FCC Construccion SA secured the EUR13.1 million contract for the connection of the start of the Arguis-Alto de Monrepos section on autovia Mudejar A23 with the Tunnel Control Centre, and for the equipment upgrading of the 1.5 km-long Alto Aragon n.1 tunnel. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax +34 915978547, e-mail jgcid@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399917-2013. Ref. n. 12-HU-5711. 49/13.