The consortium SZ-Zeleznisko gradbeno podjeno dd, Kolektor IGIN doo, GH Holding doo and YM Construction doo secured the EUR 203,800,754.29 contract, excluding VAT, for the implementation of railway and tunnel systems on the second track Divaca – Koper (Package 3). The contract covers the implementation of tracks and track devices, rolling stock, telecommunications devices, video and security systems, installation of hardware and electrical equipment, power supply, etc. Contact 2TDK, attn Matija Lepsa, Lubiana, tel +386 13068400, email matija.lepsa@2-tdk.si. Visit https://drugitir.si/ and https://ted.europa.eu/en/notice/-/detail/531173-2023. Ref.n. JN-5/2023. 37/23.