Gateway Development Commission (GDC) has awarded to Schiavone, Dragados Lane Joint Venture the EUR425.02 million (USD465.6 million) contract for construction of the twin-tube 1.55 km ( 5,100-feet) long Palisades tunnel. The tunnel has an inside diameter of 7.68 m (25.2 feet) and six cross passages. The tunnels will be excavated by 2 hard rock TBMs with excavation commencing at the tunnel portal at the Tonnelle Avenue construction site and mining eastward into the Hudson County Shaft. Construction Duration: Summer 2024 – Spring 2027. For further information click here https://www.gatewayprogram.org/wp-content/uploads/2024/08/GDC-Public-Presentation-for-8-1-24-fin.pdfand visit https://www.gatewayprogram.org/. Ref.n. GDC-24-006-HTP. 31/24.