Dibit Messtechnik GmbH in Innsbruck secured the EUR6.63
million contract, excluding VAT, for
geotechnical measurements of distortions
from tunnel scans for the construction section of the ‘H51 Pfons-Brenner’. To be carried out on the
Austrian side of the project as part of the BBT Brenner Base Tunnel. Contact
Brenner Base Tunnel BBT SE, attn Dr Johann Hager, Innsbruck, tel +39 (0)43
5124030, fax +39 (0)43 5124-030/110, email ava@bbt-se.com.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=283709-2018.
Ref.n. AP262. 27/18.