Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Styria & Carinthia - at/42

High Speed Railway

JV Wayss & Freytag Ingenieurbau AG/Bauunternehmung Granit Gesellschaft m.b.H secured construction of lot KAT1 of the Koralm tunnel on the Graz-Klagenfurt high speed line. This is the first lot for the Koralm tunnel, including 2 x 2 km of mined tunnels to be built in NATM in mixed face conditions using explosives and excavator or roadheader, and 2 x 300 m of cut-and-cover tunnels and sections at grade. The diameter of the tunnels is 10 m. The geology is Tertiary sediments comprising silty sands, clay, silt, and sandstones. Visit www.wf-ingbau.de, www.granit-bau.at and http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=038849-2009, OJ S 27, or contact í–BB Infrastruktur Bau, Vienna, e-mail markus.reiterer@bau.oebb.at. 21/09.



Permalink