Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

France

France, Rhone-Alps - fr/11

High Speed Railway

Closing Date: 28.05.2019 (Tender Closed)

Negotiated invitation to tender, deadline 28.05.2019, for the construction of the base tunnel of the Lyon-Turin Railway Link Cross-border Section from the French Side — Operational Worksites 5, 6/7 and 8. The contract is composed of 3 lots.

             Lot 1, Work site n.5 (base tunnel excavation from Villarodin-Bourget/Modane decline), value EUR1bn, excluding VAT, duration 102 months;

             Lot 2, Work site n.6/7 (base tunnel excavation from  La Praz and Saint-Martin-la-Porte declines), value EUR1.13bn, excluding VAT, duration 98 months;

             Lot 3, Work site n.8 (base tunnel excavation from Villard-Clement gates), value EUR180 million, excluding VAT, duration 98 months.

For further information https://telt.achatpublic.com/accueil/  where offers must be sent.

In accordance with article R.2185-1 of the Public Procurement Code (former article 98 of Decree n. 2016-360), candidates and bidders are reminded that the tender can be withdrawn, at any moment of the procedure, up until the signing of the contract. In this case, bidders do not have any right to sign the contract, or to be reimbursed for the expenses they incurred as part of their application. The tender can be withdrawn by the Contracting Entity because of economic, legal, or technical reasons, or following a decision of the 2 States. Contact TELT sas, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. For bid documents click here, here and here. Ref.n. T7. 11/19.



Permalink