The Tuneles Lleida Joint Venture composed of Fulcrum, Planificacio, Analisis y Proyecto SAU and Tuneles Geomecanica SL secured the EUR1.85 million contract, excluding VAT, for adaptation of 6 tunnels, 16 overpasses, and the catenary of the Zaragoza–Tarragona railway line via Lleida to adapt them to the dimensions of the P-400 semi-trailers. Contact Adif, Madrid, tel +34 913007661, email comprascontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/285112-2025.
Ref.n. 3.24/27507.0123. 18/25.