Request for Qualifications, deadline 15/04/2020, for the Eglinton Crosstown West Extension tunnel. The Advance Tunnel contract involves:
• Tunnelling works for approximately 6 km of the 9.2-km light rail transit extension
• Design and construction of launch and extraction shafts, tunnels, as well as headwalls for emergency exit buildings and stations
• Supply tunnel boring machines (TBMs) and install segmental precast concrete tunnel liners
• Activities necessary to build the tunnel (e.g. utility relocations, supports for shaft and headwalls, temporary power supply, lighting, ventilation, and drainage).
Question acceptance deadline: 01/04/2020. Contact Infrastructure Ontario, attn Zuhal Darawal, tel 416-805-3946, email zuhal.darawal@infrastructureontario.ca. For tender information please click here
https://www.merx4.merx.com/public/solicitations/1286100371/abstract.
Ref.n. 0000172311. 11/20.