Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Campania - it/108

Road

Accelerated restricted procedure, deadline 15th September, 2004 for construction of a bypass to road SS 212 between Pietrelcina connection and San Marco dei Cavoti Interchange in Benevento province, Campania region. Includes four single bored two-way tunnels in Cerzone (955 m), San Pietro (285.5 m), Fuciello (568 m) and Monteleone (1,421 m) and two single-tube cut-and-cover tunnels in Regio Tratturo (1,450 m) and Toppo Tre Valloni (396 m). Carriageway width: 10.5 m for two lanes. The bored tunnels are to be built in clay. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123882-2004, OJ S 144, or contact ANAS, Rome, fax +39 064454956. Visit www.stradeanas.it 35/04.Accelerated restricted procedure, deadline 22nd December, 2004 for construction of the Cascano ring road (1.6 km), including a 1 km tunnel approximately. It is a dual-lane two-way tunnel, carriageway width 7.5 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194836-2004, OJ S 226, or contact ANAS, Rome, fax +39 064454956. 51-52/04.Consorzio Ravennate, Uniland Scarl and Rillo Costruzioni secured a EUR126.6 million contract to build a road bypass to the SS 212 between Pietrelcina junction and San Marco dei Cavoti interchange in Benevento province, Campania region. This 41.3 km project includes four bidirectional single bored tunnels in Cerzone (955 m), San Pietro (285.5 m), Fuciello (568 m) and Monteleone (1,421 m) and two single-tube cut-and-cover tunnels in Regio Tratturo (1,450 m) and Toppo Tre Valloni (396 m). The carriageway width is 10.5 m for two lanes. The bored tunnels are to be built in clay. Visit www.consrav.net 33-34/05.



Permalink