Aecom Inocsa SL secured the EUR397,956 contract, excluding
VAT, for the design and the hydrogeological monitoring of tunnels on the Alar
del Rey-Aguilar de Campo section, on the high speed line from Palencia to
Santander. Contact Adif Alta Velocidad, Madrid, tel +34 917744804, fax +34
917674490, email contrataciondcc@adif.es.
Visit
http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=271749-2018
and
https://contrataciondelestado.es/wps/wcm/connect/d5670a86-b174-4dbf-b58b-635d5ae1d681/DOC_CAN_ADJ2018-094322.pdf?MOD=AJPERES.
25/18.