Negotiated invitation to tender, deadline 28.05.2019, for
the construction of the base tunnel of the Lyon-Turin Railway Link Cross-border
Section from the French Side — Operational Worksites 5, 6/7 and 8. The contract
is composed of 3 lots.
• Lot 1,
Work site n.5 (base tunnel excavation from Villarodin-Bourget/Modane decline),
value EUR1bn, excluding VAT, duration 102 months;
• Lot 2,
Work site n.6/7 (base tunnel excavation from
La Praz and Saint-Martin-la-Porte declines), value EUR1.13bn, excluding
VAT, duration 98 months;
• Lot 3,
Work site n.8 (base tunnel excavation from Villard-Clement gates), value EUR180
million, excluding VAT, duration 98 months.
For further information https://telt.achatpublic.com/accueil/ where offers must be sent.
In accordance with article R.2185-1 of the Public
Procurement Code (former article 98 of Decree n. 2016-360), candidates and
bidders are reminded that the tender can be withdrawn, at any moment of the
procedure, up until the signing of the contract. In this case, bidders do not
have any right to sign the contract, or to be reimbursed for the expenses they
incurred as part of their application. The tender can be withdrawn by the
Contracting Entity because of economic, legal, or technical reasons, or following
a decision of the 2 States. Contact TELT sas, Le Bourget du Lac, tel +33
479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. For bid documents click here, here and here. Ref.n. T7. 11/19.