Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

France

France, Rhone-Alps - fr/11

High Speed Railway

Closing Date: 28.05.2019 (Tender Closed)

Additional information on the negotiated invitation to tender, deadline 28.05.2019, for the construction of the base tunnel of the Lyon-Turin Railway Link Cross-border Section from the French Side - Operational Worksites 5, 6/7 and 8. The contract is composed of 3 lots:-

• Lot 1, Work site n.5 (base tunnel excavation from Villarodin-Bourget/Modane decline), value EUR1bn, excluding VAT, duration 102 months;

• Lot 2, Work site n.6/7 (base tunnel excavation from  La Praz and Saint-Martin-la-Porte declines), value EUR1.13bn, excluding VAT, duration 98 months;

• Lot 3, Work site n.8 (base tunnel excavation from Villard-Clement gates), value EUR180 million, excluding VAT, duration 98 months.

For further information https://telt.achatpublic.com/accueil/  where offers must be sent. Contact TELT sas, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. For bid documents click here and here. Ref.n. T7. 13/19.



Permalink