On 27/11/ a third TBM was completed at the Herrenknecht AG plant. The TBM is 10.5 m in diameter, 2000 tonnes in weight and 180 m long. It will excavate an 8.3 km section of TELT's Turin-Lyon base tunnel, starting from the Praz construction site (Lot CO6) and will head southwards towards Italy, and go as far as Modane. The TBM will continue on from the work already carried out by the TBM Federica. For further information click here, fr/11 and it/80 for the tunnelbuilder archive. Visit https://www.telt.eu/en/. 48/23.
20.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
11.06.2024 Czech Republic
02.07.2024 Switzerland
15.12.2024 Austria