Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Switzerland

Switzerland, Zurich-Thalwil - ch/13

Railway


PG ZBT2+ c/o AFRY Schweiz AG from Zurich have secured the CHF4.36 million contract, excluding VAT, for general management and coordination of technical services - Pre-project phase – for the Zimmerberg 2 base tunnel, Nidelbad-Litti. The contract includes the Nidelbad widening work, the ZBT2 tunnel system with two 10.8km single-track tunnels and the cross connections, as well as the Litti connection with the tunnel portals, the connection to the existing track network and the turnaround facility. For further information http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR= 1266931.Contact Schweizerische Bundesbahnen SBB Infrastruktur, attn Benjamin Karli, Olten, email benjamin.karli@sbb.ch. Visit https://ted.europa.eu/en/notice/-/detail/317022-2022. Ref.n. 1161142. 24/22.



Permalink