The awarding procedure, deadline 05.08.2016, for the Cekmekoy-Sancaktepe-Sultanbeyli and Sarıgazi (Hospital)-Tasdelen-Yenidogan Subway Lines for construction and E&M systems procurement also includes installation and commissioning works, has been discontinued. The total length of the tunnel will be 17.8 km with 14 Stations and is on Istanbul’s Asian side. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, att.n Feriha Mert, Director of Asian Side Rail Systems, Istanbul, tel +90 2123126515, fax +90 2124554373, e-mail feriha.mert@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=278235-2016. Ref.n. 2016/252601. 32/16.