Negotiated procedure, deadline 10.12.2013, for Lorenbanen U2 substructure contract including operating and securing 2 x 200 m-long rock tunnel including water and possible frost protection and expansion of existing tunnel for junction tracks; water and frost protection in station hall, stairways and 2 x 200 m of excavated rock tunnel; and other substructure works. Estimated construction period one year, part of which during nine-month train stoppage from 23.06.2014. Contact Sporveien Oslo AS, att.n Ole Kvale, tel +47 22084000, e-mail ole.kvale@sporveien.no. To register interest in this notice and obtain any additional information visit http://www.doffin.no/Search/Search_Switch.aspx?ID=310305. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=384053-2013. 46/13.