On 29.04.2013 breakthrough was achieved on the right tube of Vilavella tunnel on the 3.8 km-long Tunnel de la Canda-Vilavella sub-section of the Madrid-Galicia high-speed line. Driven using NATM techniques, the 902 m-long right tube has a 52 sq m inner section. The 99 m-long and 69 m-long portal sections were constructed in cut/cover. The breakthrough in the left tube, 869 m-long with the two portal sections 78 m and 69 m in cut/cover, occurred on 12.04.2013. Click es/45 for tunnelbuilder archive. Visit www.adif.es. 18/13.
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil