Both Forrestfield TBMs are now up and running again and on their way to Redcliffe Station, where they are expected to break through in the coming months. While at Redcliffe the TBMs Grace and Sandy will be fitted with new screw conveyors, manufactured by Herrenknecht. Click here and au/34 for the tunnelbuilder archive. Also visit https://www.forrestfieldairportlink.wa.gov.au/. 16/19.
13.11.2025 France
13.11.2025 Germany
13.11.2025 Switzerland
17.11.2025 Romania
20.11.2025 Romania
21.11.2025 Switzerland
21.11.2025 Austria
27.11.2025 Spain
27.11.2025 Switzerland
09.12.2025 Switzerland
09.12.2025 Belgium
09.12.2025 Italy