The first of three 5.23 m-diameter Robbins Main Beam TBMs has holed on the 44.6 km-long Pahang Selangor water transfer tunnel in Malaysia. Read the press release and visit tunnelbuilder archive my/17 and www.robbinstbm.com. 17/13.
27.11.2025 Spain
27.11.2025 Switzerland
09.12.2025 Switzerland
09.12.2025 Italy
09.12.2025 Belgium
16.12.2025 Iceland
17.12.2025 Italy
06.01.2026 France
23.01.2026 Switzerland