On the 1st of July, Hassan Allam Construction celebrated the first successful TBM breakthrough for the Greater Cairo Metro Line 4 Project-Phase 1 from Station 6 to Station 7. Click here for the video of the break through and click here and eg/17 for further information in the tunnelbuilder archive and visit https://www.hassanallam.com/ and https://www.arabcont.com/ . 27/24.
06.01.2026 France
12.01.2026 Austria
14.01.2026 Netherlands
15.01.2026 Spain
20.01.2026 Romania
23.01.2026 Switzerland
23.01.2026 Ireland
26.01.2026 Italy
26.01.2026 Germany
29.01.2026 Bosnia and Herzegovina
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway