At the beginning of January 2022 L&T completed the 2072 m long tunnel from Priyadarshini Park to Girgaon Chowpatty/Girgaum Chowpatty/Girgaon Chaupty. It’s the first breakthrough for the slurry shield TBM Mavala (12.19 m diameter) for the Mumbai’s 29.2 km Coastal Road (Western Freeway) project, Package-4. The TBM has excavated for over a year through challenging geological conditions and under structures of historical and cultural importance. Lombardi Engineering Ltd provided detailed design of tunnels and other underground civil works, E&M and ventilation works for L&T for this project. Click here and in/59 for the tunnelbuilder archive and for further information please visit https://portal.mcgm.gov.in/irj/portal/anonymous/qlcoastal1, http://www.larsentoubro.com and https://www.lombardi.ch/en-gb/home. 04/22.
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Italy
11.04.2025 Switzerland
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
27.06.2025 Switzerland