Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Land of Salzburg - at/23

Highway

6.4 km existing tube to be dualled under contract to be issued in 2001 following disastrous fire in first tube which killed 12 people on 29th May, 1999. Repairs underway. August 1999. Project management of second tube awarded by OSAG to Intergeo/Kermer engineering consortium who will act as independent reviewer checking design, tender and execution, together with plausibility of procedures and conformance with relevant standards, regulations and instructions. Updating of existing design carried out by Geoconsult. Visit www.geoconsult.at August 2000.Preinformation notice for construction supervision of the second tube of the Tauern tunnel (6.4 km). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=068251-2003, OJ S 77, or contact í–SAG, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at and visit www.asfinag.at 17/03.Preinformation notice for construction supervision for the second tube of the Tauern tunnel (6.4 km) on the Tauern motorway A10. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=222103-2003, OJ S 249, or contact í–SAG, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at. Visit www.asfinag.at 02/04.Restricted call for tenders, deadline 14th December, 2004 for construction supervision for the second tube of the 6.4 km Tauern tunnel on highway A10. Work to begin in April 2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=188810-2004, OJ S 219, or contact Asfinag, Vienna, fax +43 15313414420. E-mail office.wien@asfinag.at 47/04.Restricted procedure, deadline 19th January, 2005 for construction supervision for the electrical and mechanical equipment of the second bores of the Katschberg and Tauern tunnels, 5.8 km and 6.4 km respectively, as well as renovation of the first bores. Estimated cost for electrical and mechanical equipment: EUR55 million. Contract running from May 2005 to 2011. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=205152-2004, OJ S 238, or contact Osterreichische Autobahnen- und Schnellstrassen, Vienna, fax +43 15313414420. E-mail office.wien@asfinag.at 51-52/04.Restricted procedure, deadline 14th November, 2005 for work inspection during the construction phase of the 6.4 km second tube of the Tauern tunnel on highway A 10 Tauern, including the rehabilitation of the existing tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=195562-2005, OJ S 198, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 43/05.Open call for tenders, deadline 8th February, 2006 for construction of the second tube of the Tauern tunnel on highway A 10. Total length is 6,545 m, whereof 6,244 m mined. Cross section: 88 to 107 sq m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=230806-2005, OJ S 234, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 50-51/05.Restricted procedure, deadline 18th January, 2006 for geotechnical measurements, control measurements and scanning of documents during construction of the second tube (6,546 m) of the Tauern tunnel on highway A 10. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=236930-2005, OJ S 240, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 52/05-01/06.Restricted procedure, deadline 18th January, 2006 for the structural tunnel designs for the second Tauern tunnel (6,546 m) and preparation of the tender and design for the rehabilitation of the existing tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=237999-2005, OJ S 241, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 52/05-01/06.Restricted procedure, deadline 18th January, 2006 for geological engineering during and after tunnelling of the second Tauern tunnel (6,546 m) on highway A 10. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=237996-2005, OJ S 241, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 02/06.Open call for tenders, deadline for 9th January, 2007 for process instrumentation for the second tube of the Katschberg and Tauern tunnels. Both the 5,565 m-long Katschberg and the 6,546 m-long Tauern tunnels are on highway A 10. The bored part of the Tauern tunnel is 6,392 m long. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=229272-2006, OJ S 214, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 47/06.Open invitation to tender, deadline 17th June, 2008 for supply and assembly of the tunnel ventilation plant for the Salzburg-bound and the Villach-bound tubes (2 x 6,400 m) of the Tauern tunnel on the Tauern motorway A10. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=112428-2008, OJ S 83, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 20/08.IDS bagged a EUR1.5 million contract related to the new Tauern tunnel, the old Tauern tunnel and the operation centre in Salzburg. The main job is for site management and to be in contact with the companies, who offer the safety equipment for both tubes (ventilation, power supply, emergency power supply, fire detection, air quality measurement systems, lighting, control systems, etc.). All these different systems have to be monitored during installation in respect to their function, costs and time. Also cost and time control as well as status reports are included in the contract. The operation centre in Salzburg is the main point for all incoming information from all tunnels in the area. Visit www.ids.or.at 22/08.



Permalink