Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Molde - no/241

Undersea tunnels

Prior information notice for works directive  2014/24/EU  - 2017/S 212-441608. The county road 659 Nordøyvegen, is a mainland connection that will connect the Nordøy islands in Sunnmøre to the mainland, via undersea tunnels and bridges. Nordøyvegen will give a ferry free road connection to Lepsøya, Haramsøya, Skuløya/Flemsøya and Fjørtofta in Haram municipality and Harøya in Sandøy municipality in Møre og Romsdal. The contracting authority is Statens vegvesen for further information call  Torbjørn Vatnehol on  +47 97714119 or e-mail: torbjorn.vatnehol@vegvesen.no  or Arild Fuglseth at  Møre og Romsdal Fylkeskommune  email post@mrfylke.no

https://www.vegvesen.no/Fylkesveg/fv659nordoyvegen

Address of the buyer profile: https://kgv.doffin.no/ctm/Company/CompanyInformation/Index/1111

The Skjeltene — Harøya contract consists of the following main elements;

— Lepsøy bridge, 800 m long high bridge from Skjeltene on the mainland over the shipping lane to the sea filling by Lauka and Hestøya.

 The bridge is being announced with two main alternatives; concrete cantilevered bridge and a concrete bridge with a steel box in the superstructure.

— Lauke bridge, 109 m long concrete slab bridge with 3 spans.

— Hamnaskjersund bridge, 200 m long concrete slab bridge with 7 spans.

— Haramsfjordt tunnel, from Hestøya to Austnes. Length 3 500 m, bottom point contour line -112

— Dam and temporary cofferdam at the tunnel entrance at Hestøya

— Nogvafjord tunnel, from Longva on Flemsøya to Fjørtofta. Length 5 730 m, bottom point contour line — 135

— Fjørtoftfjord tunnel, from Fjørtoft to Harøya. Length 3 680 m, bottom point contour line -118

— Burberg tunnel, environment tunnel at Fjørtofta. Length 170 m, of which approx. 60 m is rock and approx. 90 m is concrete

— Road on a sea filling over Lepsøyrevet, total length 2 735 m.

— Open air road not on the sea filling, total length 10 000 m

— Conduits and preparatory electro work along the entire stretch.

For further information click here http://ted.europa.eu/udl?uri=TED:NOTICE:441608-2017:TEXT:EN:HTML&src=0&tabId=1b .45/17.



Permalink