Notice for Expression of Interest, deadline 21.08.2016, for the Construction Supervision and Contract Management of about 24 km of length of access road starting from Gola (proposed powerhouse site of the Project, near Barun Bazar) to Chepuwa (proposed dam site) includes about a 1.7 km long road tunnel and two bridges over Arun River (one at Gola for 335MW Upper Arun Hydroelectric Project and another at Uwa Gaun for 30MW Ikhuwa Khola Project) from the nearest point of Koshi Highway under construction and other civil works. The estimated time of the entire service is about 64 calendar months: 22 months for Phase I and 42 months for Phase II.
The shortlisted Consultants shall prepare separate technical proposal for Phase I and Phase II and shall be submitted separately during RFP (Request for Proposal) so that the contract can be signed for phase wise services on the basis of separate financial proposals. Contact Nepal Electricity Authority, Upper Arun Hydroelectric Project, Durbar Marg, Kathmandu, tel +977-1- 4153039, fax +977-1- 4153040, e-mail upperarun@nea.org.np. Visit http://www.nea.org.np. Ref.n. UAHEP/AR/QCBS-3. 32/16.
For the EOI please contact sam@tunnelbuilder.com