Cowi AS from Oslo have secured the contract for the engineering design for the Light Rail, Construction stage 5, from the Bergen centre through Åsane to Vågsbotn. Stage 5 involves a 12.8 km section with 14 stops, a continual cycle route and a 2.5km extension of the Fløyfjell tunnel to Eidsvåg. The total length of the tunnel will be 5.3km. Contact Bybanen Utbygging, att Cecilie Thiis, Bergen, email johanne.cecilie.thiis@vlfk.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=344280-2023. Ref. E03. 24/23.