The JV BOL/Bíœ Stuttgart 21 PFA 2.2, composed by Ing.-Büro Dipl.-Ing. Vössing GmbH (Düsseldorf) and CDM Consult GmbH (Bochum) secured the contract for site supervision services during the construction of the Stuttgart 21/NBS Wendlingen-Ulm section (NBS, PA 2.2) including two tunnels lengths about 8,790 m and 4,825 m consisting of two single-track tubes and 200 m in open cut. Contact Michael Frahm at DB ProjektBau GmbH in Stuttgart, tel +49 71193319-366, e-mail michael.frahm@dbnetze.com. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=008992-2010. 06/10.