In Argentina, Mr Juan Pablo Piccardo, president of SBASE (Subterraneos de Buenos Aires Sociedad del Estado) announced that the Buenos Aires authority will launch this year a EUR624-713 million tender to build the first stage of driverless metro Line F from Constitution Plaza Callao to Santa Fe. Works will begin in 2016 and take four years. By law 670, dated 2001, the alignment of Line F has to be from Constitution Plaza Callao to Plaza Italia after a Systra project proposed to divert the line to Law University, with the interchange with the future line H. The alignment of the second part of line F is still to be chosen.
The line will be served by seven-car trains operating at 90 second intervals to serve up to 500,000 passengers/day. It will employ communications-based train control (CBTC) and platform screen doors. Visit www.sbase.com.ar. 18/15.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden