On the 1st of July, Hassan Allam Construction celebrated the first successful TBM breakthrough for the Greater Cairo Metro Line 4 Project-Phase 1 from Station 6 to Station 7. Click here for the video of the break through and click here and eg/17 for further information in the tunnelbuilder archive and visit https://www.hassanallam.com/ and https://www.arabcont.com/ . 27/24.
19.09.2025 Norway
22.09.2025 Netherlands
26.09.2025 Poland
29.09.2025 Germany
03.10.2025 Netherlands
06.10.2025 Spain
07.10.2025 Germany
09.10.2025 Germany
09.10.2025 Switzerland
10.10.2025 Spain
10.10.2025 Norway
13.10.2025 Switzerland
15.10.2025 France
10.11.2025 Bosnia and Herzegovina