Negotiated procedure, deadline 27.12.2012, for services of three engineer geologists from summer 2013 for 1.5-2.0 years to follow up tunnel works. Loren Track-U1-Substructure contract includes, amongst other things, driving and securing a rock tunnel with a station hall for Loren station (470 m-long two track tunnel, 2 x 450 m-long one track tunnel), access tunnel and two shafts to the underground station; 200 m-long concrete tunnel; water and frost protection; and the substructure on half of the stretch of the rock tunnel. Contact Kollektivtransportproduksjon AS, att.n Ole Kvale, Oslo, tel +47 22084000, e-mail ole.kvale@ktpas.no. To register interest in this notice and obtain any additional information visit http://www.doffin.no/Search/Search_Switch.aspx?ID=272760. Documents available for downloading at http://anbud.ktpas.no NT Ref: 273847. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=376030-2012. 48/12.