Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Two TERRATEC EPBMS ready for Bangkok flood prevention project

30/12/2022
Two TERRATEC EPBMS ready for Bangkok flood prevention project

Two new TERRATEC TBMs will take part in the Khlong Prem Prachakorn Drainage Tunnel Project for the Department of Drainage and Sewage Bangkok Metropolitan Administration (BMA) in Thailand.


In November, TERRATEC celebrated the successful Factory Acceptance Test of a new 6.49m diameter Earth Pressure Balance Tunnel Boring Machine (EPBM) destined for the Khlong Prem Prachakorn Drainage Tunnel Project in Bangkok, Thailand. The event was attended online by representatives of Department of Drainage and Sewerage BMA and contractor Italian Thai-Nawarat Joint Venture. The second Factory Acceptance Test for another EPBM will take place in early Jan. 2023.

The two new TBMs will be used to build a water draining tunnel that is 13.3km long and 5.7m-wide, going from Klong Bang Bua to the Chao Phraya River. In addition to this tunnel, a water pumping station will be built along with a water draining building and four water receiving buildings. To accommodate the alignment requirements of the project, the TERRATEC machines are designed with active-type articulation that can accommodate the minimum radius curve of 50m and 25m. The geological conditions along the tunnel alignments will consist of soft, medium, stiff sandy clay & sand and therefore the TBM’s soft ground cutterhead features a flat spoke type with copy cutters. Traditionally reinforced, 300mm thick by 1400mm wide, Universal reinforced concrete segments (5 + 1) will be installed as the machine progresses.

Muck removal, segment transport and supply of consumables will be via rail-bound equipment using battery locomotives. Designed to improve water management in Thai capital, Bangkok from floods when it rains heavily, the project is to build a water pumping station and water draining buildings. Four water receiving buildings and a water draining tunnel with 5.7 m diameter and 13.4 km in length will be constructed. Machine operation will be assisted at all times by TERRATEC’s highly-experienced Field Service staff, providing quality after-sales support to ensure optimum performance and successful project completion.

Following the successful factory acceptance test, TBM S101 has already been delivered in Dec. The second TBM S100 will be shipped to Thailand and will arrive in early 2023. The two TBMs will then be transported to the project site where they will be launched in the middle of 2023.

TERRATEC has a well-established regional base in Thailand, having sold its first machine in the country more than ten years ago for the Metropolitan Rapid Transit (MRT) Blue Line Extension Project. With outstanding tailor-made robust TBM design, prompt onsite assistance, readily available stock of TBM spares and specialised TBM support throughout the tunnelling operation, TERRATEC has become the country’s leading TBM supplier. For further information on TERRATEC in the tunnelbuilder archive please click here.  

For more information visit: www.terratec.co and for Media inquiries please use info@terratec.co  / pr@terratec.co. 52/22.




NEED QUALIFIED PERSONNEL?