Indra secured the contract, worth 6.5 million euros with a duration of 12 months. This is for the design, supply, set-up and rollout of a control system for the 9.2 km Chenani-Nashri tunnel or Patnitop Tunnel. It is situated on the two-lane NH1A highway linking Jammu to Srinagar, in the northern states of Jammu and Kashmir, it is the longest in Southeast Asia. They will build a centralized integrated management solution for the various intelligent traffic systems (ITS) that will be deployed in the tunnel and have guaranteed compliance with quality and security standards. The project includes implementation of the automatic incident detection, video surveillance, traffic control, signaling, fire detection, access control and emergency call systems, and also the ability to integrate other sub-systems supplied by local companies, such as the lighting, ventilation, communication and energy systems. Visit http://www.indracompany.com. 53/15.