The first TBM of contracting JV BAM Nuttall/Ferrovial Agroman/Kier has reached Paddington, some 750 m from its launch chamber at Royal Oak. To reach its first goal on the western Crossrail tunnels, the TBM had to successfully navigate beneath both the Hammersmith and City line and the Great Western main railway line. It will now traverse the Paddington station box and drive onwards to Bond Street, Tottenham Court Road and then Farringdon. A second similar TBM recently launched from Royal Oak on the parallel tube to Paddington. Excavated material is being railed to Northfleet, Kent from where it will be shipped to Wallasea Island, Essex to help the RSPB create a nature reserve.
Another two TBMs are under erection near Canning Town station to drive the eastern tunnels between Docklands and Farringdon. More from www.crossrail.co.uk and visit tunnelbuilder archive uk/40. 34/12.
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Italy
11.04.2025 Switzerland
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
27.06.2025 Switzerland