Postponed to 10.08.2017 the deadline for an expression of interest for pre-qualification purposes (Stage A) for the General Final Design (GFD) and the Detailed Final Design (DFD), as well as the construction and commissioning of Section A of Alsos Veikou – Goudi, for the the Athens Metro Line 4, (13 km with 14 stations). In addition, the project will include the supply of Rolling Stock, as well as the construction of an Operations Control Centre i twill include Train Maintenance and Building Repair at the Sepolia Depot. Contact Attiko Metro AE, Atene, tel +30 2106792473, fax +30 2106726126, email ksaiti@ametro.gr. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=223942-2017, http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=262099-2017 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=297781-2017. Ref.n. RFP_308_17. 31/17.