JV INEO/Axima/Clemessy (Aix-en-Provence) secured the EUR19.3 million contract, VAT not included, for installation of electrical wiring, ventilation, lighting, control, safety and signaling equipment in south tube of Toulon subterranean highway linking A50 and A57.Contact PSI/UCPAR in Marseille, tel +33 4912843-36, fax-66, e-mail marchespublics.dreal-paca@developpement-durable.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=381648-2011. 50/11