Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Brenner - at/16

High Speed Railway

Dibit Messtechnik GmbH in Innsbruck secured the EUR6.63 million contract, excluding VAT,  for geotechnical measurements of distortions  from tunnel scans for the construction section of the  ‘H51 Pfons-Brenner’. To be carried out on the Austrian side of the project as part of the BBT Brenner Base Tunnel. Contact Brenner Base Tunnel BBT SE, attn Dr Johann Hager, Innsbruck, tel +39 (0)43 5124030, fax +39 (0)43 5124-030/110, email ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=283709-2018.

Ref.n. AP262. 27/18.



Permalink