Proposed 13 km-long railway between Rosenholm and Ski will require 6+ km of tunnels, longest of which will be 4 km and 1.5 km. Tenders for engineering design expected mid-2001 for construction start in 2005. Visit www.jernbaneverket.no/prosjekter 03/01.