Virginia Department of Transportation and Hampton Roads Connector Partners (HRCP) will celebrate the arrival of TBM Mary at The Port of Virginia Portsmouth Marine Terminal on the 14th December 2021. TBM Mary is 146 m (430 feet) long and 14 m (46 feet) in diameter and will bore the new twin tunnels as part of the Hampton Roads Bridge-Tunnel Expansion Project, which includes the widening of 16 km (10 miles) of the I-64. Click here for information on attending the event. For further information on the project and to follow its progress Click here and us/125 for the tunnelbuilder archive reports. Also visit www.hrbtexpansion.org and https://www.virginiadot.org/. 50/21.
12.01.2026 Austria
14.01.2026 Netherlands
15.01.2026 Spain
16.01.2026 Germany
20.01.2026 Romania
23.01.2026 Switzerland
23.01.2026 Ireland
26.01.2026 Italy
26.01.2026 Germany
29.01.2026 Bosnia and Herzegovina
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway