Both 12.4 m-diameter TBMs excavating the Legacy Way tunnels from Toowong to Kelvin Grove in Brisbane, Australia have now holed out some two months ahead of schedule. Read the press release and visit www.legacyway.com.au. 26/13.
09.03.2026 Italy
11.03.2026 Italy
19.03.2026 Bulgaria
20.03.2026 Italy
23.03.2026 France
24.03.2026 Italy
30.03.2026 Italy
31.03.2026 Ireland
09.04.2026 Germany
23.04.2026 Sweden
24.04.2026 United Kingdom
30.04.2026 Sweden
30.04.2026 Switzerland
04.05.2026 Switzerland
04.06.2026 Switzerland