Open invitation to tender, deadline 16/06/2025, for the construction of the 7.9km Valle del Genil section, part of the 19 km Loja Bypass on the Antequera–Granada high-speed line. The Valle del Genil section includes the Cerro de los Limones tunnel (1,295 m), the longest in the Loja Bypass, and two viaducts measuring 794 m and 693 m. The Loja Bypass will reduce travel times on rail connections to Granada, thanks to a new double-track and high-speed alignment. Click here for bid documents and here where tenders must be sent. Value of contract EUR 281.91 million, excluding VAT. Duration of contract 36 months. Contact Adif AltaVelocidad, Madrid, tel +34 917744804, emailcomprascontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/239218-2025 and https://www.adifaltavelocidad.es. Ref.n. 3.25/20830.0030. 16/25.