Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Corga de Vela excavation complete

20/06/2013
On 13.06.2013 Adif completed the drilling of the Corga de Vela railway tunnel. The 1,170 m bi-tube mono track tunnel is in the Prado-Porto subsection of Ourense province on the Madrid-Galicia high-speed line. The portal sections will be in cut/cover for environmental integration. The section is 52 sq m. The tunnel will be lined with concrete segments, thickness minimum 30 cm. The two tubes will be connected with crosspassages at 400 m intervals. Click es/45 for tunnelbuilder archive. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/50B394BDA1320E8BC1257B89002FB8DD?Opendocument. 25/13.



NEED QUALIFIED PERSONNEL?