On 29.04.2013 breakthrough was achieved on the right tube of Vilavella tunnel on the 3.8 km-long Tunnel de la Canda-Vilavella sub-section of the Madrid-Galicia high-speed line. Driven using NATM techniques, the 902 m-long right tube has a 52 sq m inner section. The 99 m-long and 69 m-long portal sections were constructed in cut/cover. The breakthrough in the left tube, 869 m-long with the two portal sections 78 m and 69 m in cut/cover, occurred on 12.04.2013. Click es/45 for tunnelbuilder archive. Visit www.adif.es. 18/13.
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 Germany
07.04.2025 France
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Switzerland
11.04.2025 Italy
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
23.04.2025 Germany
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
28.04.2025 Austria
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
16.05.2025 Italy
27.06.2025 Switzerland