAT, EUR182.68 of which in OG4 category. Contact COCIV, attn eng Andrea Ottolin, Genoa, tel +39 0104218711, fax +39 0104218708, e-mail rup@cociv.postecert.it. For electronic access to information and submission of tenders http://www.pleiade.it/cociv. Duration of contract 1,364 days from award. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=082711-2015. 19/15.



Permalink

Oberosler Cav. Pietro SpA of San Lorenzo di Sebato (BZ) secured the EUR54.08 million contract, excluding VAT, for construction of km 28+667,75-km 29+958,49 section, Lot Libarna of Terzo Valico Ferroviario dei Giovi project, the Milan-Genoa high-capacity, high-speed railway line. Contact COCIV, attn eng Andrea Ottolin, Genoa, tel +39 0104218711, fax +39 0104218708, e-mail rup@cociv.postecert.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=131216-2015. 19/15.



Permalink


Open invitation to tender, deadline 07.12.2015, for the construction of section km29+958,49-36+280,64 (Lot Serravalle) of the Terzo Valico dei Giovi project (Milan-Genoa high-capacity, high-speed railway line). Value of the contract is EUR189.65 million (181.37 of which belonging to OG4 category), this excludes VAT. Duration of the contract is approximately 36 months from award. Contact COCIV (Consorzio Collegamenti Integrati Veloci), att.n Andrea Ottolin, Genova, tel +39 010 4218711, fax +39 010 4218708, e-mail rup@cociv.postecert.it, website http://www.terzovalico.it. Visit https://cociv.i-faber.com/sourcing/tenders/resume/id/10763 . 44/15.




Permalink


Grandi Lavori Fincosit SpA from Rome secured the EUR164,67 million contract, excluding VAT, for the construction of section km29+958,49-36+280,64 (Lot Serravalle) of the Terzo Valico dei Giovi project, Milan-Genoa high-capacity, high-speed railway line. For further information contact COCIV (Consorzio Collegamenti Integrati Veloci), att.n Andrea Ottolin, Genova, tel +39 010 4218711, fax +39 010 4218708, e-mail rup@cociv.postecert.it, website http://www.terzovalico.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=190949-2016 and https://cociv.i-faber.com/sourcing/awards/resume/id/10763/idL/1. 25/16.




Permalink


Open invitation to tender, deadline 18.07.2016, for the construction of the railway superstructure from km 0+333.00 to km52+890.00 and for civil works and associated works from km 44+152.65 to km 52+974.50 for the Terzo Valicodei Giovi project  on the Milan-Genoa high-capacity, high-speed railway line. The contract value is EUR 159.26 million, excluding VAT. The duration of the contract is 1494 days from the award. For further information contact COCIV (Consorzio Collegamenti Integrati Veloci), attn Andrea Ottolin, Genova, tel +39 010 4218711, fax +39 010 4218708, e-mail rup@cociv.postecert.it, websitehttp://www.terzovalico.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=199396-2016 and https://cociv.i-faber.com/sourcing/tenders/resume/id/10765. 25/16.




Permalink

Open invitation to tender, deadline 28.09.2017, for civil works and associated works from km 19+700.00 to km 27+455.00. This is for the Terzo Valicodei Giovi project on the Milan-Genoa high-capacity, high-speed railway line, Lot Valico (Radimero). The contract value is EUR 212.29 million, excluding VAT. The duration of the contract is 1,175 days from the award. For further information https://www.pleiade.it/cociv  where offers need to be sent. Contact COCIV (Consorzio Collegamenti Integrati Veloci), attn ing. Marcos Montevecchi, Genova, tel +39 0104218715, email RUP@COCIV.POSTECERT.IT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=298551-2017 and https://cociv.i-faber.com/sourcing/tenders/resume/id/10770. Ref.n. F81H92000000008. 38/17.



Permalink

Grandi Lavori Fincosit SpA from Rome secured the EUR228.62 million contract, excluding VAT, for construction of km 16+275,50-km 20+988,50 section, Lot Val Lemme of Terzo Valico Ferroviario dei Giovi project, the Milan-Genoa high-capacity, high-speed railway line. Contact COCIV, attn eng Andrea Ottolin, Genoa, tel +39 0104218711, fax +39 0104218708, email rup@cociv.postecert.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=330348-2016 . 38/16.



Permalink

Open invitation to tender, deadline 06.06.2017, for construction of km 16+275,50 - km 19+700 section, Lot Vallemme of Terzo Valico Ferroviario dei Giovi project, the Milan-Genoa high-capacity, high-speed railway line. Value of contract EUR263.49 million, excluding VAT. Duration of contract 1,331 days from award. Contact COCIV (Consorzio Collegamenti Integrati Veloci), attn Eng. Marcos Montevecchi, Genoa, tel +39 0104218715, email RUP@COCIV.POSTECERT.IT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=141074-2017 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=179583-2017. 20/17.



Permalink

The awarding procedure for construction of km 7+914,00 - km 12+683,53 section, Lot Cravasco of Terzo Valico Ferroviario dei Giovi project, the Milan-Genoa high-capacity, high-speed railway line, has been discontinued. Value of contract EUR245.36 million, excluding VAT, EUR182.68 of which in OG4 category. Duration of contract 1,364 days from award. Contact COCIV, Genoa, tel +39 0104218711, email PEC@COCIV.POSTECERT.IT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=438880-2016. 51/16.



Permalink

Open invitation to tender, deadline 31.08.2017, for construction of km 7+914,00 - km 12+683,53 section, Lot Cravasco of Terzo Valico Ferroviario dei Giovi project, the Milan-Genoa high-capacity, high-speed railway line. Value of contract EUR251.29 million, excluding VAT, EUR186.30 of which in OG4 category. Duration of contract 1489 days from award. Contact COCIV, attn eng Marcos Montevecchi, Genoa, tel +39 0104218715, email RUP@COCIV.POSTECERT.IT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=244323-2017. 27/17.



Permalink

Open invitation to tender, deadline 20.07.2017, for construction of km 12+673,50 - km 16+275,50 section, Lot Castagnola, of Terzo Valico Ferroviario dei Giovi project, the Milan-Genoa high-capacity, high-speed railway line. Value of contract EUR216.27 million, excluding VAT, EUR176.20 of which in OG4 category. Duration of contract 1221 days from award. Contact COCIV, attn eng Marcos Montevecchi, Genoa, tel +39 0104218715, email rup@cociv.postecert.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=183087-2017 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=229044-2017. 25/17.



Permalink

Grandi Lavori Fincosit Spa from Rome secured the EUR263.49 million contract, excluding VAT, for construction of km 16+275,50 - km 19+700 section, Lot Vallemme of Terzo Valico Ferroviario dei Giovi project, the Milan-Genoa high-capacity, high-speed railway line. Contact COCIV (Consorzio Collegamenti Integrati Veloci), attn Eng. Marcos Montevecchi, Genoa, tel +39 0104218715, email RUP@COCIV.POSTECERT.IT. Visit https://www.terzovalico.it/media/news/cociv-annuncia-l-aggiudicazione-definitiva-del-primo-bando-di-gara-lotto-val-lemme.html. 38/17.



Permalink

Open procedure, deadline 19.02.2018, for the assignment of works for the construction of civil, line works and related works.

The open procedure is pursuant to art. 60 of Legislative Decree no. 50/2016 and subsequent amendments, entirely managed by electronic means, for the assignment of works for the construction of civilian line works and related works connected by pk 0 + 437.45 to pk 7 + 914.00 of the even track of the section AV / AC Third Pass of the Giovi, from pk 0 + 437.45 to pk 7 + 924.03 of the odd track of the section AV / AC Third Valico dei Giovi, from pk 0 + 236.00 to pk 2 + 356.986 of the even track of the Voltri interconnection, from pk 0 + 235.014 to pk 4 + 160.705 of the odd track of the Voltri Interconnection - Voltri interconnection link and completion Polcevera for a total tender amount of 380 202 249.26 EUR, excluding VAT, of which EUR 376 045 004,07 for work to size and EUR 4 157 245,19 for non-discounting security charges, subdivided into a fixed part relating to the execution of the works falling partly in the First Constructive Lot, partly in Second Constructive Lot, partly in the Third Constructive Lot, partly in the Fourth Constructive Lot and in an optional part related to the execution of the works that fall in part in the Fifth Constructive Lot, partly in the Sixth Constructive Lot.
These works are as follows:
- Category OG4: EUR 302 379 877.74 (three hundred and twenty million three hundred and seventy seven seventy eight eight hundred seventy seven / 74) prevalent category, subject to compulsory qualification, subcontracting within the limit of 30% of the total amount of the contract,
- Category OS21: 56 625 838.72 EUR (fifty-six million, six hundred and twenty-five eight hundred and thirty-eight / 72), a detachable category, a compulsory, superspecialistic category of more than 10% (ten per cent), sub-contracted within the limit of 30% (thirty per cent) of the relevant amount,
- Category OG1: EUR 2 631 536.70 (two million six hundred thirty-one thousand five hundred and thirty-six / 70) eligible category, subject to compulsory qualification, 100% sub-contracted,
- Category OG3: EUR 6 027 759.75 (six million one hundred seventy seven thousand seven hundred and fifty nine / 75), a detachable category with compulsory qualification, 100% sub-contracted,
- Category OS3: EUR 1 156 749.67 (one million two hundred and fifty six thousand seven hundred and forty-nine / 67) eligible category, subject to compulsory qualification, 100% sub-contracted,
- Category OS6: EUR 2 224 278,24 (two million two hundred twenty four thousand two hundred seventy-eight / 24) eligible category, 100% sub-contracted,
- OS8 category: EUR 8 435 576,65 (eight million four hundred thirty, five thousand, five hundred and seventy-six / 65), a detachable category with compulsory qualification, 100% sub-contracted,
- Category OS12-B: EUR 498 214.41 (four hundred ninety eight million two hundred and fourteen / 41) eligible category, subject to compulsory qualification, 100% sub-contracted,
- Category OS31: 222 417.38 (two hundred and twenty-two thousand four hundred and seventeen / 38) divisible category, 100% sub-contracted.

 

The contract duration is 1127 days from the award. Contact COCIV, att.ne Ing. Marcos Montevecchi, Genoa, tel +39 01042188791, email RUP@COCIV.POSTECERT.IT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=508749-2017, OJ S 244. 51/17.



Permalink

The JV Toto Costruzioni Generali (58%) and Seli Overseas (42%) secured the EUR190 million contract for civil works and associated works from km  19+700.00 to km 27+455.00 of the Terzo Valico dei Giovi project on the  Milan-Genoa high-capacity, high-speed railway line, Lot Valico (Radimero).

The contract includes the construction with 2 TBM EPB of a 7.7km bitube tunnel with a 8.66 m inner diameter. The previewed duration is 33 months.  For further information click here. Contact COCIV (Consorzio Collegamenti Integrati Veloci), attn ing. Marcos Montevecchi, Genova, tel +39 0104218715, email RUP@COCIV.POSTECERT.IT. Visit http://totospa.it/  and http://www.selioverseas.com/.

and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=055984-2018.

Ref.n. F81H92000000008. 05/18.



Permalink

Postponed  until the 12.03.2018 the deadline of the open invitation tender. This is for the assignment of works for the construction of civil, line works and related works AV / AC  on the  Terzo Valico dei Giovi project; Voltri interconnection and completion Polcevera, belonging to II, III, IV, V and VI constructive Lots.

Value of the contract is EUR343.70 million, excluding VAT, with EUR274.01 million belonging to the  OG4 category. The contract duration is 1028 days from the award. Contact COCIV, att.ne Ing. Marcos Montevecchi, Genoa, tel +39 01042188791, email RUP@COCIV.POSTECERT.IT. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=077971-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=071319-2018.

10/18.



Permalink

Open procedure, deadline 09.04.2018, for the construction of civil and scheduled works and related works associated to the construction of the section of the AV / AC section Terzo Valico dei Giovi, from km 36 + 585 to km 52 + 753 BP (even) and from km 36 + 585 to km 52 + 974 BD (odd). For lot Pozzolo - Tortona, partly falling into the first building lot, partly in the second construction lot, partly in the third building lot, partly in the fourth construction lot (fixed part), partly in the fifth construction lot and partly in the sixth constructive lot (optional part). Contract value € 106.19 million, excluding VAT. The contract duration will be 1266 days from the award. Contact COCIV, att.ne Ing. Marcos Montevecchi, enova, tel +39 0104218711, email rup@cociv.postecert.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=086594-2018, GU S 040. 11/18.



Permalink

The JV Research Consorzio Stabile Società Consortile arl. and Manelli Impresa Srl from Naples secured the EUR74.15 million contract, excluding VAT, for the construction of civil and scheduled works. Includes related works associated to the construction of the section of the AV / AC section Terzo Valico dei Giovi, from km 36 + 585 to km 52 + 753 BP (even) and from km 36 + 585 to km 52 + 974 BD (odd). 

For lot Pozzolo - Tortona, partly falling into the first building lot, partly in the second construction lot, partly in the third building lot, partly in the fourth construction lot (fixed part), partly in the fifth construction lot and partly in the sixth constructive lot (optional part). Contact COCIV, attn. Eng Marcos Montevecchi, Genoa, tel +39 0104218711, email rup@cociv.postecert.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=047349-2019.

06/19.




Permalink

Pavimental S.p.A. secured the EUR282.54 million contract, excluding VAT, for works for the construction of civil, line works and related works AV / AC  on the  Terzo Valico dei Giovi project; Voltri interconnection and completion Polcevera, belonging to II, III, IV, V and VI constructive Lots. Contact COCIV, att.ne Ing. Marcos Montevecchi, Genoa, tel +39 01042188791, email rup@cociv.postecert.it. For tender documents click here. 26/19.



Permalink

Pavimental S.p.A. secured the EUR282.54 million contract, excluding VAT, for the assignment of works for the construction of civil, line works and related works AV / AC  on the  Terzo Valico dei Giovi project; Voltri interconnection and completion Polcevera, belonging to II, III, IV, V and VI constructive Lots. Contact COCIV, att.ne Ing. Marcos Montevecchi, Genoa, tel +39 01042188791, email rup@cociv.postecert.it. For bid documents click here. 26/19.



Permalink

Italy, Campania - it/207

Road

Closing Date: 22.10.2013 (Tender Closed)

Open invitation to tender, deadline 22.10.2013, for installation of firefighting equipment in 1,810 m Parco della Reggia tunnel on the SS 7 and 265 bypass between Capua and Maddaloni. Contract value EUR594 264, excluding VAT. Duration of contract 120 days, 30 days of which for design and 90 days for work. Contact Anas, Campania Road department, Bids and contract Office, Naples, tel +39 081 7356111- 229, fax +39 081 621411, 2399679, e-mail NA-GareContr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/59947. Bid code n. NALAV010-13. 38/13.



Permalink

C.O.M.I. Compagnia Meridionale Impianti Srl (Naples) secured the EUR412,310 contract for installation of firefighting equipment in 1,810 m Parco della Reggia tunnel and for construction of the SS7 and 265 bypass between Capua and Maddaloni. Contact Anas, Campania Road department, Bids and contract Office, Naples, tel +39 081 7356111- 229, fax +39 081 621411, 2399679, e-mail NA-GareContr@postacert.stradeanas.it. Visit http://www.gazzettaufficiale.it/atto/contratti/caricaDettaglioAtto/originario;jsessionid=oyxR481vGtWCG06YwtcGQQ__.ntc-as1-guri2a?atto.dataPubblicazioneGazzetta=2014-03-05&atto.codiceRedazionale=T14BGA3356. Bid code n. NALAV010-13. 13/14.



Permalink

Open invitation to tender, deadline 25.02.2015, for extraordinary maintenance of technological equipment in the Parco della Reggia tunnel (1,810 m) on SS 700  for the achievement of energy savings. Value of contract EUR843,215.10, excluding VAT, duration 180 days. Contact Anas SpA, Campania Road departement, Bid & Contract Office, Naples,  tel +39 081 7356111, fax +39 081 621411. Visit http://www.gazzettaufficiale.it/atto/contratti/caricaDettaglioAtto/originario;jsessionid=YQKgEOYuEwo2fTOEbiUfVw__.ntc-as1-guri2a?atto.dataPubblicazioneGazzetta=2014-12-19&atto.codiceRedazionale=T14BFM22077 and http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/68855. Ref.n. NALAV041-14, bid code n. 46MS-14. 06/15.



Permalink

Open invitation to tender, deadline 25.02.2015, for extraordinary maintenance of technological equipment in the San Giuseppe tunnel (1,173 m) on SS 7  for the achievement of energy savings. Value of contract EUR666,748.79, excluding VAT, duration 180 days. Contact Anas SpA, Campania Road departement, Bid & Contract Office, Naples,  tel +39 081 7356111, fax +39 081 621411. Visit http://www.gazzettaufficiale.it/atto/contratti/caricaDettaglioAtto/originario;jsessionid=YQKgEOYuEwo2fTOEbiUfVw__.ntc-as1-guri2a?atto.dataPubblicazioneGazzetta=2014-12-19&atto.codiceRedazionale=T14BFM22077 and http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/68855. Ref.n. NALAV041-14, bid code n. 46MS-14. 06/15.



Permalink

Open invitation to tender, deadline 23.02.2015, for extraordinary maintenance of lighting equipment  and refurbishment of ventilation equipment in 3.2 km-long Limina tunnel, on SS 682 Ionio-Tirreno, in Reggio Calabria province. Contract value EUR4,104,135.80, excluding VAT. Duration of contract 365 days. Contact Anas SpA, Calabria Road Deptt, Bids & Contracts Office, Catanzaro,  tel 39 0961 531011, fax +39 0961 725106, e-mail CZ-GareContr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/69151. Bid Code.n. CZLAV039-14. 06/15.



Permalink

Italy, South Tyrol - it/206

Road

The JV Collini Lavori SpA (Trento)/Ediltione Srl (Tione di Trento - TN), Costruzioni Casarotto Srl (Villa Agnedo - TN), Misconel Srl (Cavalese - TN) and Garbari SpA (Trento), chose EGIS Structures et environnement SA of Guyancourt (F) and Rocksoil SpA of Bergamo for project and secured the EUR23.14 million contract for design and construction of Pieve di Bono (TN) bypass on SS 237 del Caffaro. The new section includes 1 km Castel Romano tunnel (with 55 m in cut/cover) and its 111 m safety tunnel (with 8 m in cut/cover). Contact Provincia Autonoma di Trento, att.n Angela Gueresi, Trento, tel +39 0461 496444, fax +39 0461 496422. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=295490-2013. 38/13.



Permalink


Open invitation to tender, deadline 15/11/2022, for the rectification and adaptation works of the Ponte Pia tunnel between the km 94.576 -km 96.577 sections of the Caffaro SS 237 (Lot 1). The contract involves the enlargement of a 571 m stretch of the existing tunnel and the construction of a new development tunnel of approximately 1102 m with a new entrance. Value of the contract is EUR 34.41 million, excluding VAT. Duration of the contract is 932 days. Contact Provincia autonoma di Trento - Agenzia provinciale per gli appalti e contratti - Servizio appalti, attn dott.ssa Paola Pellegrini, Trento, email serv.appalti@pec.provincia.tn.it.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=528106-2022. Ref.n. AT111106.  40/22. 

Italy-Trento: Road tunnel construction work

2022/S 187-528106

Contract notice

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Provincia autonoma di Trento — Agenzia provinciale per gli appalti e contratti —Servizio appalti
Postal address: Via Dogana n. 8
Town: Trento
NUTS code: ITH20 Trento
Postal code: 38122
Country: Italy
Contact person: dott.ssa Paola Pellegrini
E-mail: serv.appalti@pec.provincia.tn.it
Internet address(es):
Main address: www.appalti.provincia.tn.it
Address of the buyer profile: http://www.appalti.provincia.tn.it
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: www.acquistionline.pat.provincia.tn.it
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted to the abovementioned address
I.4)Type of the contracting authority
Regional or local authority
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

"S 174 - LAVORI DI RETTIFICA E ADEGUAMENTO DELLA GALLERIA "PONTE PIA'" NEL TRATTO COMPRESO TRA LE PROGR. KILOM. 94,576 - 96,577 DELLA S.S. N. 237 DEL CAFFARO - LOTTO 1"

Reference number: AT111106
II.1.2)Main CPV code
45221241 Road tunnel construction work
II.1.3)Type of contract
Works
II.1.4)Short description:

La gara si svolgerà mediante procedura aperta con il criterio di aggiudicazione dell'offerta economicamente più vantaggiosa, con presentazione telematica su sistema SAP-SRM, della documentazione amministrativa, tecnica ed economica ai sensi della l.p. 2/2020, l.p. 2/2016, dell'art. 30bis e dell'art. 30 co. 5 bis della l.p. 26/93 e con le modalità procedurale dell'art. 62 e del titolo IV, capo V del D.P.P. 11 maggio 2012 n. 9/84/LEG e in particolare della Deliberazione di Giunta Provinciale n. 1994 di data 11/11/2016. Si richiama anche la deliberazione di Giunta Provinciale n. 1612 dd. 16/10/2020.

Il progetto prevede la rettifica del tratto compreso tra le progr. KM 94,576 - 96,577 della S.S. n. 237 del Caffaro, mediante l'allargamento di un tratto di 571 m circa di sviluppo della galleria esistente e la realizzazione di una nuova galleria dello sviluppo pari a circa 1102 m con nuovo imbocco.

II.1.5)Estimated total value
Value excluding VAT: 34 414 482.49 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITH20 Trento
Main site or place of performance:

S.S. 237 del Caffaro tra le progressive Km 94,576 - 96,577.

II.2.4)Description of the procurement:

"S 174 - LAVORI DI RETTIFICA E ADEGUAMENTO DELLA GALLERIA "PONTE PIA'" NEL TRATTO COMPRESO TRA LE PROGR. KILOM. 94,576 - 96,577 DELLA S.S. N. 237 DEL CAFFARO - LOTTO 1"

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in days: 932
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: no
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

Importo complessivo di appalto pari a Euro 34.414.482,49 così suddiviso:

a) Euro 33.606.482,49 per lavorazioni soggetti a ribasso;

b) Euro 808.000,00 per oneri della sicurezza non soggetti a ribasso d'asta.

Categoria prevalente OG4. Categorie scorporabili a qualificazione obbligatoria: OG3; OS21, OS12-B e categoria a qualificazione obbligatoria SIOS: OG11.

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
List and brief description of conditions:

Si rimanda al bando integrale di gara.

III.1.2)Economic and financial standing
Selection criteria as stated in the procurement documents
III.1.3)Technical and professional ability
Selection criteria as stated in the procurement documents

Section IV: Procedure

IV.1)Description
IV.1.1)Type of procedure
Open procedure
IV.1.3)Information about a framework agreement or a dynamic purchasing system
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes
IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 15/11/2022
Local time: 12:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Italian
IV.2.6)Minimum time frame during which the tenderer must maintain the tender
Duration in months: 9 (from the date stated for receipt of tender)
IV.2.7)Conditions for opening of tenders
Date: 17/11/2022
Local time: 09:30
Place:

Presso la sala Aste del Servizio Appalti - APAC via Dogana n. 8 - Trento - Italy.

Information about authorised persons and opening procedure:

Ogni concorrente ha facoltà di assistere alla seduta collegandosi da remoto alla piattaforma di videoconferenza "Liifesize" tramite la propria apperracchiatura informatica. A tal fine sono fornite indicazioni nel documento "Istruzioni operative seduta virtuale" allegato al bando integrale di gara e reperibile all'interno della piattaforma SAP-SRM.

Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.3)Additional information:

Codice CIG 9417539F05.

La procedura di gara è soggetta ad AVCPASS.

E' prevista la nomina della Commissione Tecnica per l'esame delle offerte tecniche.

La procedura si svolge in modalità telematica attraverso la piattaforma SAP SRM V7, accessibile a questo indirizzo: http://www.acquistionline.pat.provincia.tn.it, previa registrazione.

La documentazione integrale di gara è disponibile all’interno dell’ambiente di gara sul Sistema sap-srm V7.

La determina a contrarre, il bando UE, il bando integrale di gara, il Capitolato Speciale d’Appalto, l’elaborato “Parametri e criteri di valutazione delle offerte”, sono rinvenibili anche sul sito internet: htt://www.appalti.provincia.tn.it. che rinvia tramite collegamento ipertestuale al sistema informativo contratti della Provincia autonoma di Trento “SICOPAT”.

L’appalto in oggetto costituisce un lotto all’interno di un progetto complessivo pari a Euro 34.414.482,90.-

Per ogni ulteriore informazione si rinvia al bando integrale di gara.



Permalink


The Consortium P.A.C. SpA from Bolzano (leader) , S.I.E.I.-Società Impianti Elettrici Industriali Srl from Quinto Vicentino (Vicenza) e Bouygues E&S Italia SpA from Milan have secured the EUR 34.41 million contract, excluding VAT, for the rectification and adaptation works of the Ponte Pia tunnel between the km 94.576 -km 96.577 sections of the Caffaro SS 237 (Lot 1). The contract involves the expansion of a 571 m stretch of the existing tunnel and the construction of a new tunnel of approximately 1102 m with a new entrance. Works will start at the end of summer-beginning of Autumn with a three year duration. Contact Provincia autonoma di Trento - Agenzia provinciale per gli appalti e contratti - Servizio appalti, attn dott.ssa Paola Pellegrini, Trento, email serv.appalti@pec.provincia.tn.it.  Visit https://www.ufficiostampa.provincia.tn.it. Ref.n. AT111106.  34/23. 

 




Permalink


The Joint Venture P.A.C. SpA  from Bolzano, S.I.E.I. Srl from Quinto Vicentino and Bouygues E&S Italia SpA  from Milan secured the EUR32.37 million contract, excluding VAT, for the rectification and adaptation works of the Ponte Pia tunnel between the km 94.576 -km 96.577 sections of the Caffaro SS 237 (Lot 1). The contract involves the enlarging of a 571 m stretch of the existing tunnel and the construction of a new tunnel of approximately 1102 m with a new entrance. Contact Provincia autonoma di Trento - Agenzia provinciale per gli appalti e contratti - Servizio appalti, Trento, email serv.appalti@pec.provincia.tn.it.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=620560-2023. Ref.n. AT111106.  41/23.  



Permalink

Italy, Abruzzo - it/205

Road

Ricci Guido Srl of Castel di Sangro (AQ) secured the EUR1,168,082 contract for the structural refurbishment of the Le Piane (1,919 m ) and San Silvestro (3,623 m) tunnels on SS 174 Pescara Ring Road. Contact Anas Spa, Road Department for Abruzzo, Bid and Contract Office, L’Aquila, tel +39 0862 305101, fax +39 0862 305260, e-mail aq-garecontr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/60125. Bid Code n. 30/2013. 42/13.



Permalink

Open invitation to tender, deadline 07.04.2014, for the EUR826,609.21 contract for restoration of technical systems in Le Piane (1,919 m ), San Silvestro (3,623 m) and I Pianacci (1,823 m) tunnels on SS 174 Pescara Ring Road. Duration of contract 95 days. Contact Anas Spa, Road Department for Abruzzo, Bid and Contract Office, L’Aquila, tel +39 0862 305101, fax +39 0862 305260, e-mail aq-garecontr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/59475. Bid Code n. AQLAV002-14. 13/14.



Permalink


Open invitation to tender, deadline 01/02/2023, for scheduled maintenance of painting work for the technical and functional improvement of safety conditions in road traffic tunnels along the SS 17 of the Abruzzo Apennines from km101+300 to km151+035. For tender documents click here, where tenders must be sent. Value of the contract is EUR1.47 million, excluding VAT.  Duration of the contract is 180 days. Contact Anas Spa, attn Eng. Bosio, L’Aquila, email anas.abruzzo@postacert.stradeanas.it.  Visit https://www.stradeanas.it/it/appalti/rilevanza_comunitaria.  Bid n. AQLAV014-22. 01/23

 




Permalink