Open invitation to tender, deadline 16/05/2025, for a General Contractor to be in charge of tunnel construction and civil engineering works as part of the MehrSpur Zurich – Winterthur project part 240:
The core of the project is the approximately 8.3 km long Bruttener Tunnel with two single-track tubes connected every 500 m by 20 bypasses and the approximately 1 km long branch line from Bassersdorf to Zurich Airport. The tunnel will be accessed from the north via Dietlikon station and from the east via Bassersdorf station. The tunnel will be exited before Winterthur, in Tossmuehle, via the portal across the Kempt River. For further information on the project click here and on the tender, click here. Duration of contract from 01/06/2026 to 30/11/2034. Contact SBB, Zurich, email einkauf.bauprojekte.ost@sbb.ch. Visit https://ted.europa.eu/en/notice/-/detail/708895-2024. 48/24.