In Argentina, Mr Juan Pablo Piccardo, president of SBASE (Subterraneos de Buenos Aires Sociedad del Estado) announced that the Buenos Aires authority will launch this year a EUR624-713 million tender to build the first stage of driverless metro Line F from Constitution Plaza Callao to Santa Fe. Works will begin in 2016 and take four years. By law 670, dated 2001, the alignment of Line F has to be from Constitution Plaza Callao to Plaza Italia after a Systra project proposed to divert the line to Law University, with the interchange with the future line H. The alignment of the second part of line F is still to be chosen.
The line will be served by seven-car trains operating at 90 second intervals to serve up to 500,000 passengers/day. It will employ communications-based train control (CBTC) and platform screen doors. Visit www.sbase.com.ar. 18/15.
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Italy
11.04.2025 Switzerland
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
27.06.2025 Switzerland