Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Nittedal - no/37

Highway

Open invitation to tender, deadline 30th March, 2001, for construction of 2.6 km-long road tunnel for Statens Vegvesen Akerhus, fax +47 670 59950. Visit www.vegvesen.no 11/01. Open invitation to tender, deadline 26th April, 2001, for road construction with 2.65 km-long tunnel. Contact Statens Vegvesen Akershus, fax +47 639 74253 or visit www.vegvesen.no 13/01.Award of construction contract for 2.6 km-long tunnel with 2.1 km-long approach road to AF Spesialprosjekt. Visit www.vegvesen.no/akershus 44/01.



Permalink

Norway, Ringeriks - no/36

Railway

Line will link Sandvika and Honefoss and will be built with either 28.9 route km of tunnels if route via Kroksund and Busund is chosen, or 37.6 km if via Sundvollen and Asa. Rock is volcanic with sandstone. Choice of TBM or drill/blast, and single or twin tubes. Cost range $375 million to $450 million for construction 2006-2009. Tenders for design expected early 2002. Visit www.jernbaneverket.no 12/01.



Permalink


Norconsult/Aas-Jakobsen/Asplan Viak from Sandvika secured the EUR5.36 million contract, excluding VAT, for  a consultancy assignment for the Ringerike Line/E16 Hogkastet-Honefoss. For electronic access to information: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=158164&B=JERNBANEVERKET. Contact Jernbaneverket, the Norwegian National Rail Administration, attn Lisbeth Smedbraten, Oslo, e-mail marianne.naro@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=240887-2016. Ref. 201600518. 28/16.




Permalink

Norway, Tonsberg - no/35

Highway

Tenders expected January, 2001 for design of single-tube, 1.7 km-long ring road tunnel to be constructed in 2003 by drill/blast with rockbolts and shotcrete support for opening 2006. Contact www.vegvesen.no/vestfold for further details. 02/01.



Permalink

Norway, Ski - no/34

Railway

Proposed 13 km-long railway between Rosenholm and Ski will require 6+ km of tunnels, longest of which will be 4 km and 1.5 km. Tenders for engineering design expected mid-2001 for construction start in 2005. Visit www.jernbaneverket.no/prosjekter 03/01.



Permalink

Norway, Nordland - no/33

Highway

Proposed 8.5 km two-lane, single-tube road tunnel at Korgenfjell in design by Statens Vegvesen Nordland for tender late-2001 and construction start mid-2002 for opening within three years. Visit www.vegvesen.no December 2000.Open tendering for 4.3 km-long tunnel with T8.5 profile excavated cross section of 65 sq m and traffic cross section of 50 sq m, deadline 14th December, 2001. Drill/blast in mica schist, mica gneiss and calcite-marble of the Caledonian period. Statens Vegvesen Nordland is the client, engineering firm and financier. Cost estimated at NKR25-35,000/m. Contract award early February, 2002. Work completion set for 28th October, 2005. Visit http://ted.eur-op.int, document S 202-138510, or contact Norwegian Public Roads Administration, Mosjí¸en, fax +47 75 171322. Visit www.vegvesen.no/nordland 44/01.Open procedure, deadline 25th June, 2004 for supply of 36 booster fans for the Korgfjell tunnel with a power of 28 kN. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074427-2004, OJ S 91, or contact Statens vegvesen, Bodoe, fax +47 75192596. E-mail viktor.eivik@vegvesen.no 21/04.Open call for tenders, deadline 28th January, 2005 for construction of section Ingelsfjord tunnel-Vesterstraumen (6.2 km) on highway E10 including the 1,240 m Ingelsfjord tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=200095-2004, OJ S 232, or contact Statens vegvesen Region north, Bodoe, fax +47 75552951. E-mail firmapost-nord@vegvesen.no 50/04.Veidekke secured a NOK91.5 million contract to construct section Ingelsfjord tunnel-Vesterstraumen (6.2 km) on highway E10, including the 1,240 m Ingelsfjord tunnel. Visit www.veidekke.no 29/05.Open invitation to tender, deadline 7th November, 2005 for the delivery of directional control fans for four tunnels: Soerdals (6,370 m), Ingelsfjord tunnel (1,240 m), Raftsund (1,530 m) and Fjoesdal (1,600 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=177580-2005, OJ S 179, or contact Statens vegvesen, Bodoe, fax +47 75586501. E-mail robjak@vegvesen.no 38/05.



Permalink

Prior information notice of intended commencement of award procedures on 20.08.2010 for construction of 2,650 m-long, 8.5 m-wide Fv 76 Malvikhammeren tunnel at Tosbotn. NT Ref 206399. Further information from Ole-Johan Bogfjellmo at Statens vegvesen Region nord in Bodoe, tel +47 06640, e-mail olebog@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=159997-2010. 22/10.



Permalink

Open invitation to tender, deadline 28.10.2010, for construction of 2,700 m-long, T8-section Malvikhammar tunnel with water and frost protection, five breakdown niches and one turn niche, two portals, 260 m-long access road to new Fv 76 road towards Forneset, and 150 m-long connection roads at each end. Construction area situated near County road 76 at the farther end of Tosenfjorden. Further information, specs and docs from Borre Langaard at Veg Helgeland, Statens vegvesen Region nord in Mosjoen, tel +47 91768750, e-mail borlan@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=296736-2010. 40/10.



Permalink

Deadline postponed from 28.10.2010 to 04.11.2010 for open invitation to tender for construction of 2,700 m-long, T8-section Malvikhammar tunnel with water and frost protection, five breakdown niches and one turn niche, two portals, 260 m-long access road to new Fv 76 road towards Forneset, and 150 m-long connection roads at each end. Construction area situated near County road 76 at the farther end of Tosenfjorden. Further information, specs and docs from Borre Langaard at Veg Helgeland, Statens vegvesen Region nord in Mosjoen, tel +47 91768750, e-mail borlan@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=318317-2010. 44/10.



Permalink

Open invitation to tender, deadline 04.03.2015, for tunnel upgrade project Northern Region, sub project Nord-Trondelag border - Fauske. The contract includes the following tunnels on the E6: Korgfjell (8,533 m), Finneidfjord (857 m), Nesset (578 m) , Illhollia (1,260 m), Saksenvik (1,148 m), Kvaenfloget (1,747 m), Pytjehajen (110 m), Breivikhammar (186 m), Nordmark (184 m), Dalmovikhals (164 m), Saltnes (466 m) and Setsahogda (180 m). The last six tunnels can be withdrawn from the contract if there is a lack of financing. For electronic access to information go to https://kgv.doffin.no/ctm/Supplier/Documents/Folder/125642. Contact Statens vegvesen Region Nord, attn Stian Rystad, Mosjoen, tel +47 95018513, e-mail stian.rystad@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=7204-2015, GU S 006. Ref.n. 2014143431. 03/15.



Permalink


Award of contract to Scanmativ Elektro of Stauboe, value EUR16,870,673 excluding VAT, for tunnel upgrade project Northern Region, sub project Nord-Trondelag border - Fauske. The contract includes the following tunnels on the E6: Korgfjell (8,533 m), Finneidfjord (857 m), Nesset (578 m) , Illhollia (1,260 m), Saksenvik (1,148 m), Kvaenfloget (1,747 m), Pytjehajen (110 m), Breivikhammar (186 m), Nordmark (184 m), Dalmovikhals (164 m), Saltnes (466 m) and Setsahogda (180 m). The last six tunnels can be withdrawn from the contract if there is a lack of financing. Further information from Statens vegvesen Region Nord, attn Stian Rystad, Mosjoen, tel +47 95018513, e-mail stian.rystad@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=183412-2015. 22/15.




Permalink


Open invitation to tender, deadline 29/08/2022, for supplying/ increasing the current safety equipment in the Sørfold tunnels on E6: Aspfjord (1496 m), Berrflog(et)(1407 m), Daumannvik (822 m), Gleflog(et)  (501 m), Kalvik (2729 m), Kannflog(et) (756 m), Kobbhammar (837m), Kobbskar(et) (4457 m), Løkthaug(en) (725 m), Middagsfjell(et) (2074 m), Rauhammar(en) (1250 m) and Tennflog(et) (805). For tender documents please click here, where tenders must be sent. Duration of the contract is from 03/10/2022 to 30/10/2023. The offer conference will take place on 11 August 2022 at 12:00. Registration should be sent to jan-erik.stenmark@vegvesen.no by Monday 08/08/2022 at 12:00 Contact Norwegian Public Roads Administration, attn Tine Maria Storhaug, Moss, email tine.storhaug@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=381319-2022. Ref.n. 20/ 90575. 30/22. 

 




Permalink


Competitive dialogue, deadline 04/11/2022, for the upgrading of the E10 Nappstraum tunnel 1780 m-long and underwater in Vestvagoy and Fladstad Municipalities. For tender documents click here, where tenders must be sent. Duration of the contract is until 01/12/2026. Contact Norwegian Public Roads Administration, attn Tatiana Liknes, Moss, email tatiana.liknes@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=545551-2022. Ref.n. 21/8133. 41/22. 

 

Norway-Moss: Construction work


2022/S 192-545551

Contract notice

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Statens vegvesen
National registration number: 971 032 081
Postal address: Skoggata 19
Town: Moss
NUTS code: NO082 Viken
Postal code: 1500
Country: Norway
Contact person: Tatiana Liknes
E-mail: tatiana.liknes@vegvesen.no
Internet address(es):
Main address: http://www.vegvesen.no
Address of the buyer profile: https://eu.eu-supply.com/ctm/Company/CompanyInformation/Index/249176
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=342453&B=VEGVESEN
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=342453&B=VEGVESEN
Tenders or requests to participate must be submitted to the abovementioned address
I.4)Type of the contracting authority
Ministry or any other national or federal authority, including their regional or local subdivisions
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Project Tromsø - E10 Nappstraum tunnel

Reference number: 21/8133
II.1.2)Main CPV code
45000000 Construction work
II.1.3)Type of contract
Works
II.1.4)Short description:

The tunnel upgrade project Northern region is part of a national project that includes the upgrade of all national road tunnels in accordance with the "Regulations on minimum safety requirements for certain road tunnels" (Tunnel Safety Regulations).


The work in this contract concerns upgrades to the E10 Nappstraum tunnel in Vestvågøy Municipality and Fladstad Municipality.


- E10 Nappstraum tunnel 1780 m underwater

II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
45000000 Construction work
II.2.3)Place of performance
NUTS code: NO074 Troms og Finnmark
Main site or place of performance:

8A.

II.2.4)Description of the procurement:

The tunnel upgrade project Northern region is part of a national project that includes the upgrade of all national road tunnels in accordance with the "Regulations on minimum safety requirements for certain road tunnels" (Tunnel Safety Regulations).


The work in this contract concerns upgrades to the E10 Nappstraum tunnel in Vestvågøy Municipality and Fladstad Municipality.


- E10 Nappstraum tunnel 1780 m underwater

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
End: 01/12/2026
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
Envisaged minimum number: 3
Maximum number: 4
Objective criteria for choosing the limited number of candidates:

Selection amongst the qualified tenderers will be based on the contracting authority's evaluation of


which of the qualified tenderers best fulfils the following criteria:


• The tenderer's technical and professional qualifications in accordance with qualification requirement B2 point 2.4.1.

II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: no
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

The tender conference will be held digitally on 19 October 2022 at 12:00.


Registration for participation in the tender conference must be submitted via the Tender Management System (Norwegian abbreviation: KGV).

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
List and brief description of conditions:

Tenderers must be a legally established company or consist of a group of contractors who are legally established companies.


The requirement also applies to businesses the tenderer relies on, cf. B2 point 4.1.


Tenderers must not be a unit that is affected by the ban in section §8n in the Ukraine sanction regulations.

III.1.2)Economic and financial standing
List and brief description of selection criteria:

Tenderers must have adequate economic and financial capacity to comply with the contractual obligations and, in addition, fulfil the following requirements:


1. Tenderers must have equity of minimum NOK 5 million. 2. Tenderers must have an equity ratio of at least 10 %. 3. Tenderers must have an average annual turnover of minimum NOK 70 million in the last three fiscal years.

Minimum level(s) of standards possibly required:

See the tender documentation for a further description.

III.1.3)Technical and professional ability
List and brief description of selection criteria:

Tenderers must have sufficient experience with the execution of projects of a relevant nature and degree of difficulty.


Tenderers must have the sufficient experience of a relevant nature and degree of difficulty from the following central work:


- Blasting and securing in tunnels - Traffic management - Electrotechnical installations and automation - Model-based engineering

Minimum level(s) of standards possibly required:

See the tender documentation for a further description.

III.2)Conditions related to the contract
III.2.2)Contract performance conditions:

See the tender documentation for a further description.



Permalink


Mesta AS from Lysaker secured the EUR4.88 million (NOK51.12 million) contract, excluding VAT, for supplying/ increasing the current safety equipment in the Sørfold tunnels on the E6 which include - Aspfjord (1496 m), Berrflog(et)(1407 m), Daumannvik (822 m), Gleflog(et)  (501 m), Kalvik (2729 m), Kannflog(et) (756 m), Kobbhammar (837m), Kobbskar(et) (4457 m), Løkthaug(en) (725 m), Middagsfjell(et) (2074 m), Rauhammar(en) (1250 m) and Tennflog(et) (805 m). Contact Norwegian Public Roads Administration, attn Tine Maria Storhaug, Moss, email tine.storhaug@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=704178-2022. Ref.n. 20/ 90575. 51/22. 



Permalink

Norway, East & West Agder - no/32

Highway

Open invitation to tender, deadline 30th April, 2001, for 1 km-long road tunnel for Statens Vegvesen Vest Agder, fax +47 381 21501. Visit www.vegvesen.no December 2000.Veidekke and its subsidiary Br. Reme scooped NOK239 million contract to build the 2 x 1 km Oddernes tunnel on E18 highway in sand and silt. Cross section is 6 m-high and 10 m-wide. Cut-and-cover method. Completion date set to 1st June, 2004. Visit www.veidekke.no 46/01.Negotiated procedure, deadline 7th April, 2005 for design, build, finance and operate contract under a 25-year PPP contract for the 38 km Grimstad-Kristiansand section of the E18 motorway in Grimstad, Lillesand and Kristiansand municipalities, including tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=031939-2005, OJ S 33, or contact Statens vegvesen, Oslo, fax +47 22073673. E-mail firmapost@vegvesen.no. The information memorandum on prequalification for the project will be published on 21st February at www.ppproads.no. An open day for potential bidders will be held to explain the project in Kristiansand on 2nd March, 2005. Bidders who wish to attend should send a message to firmapost@vegvesen.no 08/05.Just two months after its selection as preferred bidder, Bilfinger Berger has reached a financial agreement on its first concession project in Norway. Consortium Agder OPS Vegselskap led by Bilfinger Berger BOT (50%) and including Sundt (35%) and E. Pihl & Son (15%) will finance, design, construct and operate for 25 years a 38 km section of the E18 highway between Grimstad and Kristiansand. The contract amounts to NOK3.3 billion. The section is part of the new highway between Oslo and Kristiansand. Design and construction includes four bridges and seven twin bored tunnels: Kvernasen (150 m), Skifjell (1,060 m), Songefjellheia (350 m), Bjellandsvad-Steindal (1,560 m), Steindal-Urdal (2,190 m), Loehia (130 m) and Studeheia (300 m), totalling approx. 2 x 5,740 metres. Each tube will carry two lanes with profile T9.5. Construction will be executed under the technical leadership of Bilfinger Berger's civil engineering division. The highway section will open on 1st September, 2009. Visit www.bilfinger.de, www.ppproads.no and www.vegvesen.no/ppp/pdf/Infohefte_PPP_E18.pdf 31-32/06.



Permalink

Open invitation to tender, deadline 20.01.2011, for planning a new four-lane E18 between Tvedestrand and Arendal in Aust-Agder county. Assignment includes bridge, tunnel and geotechnical competence, period 01.04.2011 to 31.12.2012. Further information from Stian Blindheim at Statens vegvesen Region south in Arendal, tel +47 81548000, e-mail firmapost-sor@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=367315-2010. 50/10.



Permalink

Prior information notice of start of award procedures during May/June, 2012 for the development plan of new E18 between Tvedestrand and Arendal following agreed plan for the same stretch. Requested expertise is road planning, geotechnical engineering, bridge and tunnel expertise. Register interest and view any additional information at http://www.doffin.no/Search/Search_Switch.aspx?ID=250597. Further information from Stian Blindheim at Statens vegvesen Region south in Arendal, tel +47 81548000, e-mail stian.blindheim@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058644-2012. 13/12.



Permalink

Open invitation to tender, deadline 03.09.2012, for installation of automatic incident detection (AID) system in Banehei and Oddernes tunnels in Kristiansand municipality. Register interest and obtain additional details at www.doffin.no/Search/Search_Switch.aspx?ID=263079.  Further information, specs and docs from Jan-Oyvind Pedersen at Statens vegvesen Region sor at Arendal, tel +47 81548000, e-mail jan-oyvind.pedersen@vegvesen.no to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=219947-2012. 28/12



Permalink

Award of contract to Trafsys AS of Bergen for installation of automatic incident detection (AID) system in Banehei and Oddernes tunnels in Kristiansand municipality. Further information from Jan-Oyvind Pedersen at Statens vegvesen Region sor at Arendal, tel +47 81548000, e-mail firmapost-sor@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=389994-2012. 50/12.



Permalink


Negotiated invitation to tender, deadline 08.04.2016, for the design and build of the highway section of E18 Tvedestrand-Arendal, a 23 km-long stretch including  four T9 tunnels: Fløyheia (610 m), Traelfjell (205 m), Hesthag Mountain (684 m) and Torsbuasen (785 m). For electronic access to information and submission of tenders  http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=158779&B=NYEVEIER. Contact Nye Veier AS, attn Bjørn Børseth, Kristiansand, tel +47 97501310, e-mail bjorn.borseth@nyeveier.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=71927-2016. Ref.n. 2016-P001. 09/16. 




Permalink

AF Gruppen Norge AS at Oslo secured the EUR332.27 million contract, excluding VAT, for the design and build of the highway section of E18 Tvedestrand-Arendal, a 23 km-long stretch including  four T9 tunnels:

Fløyheia (610 m), Traelfjell (205 m), Hesthag Mountain (684 m) and Torsbuasen (785 m). Contact Nye Veier AS, attn Bjorn Borseth, Kristiansand, tel +47 97501310, email bjorn.borseth@nyeveier.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=346287-2017 .

Ref.n. 2016-P001. 36/17.



Permalink

AF Gruppen Norge AS from Oslo secured the EUR332.27 million contract, excluding VAT, for the design and build of the highway section of E18 Tvedestrand-Arendal, a 23 km-long stretch including  four T9 tunnels: Fløyheia (610 m), Traelfjell (205 m), Hesthag Mountain (684 m) and Torsbuasen (785 m). Contact Nye Veier AS, attn Bjorn Borseth, Kristiansand, tel +47 97501310, email bjorn.borseth@nyeveier.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=346287-2017 .

Ref.n. 2016-P001. 36/17.



Permalink

Norway, Gardermoen - no/31

Highway

Tenders invited for State-funded single 3.8 km road tunnel between Lunner and Gardermoen with 47 sq m section through mixed geology including volcanic and sedimentary rocks. Probably drill/blast with rockbolts and shotcrete. Contract award scheduled for May, 2001 value $14 million. Completion December, 2003. Visit www.vegvesen.no November 2000.Staten Vegvesen Akershus, the Norwegian Road Administration's department in Akershus region, has commissioned Swedish construction group NCC to construct a new two-lane highway between Lunner and Oslo's Gardermoen Airport including a 2,500 m tunnel. Assignment worth approximately SEK229 million. NCC will be the main contractor for the project. Work has already commenced and the highway will be completed in July 2003, according to the company. Visit www.nccnorge.no and www.ncc.se 41/01.



Permalink

Norway, Skedsmo - no/30

Highway

Open tendering for construction of road with tunnel comprising 580 m-long x 10 m-wide section which branches into two 200 m-long x 8.5 m-wide legs in fine grained and middle grained gneiss. 160 m from south portal already mined using Matiere precast elements. 50 m from north portal will be cut-and-cover in soft rocks. There is a known weak zone of 30 m in the middle of the alignment. For documents fax Statens Vegvesen Akershus +47 638 34477 or visit www.vegvesen.no November 2000.



Permalink

Competitive negotiated procedure, deadline 20/04/2022, for the construction of Helen Ltd's Sea Water System Project Alliance (Sea Water Heat Recovery Project) at Helsinki-Baltic Sea involving a heat pump plant, a 17 km long sea water intake tunnel to be driven with TBM and a maximum 9 km sea water discharge tunnel to be performed using drilling&blast. Click here https://tarjouspalvelu.fi/helen?id=389511&tpk=1dadab0e-d9c6-4b2a-8b26-d2f3f8462d78 for tender documents and where tenders must be sent. Value contract EUR450 million, excluding VAT. Duration contract 85 months. Contact Helen Ltd, attn Riikka Olkkonen, Helsinki, tel +358 96171, email riikka.olkkonen@helen.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=166937-2022. Ref.n. 389511.  13/22. 



Permalink

Norway, Vestfold - no/29

Railway

Feasibility study underway by Hjellnes Cowi AS of Oslo for four tunnels between Porstrum and Larvik: Storberget 4.6 km; Skillingsmyr 3.8 km; Martinaasen 3.6 km; and Eidanger 2.2 km. All with standard single-track section of 65 sq m except for 1 km crossover section of Storberget which is 100 sq m. Drill/blast with rockbolts and shotcrete in labradorite. Construction to commence 2002 with completion 2010. Contact at www.hjelcowi.no October 2000.Negotiated procedure, deadline 9th October, 2007 for construction of a 4.4 km section (the Jarlsberg contract UBT01) on the new double-track railway from Barkí¥ker to Tí¸nsberg (7.9 km), including amongst other works a 1.7 km tunnel. This section has been designed by Norconsult, Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=207910-2007, OJ S 168, or contact Jernbaneverket, Oslo, tel. +47 91650262. E-mail gret@jbv.no 37/07.Invitation to tender, deadline 23.01.2009, for 7.9 km-long double track railway construction works including 1.7 km-long tunnel at Tonsberg with 220 sq m cross section involving 200,000 cu m of rock blasting. Scheduled start of works 02.03.2009 for completion 31.03.2011. http://ted.europa.eu/udl?request=Seek-Deliver&language=es&docid=268484-2008 OJ S205 Contact Arild Herfindal, tel +47 91 53 76 55, e-mail hear@bv.no 43/08.



Permalink

Contract for excavation and ballasting of a 4.4 km sub-stretch of Barkaker-Tonsberg twin-track railway, including construction of a 1.7 km-long tunnel with 220 sq m cross-section together with portals and culvert, awarded to AF-Jarlsberg, a cooperation between Reinertsen Anlegg A/S and Leonhard Nilsen og Sonner A/S, value EUR52 million, including VAT @ 25%. Visit www.reinertsen.no and http://eng.lns.no/content/view/full/205. All work to be completed by Spring, 2011. More from Arild Herfindal at Jernbaneverket Utbygging in Oslo, tel +47 9153 7655, e-mail hear@jbv.no. For project history visit tunnelbuilder archive no/29. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=093165-200914/09.



Permalink

Open invitation to tender, deadline 08.01.2010, for establishing 4.6 km double track tunnel, 260 m crosscut, and 650 m of escape tunnels and all ground works in Holmestrand municipality as part of Holm-Nykirke, UHN01 Skoskog contract. Contract commencement on 05.02.2010 for completion on 01.01.2014. Further information, specs and docs from Hakon Bratlien at Jernbaneverket Utbygging in Tonsberg, tel +47 05280, fax +47 91656276, e-mail brah@jbv.no to whom tenders or requests to participate should be sent. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=278041-2009. 41/09.



Permalink

Open invitation to tender, deadline 09.04.2010, for construction of double-track tunnel of about 2 km, two escape tunnels of total length 830 m, and 1.4 km-long open zone track as part of the Holmen contract UHN03, double track Holm-Nykirke. Contract commencement 01.07.2010 for completion 15.06.2014. Further information, specs and docs from Hakon Bratlien at Jernbaneverket in Tonsberg, tel +47 05280, fax +47 91656276, e-mail brah@jbv.no to whom tenders or requests to participate should be sent. Time limit for requesting or accessing documents 09.03.2010. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=028561-2010. 05/10.



Permalink

Invitation to tender using negotiated procedure, deadline 15.05.2013, for qualification of engineering professionals for electrical installations contract UHN11 along 14.2 km-long double track Holm-Nykirke section which includes 12.3 km-long Holmestrand tunnel and station hall with 11 escape tunnels. Contract duration 42 months. Further information, specs and docs from Oystein Islann at Jernbaneverket in Narvik, tel +47 40435349, e-mail isloys@jbv.no to whom tenders or requests to participate should be sent. Register interest at www.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=102659&B=JERNBANEVERKET. NT Ref 291316. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=128079-2013. 16/13.



Permalink

Invitation to tender using negotiated procedure, deadline 30.09.2013, for the delivery of emergency lighting (contract UHN10) for the 14.2 km-long double track Holm-Nykirke section, 12.3 km of which in tunnel. Further information, specs and docs from Kristin Andresen at Jernbaneverket in Oslo, tel +47 22455000. Register interest at https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=112197&B=JERNBANEVERKET, N.Ref 304045. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=294091-2013. 36/13.



Permalink

Invitation to tender using negotiated procedure, deadline 25.10.2013, for tracks/contact line (contract UHN11) for the 14.2 km-long double track Holm-Nykirke section, 12.3 km of which in tunnel. Register interest at https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=113208&B=JERNBANEVERKET. Further information, specs and docs from Kristin Andresen at Jernbaneverket in Oslo, tel +47 22455000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=324979-2013. N.Ref. 306253. 40/13.



Permalink

Invitation to tender using negotiated procedure, deadline 04.11.2013, for low voltage electrical installations contract UHN12 along 14.2 km-long double track Holm-Nykirke section which includes 12.3 km-long Holmestrand tunnel and station hall with 11 escape tunnels. Contract, value EUR30.85 million, should be awarded March, 2014 for construction start May, 2014 and completion late-2017. Further information, specs and docs from Kristin Andresen at Jernbaneverket in Oslo, tel +47 22455000, e-mail andkri@jbv.no to whom tenders or requests to participate should be sent. Register interest at www.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=113778&B=JERNBANEVERKET. NT Ref 307111. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=337443-2013. 41/13.



Permalink

Invitation to tender using negotiated procedure, deadline 18.02.2014, for structural and technical contract (UHN 08) at Holmestrand station along 14.2 km-long double track Holm-Nykirke section. The contract includes the following main works: acoustic ceilings above tracks and above platforms; ceilings in access tunnels; slate works in access tunnels and stone veneer of walls lighting in station hall and access tunnels; ventilation system and facility for air treatment, heating and cooling of technical rooms; electrical power installations to distribution systems for lighting, technical facilities and lifts; electrical power installations to telecommunications and railway technical facilities; and water mist facilities in the station hall. Contact Kristin Andresen at Jernbaneverket in Oslo, tel +47 22455000, e-mail postmottak@jbv.no. Register interest at https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=119177&&B=JERNBANEVERKET. Ref. n. 97101. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=032033-2014. 05/14.



Permalink

Invitation to tender using negotiated procedure, deadline 03.03.2014, for contract 201400691 project engineering services for 14.2 km-long double track Holm-Nykirke section. Contract value EUR358,000, duration 21 months. Contact Christian Sundelin at Jernbaneverket in Oslo, tel +47 22455000, e-mail postmottak@jbv.no. Register interest at https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=119996&B=JERNBANEVERKET. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=045611-2014. 07/14.



Permalink

Award to Swarco Norge AS, Oslo of contract UHN10, value EUR4,573,766 excluding VAT, for the delivery of emergency lighting for the 14.2 km-long double track Holm-Nykirke section, 12.3 km of which in tunnel. Further information from Kristin Andresen or Svein Hillestad at Jernbaneverket in Oslo, tel +47 05280, fax +47 22455499, e-mail postmottak@jbv.no. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=069011-2014. 10/14.



Permalink

Invitation to tender using negotiated procedure, deadline 24.04.2014, for UHN18 contract 201401537 interdisciplinary works on interface between existing and new installations and signals on Holm-Nykirke railway from Galleberg station to Skoppum station in Holmestrand. Contract value EUR12 million, duration 01.08.2014-15.08.2016. Further information, specs and docs from Svein Hillestad/Kristin Andresen at Jernbaneverket in Oslo, tel +47 22455000, e-mail hisv@jbv.no, to whom tenders or requests to participate must be sent. Register interest and obtain electronic access for information and submission at https://www.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=122315&B=JERNBANEVERKET. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=102278-2014. 13/14.



Permalink

Norway, Katterat - no/28

Railway

Announcement of restricted tendering for construction of 1.1 km-long rail tunnel for Jernbaneverket north region, deadline 6th October, 2000. Visit http://ted.eur-op.eu.int or fax +47 7257 2600. October 2000. Award to Selmer Skanska of $4.5 million, 50 sq m x 950 m-long drill/blast tunnel in granite to commence immediately for completion end-2001. Visit www.selmer.no 28/01.



Permalink