Open invitation to tender, deadline 22nd September, 2008 for construction of the La Aldea de San Nicolas-El Risco section on the Agaete-La Aldea de San Nicolas road link in Isle of Gran Canaria. This nearly 10.4 km road section includes a 2,339 m twin tunnel, two single tube bidirectional tunnels with three lanes, 518 m and 603 m in length, and a 87 m cut-and-cover tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195043-2008, OJ S 145, or contact Canarian government, Las Palmas de Gran Canaria, fax +34 928307020 or 928455356. 32-33/08.