Request for proposal, deadline 05.03.2018, for widening and upgradation to
2 lane with paved shoulder configuration and geometric improvement from km
0.000 to km 16.990 on Chenani – Sudhmahadev section of NH-244 on EPC Basis through an Engineering, Procurement and Construction (EPC) Contract.
A tunnel of 4.5 kms has also been proposed between Sudhmahadev and Goha village to operationalise the re-alignment. The length of this stretch is
16.99 kms. Visit
http://nhidcl.com/tenders/tendors/uploads/2a96f/NIT%2017012018.pdf and http://nhidcl.com/tenders/tendors/uploads/2a96f/Amendment%20no%202.pdf.
10/18.