IG BSSJ plus from Aar secured the EUR86,586.40 (CHF913'480.66), excluding VAT, contract for the specific planning services for the preliminary project, which is for the revision of the Kannenfeld (1001 m ) and Schützenmatt (286 m) railway tunnels to the 4 m profile on the Basel St.Johann-Basel SBB section. For further information click here (German). Contact Schweizerische Bundesbahnen SBB Infrastruktur, attn Thomas Holthuisen, Olten, email thomas.holthuisen@sbb.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=003946-2020. Ref.n. 1155851. 02/20.