Peru

Peru, Chinango - pe/11

Hydro

  Project combines two stations in the remote Chanchamayo Valley region at Yanango and Chimay, the first for completion mid-2000 and the second a year later. Drill/blast contractors on the Tarma, Yanango access and valves chamber exit tunnels are Grana y Montero using predominantly Atlas Copco equipment in andesite. Jose Cartellone Construcciones Civiles driving 9.6 km using TBM from powerhouse location and drill/blast from an adit 7.5 km upstream. June 1999.Breakthrough reported on 4.3 km-long Chimay drive by 5.7 m-diameter Robbins TBM in ten months at rates of up to 190 m/week. Several areas of weak rock were encountered. Drill/blast drives also completed earlier this year. Visit www.robbinstbm.com May 2000.



Permalink

Philippines

Philippines, National Capital Region - ph/20

Railway

Closing Date: 08.07.2021 (Tender Closed)


Open invitation to tender, deadline 08/07/2021, for Civil Engineering, Tunnel and Building Works for approximately 6.1 km of the South Commuter Railway Project, with 4.7 km of Underground Railway and 1.4km of at Grade Railway, including FTI Station in Taguig and Tunnelling Works to connect to MMSP (Metro Manila Subway Project) Senate Station,  which is also in Taguig. 

 The contract involves: 

  • construction of tunnels (Shield Tunnel and Cut-and-Cover method), a combined At-Grade Station and Underground Station, the West Station Plaza and a Pedestrian passage connecting from the underground station to West Station Plaza, other Civil works. 
  • design and Build of the Building Works of the Underground Station and  of the E&M Works of the Underground Station; 

To obtain further information and to register for bid addenda, pre-bid conference, and site visits contact PS Complex, attn Mr. Julius M. Santos, Paco, Manila, tel +63 2 8290 6300 / 8290 6400, fax +63 2 8290 6300 / 8290 6400, email  bac5_cps03@ps-philgeps.gov.ph.  

For further on tender, please click here. Contract package CP-S-03B. 14/21. 




Permalink

Philippines, Cebu - ph/19

Water Supply

3.8 km-long tunnel connection between Mananga dam and Tisa treatment plant in design. Visit www.electrowatt.ch 39/01.



Permalink

Philippines, Peso - ph/18

Water Supply

Manila water supply project 3 includes reservoir, rockfill dam, tunnels, aqueducts, a 23 MW hydro plant, and distribution network. $962 million project now likely to go ahead as BOT for client Metropolitan Waterworks and Sewerage System, with completion by 2007 to produce 1.5 billion litre/day potable water. Sept 2000.



Permalink

Philippines, Manila - ph/17

Water Diversion

  Breakthrough by Robbins double-shielded TBM reported on 13 km-long, 4.9 m-diameter segmentally lined tunnel to complete connection between Umiray river and Angat reservoir to provide additional 30 % water supply for Manila. Contractor is Italian jv of GLF and SELI, with Angeles Construction Corporation. Visit www.robbinstbm.com May 2000.



Permalink


Invitation to Submit Expression of Interest (EOI), deadline 18.04.2016, for the consulting services for assistance to project management and safeguard the implementation and monitoring during the design and construction of the Ipo to Bigte tunnel n.4. Contact

Metropolitan Waterworks and Sewerage System, attn. Nathaniel Santos, tel (632) 921-2887, e-mail awtip_mwssproject2014@yahoo.com.  Visit 

https://uxdmz06.adb.org/OA_HTML/OA.jsp?OAFunc=XXCRS_CSRN_PROFILE_PAGE&csrnKey=FFAC05B5D1E44A2C1CABE2B54655EA7EFE82A676FBB22825422C9FCFEDED906F&fromDER=Y&refresh_csrn=true. Ref.n. AWTIP-ICB-CW001. 12/16.




Permalink


Metropolitan Waterworks and Sewerage System (MWSS) has been awarded the contract for the Design and Construction of the Angat Water Transmission Improvement Project (AWTIP)  to the Italian company CMC di Ravenna that submitted the lowest bid of EUR61.27 million (Php 3.291 billion) after 12% VAT. The government agency previously disclosed the bid of China Railway Group Ltd. of about EUR67.02 million (Php3.60 billion) and McConnell Dowell Constructors (Aust) Pty Ltd. At EUR72.42 million (Php3.89 billion). Contact Metropolitan Waterworks and Sewerage System, attn. Nathaniel Santos, tel (632) 921-2887, e-mail awtip_mwssproject2014@yahoo.com.  Visit

http://mwss.gov.ph/mwss-awards-angat-water-transmission-improvement-project/. Ref.n. AWTIP-ICB-CW001. 19/16.




Permalink

Philippines, Luzon - ph/16

Marine Highway

Feasibility study completed by Itochu Corporation and NKK for 15 km-long, $4 bn Cavite-Bataan underwater tunnel as part of proposed Trans-Manila Bay Crossing for Subic Bay Metropolitan Authority financed by JBIC. Visit www.itochu.com 33/01.



Permalink

Philippines, Casecnan - ph/15

Hydro

  Tamrock reports that contractor CMC Pizzarotti is using its Maximatic and Paramatic jumbos. Visit www.tamrock.com January 2000.



Permalink

Philippines, San Roque - ph/14

Hydro

Tamrock reports that Raytheon Constructors is using its computer-aided Maximatic 315-120 three-boom jumbos. Product information from www.tamrock.com January 2000.  Some 8.5 km of tunnel completed, comprising 60% of total. Initial poor rock conditions overcome and project back on schedule, largely due to 95% equipment availability. San Roque Power Corporation was formed by Sithe (50.05%), Marubeni (42.45%) and Kansai Electric (7.5%) to implement and operate the project for which overall cost is $1.2 billion funded one-third by Japan Bank for International Cooperation. Station will generate 345 MW for the Luzon grid under 25-year power purchase agreement using 3 x 115 MW turbines supplied by Toshiba. The Philippine Energy Plan requires another 5/6 hydro schemes similar to San Roque to meet its target of 114,000 MW by 2035. Because the National Power Corporation is to be privatised in the near future, these will be predominantly BOT schemes. March 2000.



Permalink

Philippines, Northern Luzon - ph/13

Hydro

Bakun scheme will generate 70 MW at high head and involves much tunnelling. Design engineer Halcrow Water Power for design and construct contractor Transfield Philippines. Nov 1998.   $150 million run of river project is remotely located in the provinces of Benguet, Ilocos Sur and La Union with limited and difficult access. Sponsored by National Power Corporation under 25 year BOOT scheme to Luzon Hydro Corporation. Intake tunnel 9.2 km together with 2 km of 2.5 m-diameter steel penstock completed, but unforeseen ground conditions have necessitated steel lining of a further 1.8 km of intake which will be completed by March, 2000. Contract completion is scheduled for June, 2000. Contact through www.halcrow.com and www.transfield.com.au February 2000.  Proposal mooted for 9 km-long tunnel with mini hydro up the valley chain from power station currently under construction from which the return water will deposit in the Bakun weir enabling the plant to generate electricity for the full 12 months of the year. Visit www.halcrow.com for contact. February 2000.Cordillera Hydro, a consortium of Australian-based Pacific Hydro and the Aboitz group of the Philippines, has awarded McConnell Dowell a contract for the construction of the 4 km Kayapa diversion tunnel, as part of the AUD24 million Bakun supplemental hydro project which, when completed, will feed additional water into the Bakun AC power plant and boost the output by about 50 GWh. The project is located on the Bakun River in Luzon, about 250 km north of Manila. Excavation will be carried out by the drill/blast method using rail mounted equipment. The project also involves construction of two weirs. The project is due for completion in mid 2005. Visit www.pacifichydro.com.au and www.macdow.com.au 31-32/04.



Permalink

Philippines, Mindanao - ph/12

Hydro

Tagoloan 2 project will generate 68 MW. Halcrow Pacific appointed owner's engineer. High head with surface power station. Significant tunnelling work. Nov 1998.  Run of river project to get started in Spring, 2000 with Leighton, Australia as preferred contractor. Conveyance tunnel will be 12.1 km long and powerhouse 650 m long. Weir will hold 4 million cu m of water from a total catchment area of 533 sq km. Total energy generation capacity of 356GW. Visit www.leighton.com.au February 2000.



Permalink