India, Mumbai/Bombay - in/77

Metro Line 3

Closing Date: 16.09.2017 (Tender Closed)

Invitation to tender, deadline 16.09.2017, for procurement, supply, installation, testing and commissioning of various power supply works including associated civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line 3.    For any additional information contact MMRC’s e-tendering service desk at www.tenderwizard.com/MMRC, tel 022-26597654/022-26597672.Visit https://www.tenderwizard.com=>. Tender n. MMRC/MM3/REL-PYL/NIT/18R. 37/17.



Permalink

Postponed to 05.10.2017 the deadline for the invitation to bid for Design, Manufacture, Supply, Installation, Testing and Commissioning of E&M works comprising of Electrical Sub Stations with HT and LT works, Ventilation and Air Conditioning Systems (VAC), Fire Detection Systems, Fire Suppression (Fire Fighting) Systems, Building Management System (BMS), EOT cranes, Air-Compressors including compressed air piping works and Plumbing Pumps for the Depot Buildings including OCC and at grade Aarey Station for Mumbai/Bombay Metro Line 3. For further information contact  MMRC, attn. R. K. Sharma, Mumbai, +91 22 26590150,  fax +91 22 26590150, email ramesh.sharma@mmrcl.com. Visit https://www.tenderwizard.com. Contract n. MM3-CBS-DEM. 37/17.

 

https://www.tenderwizard.com=>https://www.tenderwizard.com/ROOTAPP/servlet/asl.tw.aac.VendorDocumentsController?enc%3DU%2B5gMnYPA417HkiuQ2esjla%2Fb4Q6%2FeaF4fehrW3HhuDYsn3hZzw0MTUovJ3HazETixJL2QLMUWw3%0D%0Aa8b0RwoBwuuBfzJbaIq6x7l7dK3VnmstlKfCulYOZf7SIAtErxkyGkqiXWSK5oWDUIDAJKSyIjHV%0D%0At4r7reRWutGsq7sikoZvGrbCGtLpaVAT7R80EN9QIKNTwjIop2IjPR1IfTirgA%3D%3D%26chkSum%3D20b26192d0884339f46612bbf7d0910cc0adf546.



Permalink

On 20.06.2017 the bids opened for Pre-Qualification for procurement of Rolling Stock for Colaba-Bandra-SEEPZ Metro-3 project. The following six companies submitted the bids: Hitachi Ltd, CAF SA, Mitsubishi Corporation,  Alstom Transport India Ltd & Alstom Transport SA (Consortium), Kawasaki Heavy Industries & BHEL (Consortium), CRRC Nanjing & CRRC Changchun & CRRC International Corporation Ltd (Consortium). Evaluation is under process. Visit https://www.mmrcl.com/sites/default/files/PQ%20BID%20RS%2020-06-17_0.pdf. 37/17.



Permalink

Mumbai Metro Rail Corporation (MMRC) awarded two key contracts for the Electrical system works of 25 kV Traction and Power supply system of Colaba-Bandra-SEEPZ of the Mumbai Metro Line 3.

M/s Larsen & Toubro Ltd has been awarded the work of Power supply system.

Consortium of Alstom Transport India Ltd & Alstom Transport S.A has been awarded the works of 25 kV AC Traction system.

The works consist of setting up three receiving substations, laying Overhead Rigid conductor system in Underground tunnel alignment for the 33.5 km route length, commissioning of state of art SCADA system in Control office and other associated works. The substations are being planned in a  compact size using a Gas insulation scheme which is the latest technology in the field of power systems. Visit https://www.mmrcl.com/sites/default/files/MMRC%20awards%20Electrical%20works%20contracts%20for%20Metro%20Line%20III.pdf.

08/18.



Permalink

MMRC (Mumbai Metro Rail Corporation) received 6 bids (from Voltas Ltd; Blue Star Ltd; Consortium of ETA and Polycab; Jakson Ltd; Sterling & Wilson Pvt. Ltd;  Sam India Builtwell Pvt. Ltd) for procurement of the state of art Depot (Electrical & Mechanical) system for Colaba-Bandra-SEEPZ Metro-3 corridor. The works includes Design, Supply, Installation, Testing & Commissioning of E&M works.Visit https://www.mmrcl.com/sites/default/files/Press%20Release_Depot%20EM.pdf.

28/18.



Permalink

Postponed from 10/07/2018 to 24/07/2018 the deadline for the Invitation for Bids for Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3 (Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn General Manager (RS & Elect.), tel +91-22-26597659, fax

+91-22-26590150, email rajeev@mmrcl.com. Visit

https://www.mmrcl.com/sites/default/files/TVE%20Phase-1%20Addendum%20No%202.pdf

and https://www.mmrcl.com/sites/default/files/combinepdf.pdf. Ref.n.

MM3-CBS-TVE.28/18.



Permalink

Postponed from 24/07/2018 to 09/08/2018 the deadline for the Invitation for bids for Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3 (Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn General Manager (RS & Elect.), tel +91-22-26597659, fax +91-22-26590150, email rajeev@mmrcl.com. Visit


https://www.mmrcl.com/sites/default/files/TVE%20Phase-1%20Addendum%20No%204.pdf.

Ref.n.MM3-CBS-TVE. 29/18.



Permalink

Postponed from 09/08/2018 to 29/08/2018 the deadline for the Invitation for bids for Design, Manufacture, Supply, Installation, Testing and Commissioning of a Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3 (Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn General Manager (RS & Elect.), tel +91-22-26597659, fax

+91-22-26590150, email rajeev@mmrcl.com. Visit

https://www.mmrcl.com/sites/default/files/Addendum-5%20with%20sign.pdf and https://www.mmrcl.com/sites/default/files/Addendum-6%20published.pdf.

Ref.n. MM3-CBS-TVE. 33/18.



Permalink

The consortium consisting of M/s. ASIS Elektronik ve Billisim Sistemleri A.S., Turkey and Kalindee Rail Nirman – A Division of Texmaco Rail & Engineering Limited, India (Kalindee -ASIS JV) has been awarded the contract for  Design, Manufacture, Supply, Installation, Testing and Commissioning of  Automatic Fare Collection (AFC) System  for the 27 stations of Mumbai Metro Line-3 (MML-3). Visit

https://www.mmrcl.com/sites/default/files/Press%20Release-%20Award%20of%20LoA%20for%20AFC%20%28Package-14%29%20by%20MMRCL%20on%2015.01.2019-converted.pdf.

05/19




Permalink

Shanghai Tunnel Engineering Corporation Ltd. (STEC) has been awarded the contract for Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3 (Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn General Manager (RS & Elect.), tel +91-22-26597659, fax

+91-22-26590150, email rajeev@mmrcl.com. Visit

https://www.mmrcl.com/sites/default/files/Press%20Release-%20MMRC%20awards%20Tunnel%20ventilation%20and%20Environmental%20Control%20System%20Works%20contract%20for%20the%20section%20Aarey%20to%20BKC%20for%20Mumbai%20Metro%20Line-3.pdf

 MM3-CBS-TVE.08/19.



Permalink

Blue Star announced that Mumbai Metro Rail Corporation (MMRCL) has issued a Letter of Intent dated 18 June 2019 to the Company for Design, manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation and Air Conditioning Systems approximately valued at EUR32,38 million (INR2.53 bn), subject to the definitive agreements to be executed between the Company and MMRCL.

The Mumbai Metro is a rapid transit system serving the city of Mumbai, Maharashtra, and the wider metropolitan region. The system is being built in three phases over a 15-year period, with overall completion expected in 2025. When completed, the core system will comprise 8 high-capacity metro railway lines, spanning 235 km, 24% of which underground, with 200 stations. Visit  https://www.bluestarindia.com and https://www.mmrcl.com/en. 25/19.



Permalink